E 52/4044
Register summary
- Holder
- Bresnahan Exploration Pty Ltd
- Local government
- Shire of Meekatharra
- Application received
- 28 Jan 2022
- Commenced
- 27 May 2024
- Expiry
- 26 May 2029
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A153765 | 2026 | Bresnahan Exploration Pty Ltd | Bresnahan | <1% | Partial Surrender Report E52/4041 and E 52/4042 (Bresnahan) for the period ending 06/01/2026 |
| A153783 | 2026 | Baracus Pty Ltd | Turee Creek | <1% | Final Surrender Report for E52/4281 Turee Creek for the period ending 16/12/2025. |
| A146208 | 2025 | Bresnahan Exploration Pty Ltd | Bresnahan | <1% | Bresnahan E52/4041 Partial Surrender 21 May 2024 to 2 December 2024 |
| A153016 | 2025 | Baracus Pty Ltd | Turee Creek | <1% | Annual Report for Turee Creek (E52/4281) for the period ending 10/11/2025 |
| A145790 | 2024 | Hurricane Prospecting Pty. Ltd. | North | <1% | North Iron Project Annual Technical Report E52/3904 for the period ending 5/5/2024 |
115 more reports
| A136854 | 2023 | Hurricane Prospecting Pty. Ltd. | E52/3904 | <1% | Annual Technical Report E52/3904 - for the period ending 06/05/2023. |
| A132022 | 2022 | Fortescue Metals Group Ltd | Turee Creek | 2.3% | C282/2011 Turee Creek Partial Surrender Report for the period ending 14/07/2022. E 52/1788,E 52/1789,E 52/176 |
| A131285 | 2022 | Fortescue Metals Group Ltd | Angelo | <1% | E52/3294 Angelo Partial Surrender for the period ending 02/05/2022. |
| A125130 | 2020 | Fortescue Metals Group Ltd | Angelo | 36% | Combined Angelo Partial Surrender E52/2034, E52/2035 for the period 18 July 2011 to 24 August 2020 |
| A119584 | 2019 | Fortescue Metals Group Ltd | Turee Creek | <1% | C282/2011 Turee Creek Annual Report For the Period 1 February 2018 to 31 January 2019 |
| A119295 | 2019 | Robe River Mining Co. Pty. Ltd. | Spearhole | <1% | C165/2005 Spearhole Project Combined Annual Report Exploration Licences 52/2043, 52/2044, 52/3398, 52/3446 and |
| A119849 | 2019 | Fortescue Metals Group Ltd | Angelo | <1% | E52/3060 Angelo Project Final Surrender Report for the period 18 December 2014 to 1 March 2019 |
| A121215 | 2019 | Fmg Pilbara Pty Ltd | Angelo | 2.6% | E52/1779 Angelo Partial Surrender for the period 20 September 2005 to 30 August 2019 |
| A115849 | 2018 | Fortescue Metals Group Ltd | C115/2011 (Angelo) Annual Mineral Explor | 26% | C115/2011 (Angelo) Annual Mineral Exploration Report |
| A116083 | 2018 | Robe River Mining Co Pty Ltd | Spearhole | <1% | Spearhole Partial Surrender Report Exploration Licence 52/2043 (GDSR 6714) for the period 6 July 2008 to 2 Feb |
| A116982 | 2018 | Process Minerals International Pty Ltd | Turee Creek | <1% | Final Surrender E52/3177 Turee Creek Project for the period 31 March 2016 to 7 March 2018 |
| A118553 | 2018 | Marindi Metals Limited | Prairie Downs | <1% | Annual Report for C103/2007 Prairie Downs Project for the period 11 October 2017 to 10 December 2018, E52/0175 |
| A112128 | 2017 | Marindi Metals Pty Ltd | Newman | 1% | Newman Zinc Project Annual Reports for tenements E52/3103, E52/3283, and E52/3284 reporting period 01/12/2015 |
| A112290 | 2017 | Fortescue Metals Group Ltd | Turee Creek | 5.3% | C282/2011 Turee Creek Partial Surrender Report for the period 14 June 2005 to 1 February 2017, E 52/01763, E 5 |
| A114602 | 2017 | Fortescue Metals Group Ltd | Angelo | 36% | C115/2011 Angelo Partial Surrender Report For the Period 18 July 2011 to 17 July 2017 |
| A110830 | 2017 | Fortescue Metals Group Ltd | Tuperdunya | 50% | C27/2015 Tuperdunya Final Surrender Report 4 September 2014 to 30 November 2016 |
| A112289 | 2017 | Fortescue Metals Group Ltd | Tuperdunya | <1% | C27/2015 Tuperdunya Partial Surrender Report for the period 17 June 2015 to 12 January 2017, E52/03294, E52/03 |
| A113865 | 2017 | Process Minerals International Pty Ltd | Turee Creek | <1% | Annual Report E52/3177 "Turee Creek" for the period 31/3/2016 to 30/3/2017 |
| A108193 | 2016 | Fortescue Metals Group Ltd | Angelo | 1.1% | C115/2011 Angelo Final Surrender Report For the Period 6 October 2010 to 26 January 2015, E52/02470, E52/02621 |
| A108411 | 2016 | Fortescue Metals Group Ltd | Angelo | 2.9% | C115/2011 Angelo Final Surrender Report, 8 July 2011 to 19 February 2016 |
| A109320 | 2016 | Marindi Metals Operations Pty Ltd | B1 | 1% | Annual Report For the Period 18 June 2015 to 30 November 2015, B1 Project E52/03283, E52/03103, E52/03284 |
| A110659 | 2016 | Iridium Resources Pty Ltd | Prairie Downs | <1% | Final Surrender Report for E52/3125 Prairie Downs Project for the period 01/10/2015 - 25/10/2016 |
| A104905 | 2015 | Robe River Mining Co Pty Ltd | Spearhole | <1% | Spearhole Project, Annual Report for the period 01/01/2014 to 31/12/2014, E52/2043-2044; P52/1186, 1188 & 1212 |
| A105442 | 2015 | Fortescue Metals Group Ltd | Tunnel Creek | <1% | Tunnel Creek Project C180/2007 Annual Report for the period 1 October 2013 to 30 September 2014, E52/1759, E52 |
| A105445 | 2015 | Fortescue Metals Group Ltd; Iron Bull Ashburton Pty Ltd | Angelo | 8.2% | Angelo Project C115/2011 Annual Report for the period 1 December 2013 to 30 November 2014, E52/1984, E52/2034, |
| A106683 | 2015 | Fortescue Metals Group Ltd | Turee Creek | 13% | E52/1763 (Turee Creek) Annual Report for the period 14 June 2014 to 13 June 2015 |
| A106324 | 2015 | Atlas Iron Limited | Western Creek | <1% | Western Creek Project E52/2477-I Final Surrender Report To the Department of Mines and Petroleum For the Perio |
| A101254 | 2014 | Robe River Mining Co Pty Ltd | Spearhole | <1% | Annual Technical Report for the period 01/01/2013 to 31/12/2013 for the Spearhole Project Area E52/2044, E52/2 |
| A102084 | 2014 | Atlas Gold Ltd | Western Creek | <1% | Western Creek Project , E52/2272, Partial Surrender Report for the period 20 October 2009 to 22 April 2014. |
| A102803 | 2014 | Rio Tinto Iron Ore | Spearhole | <1% | Spearhole Partial Surrender Report for Exploration Licence 52/2043 for the period 06 July 2008 – 17 June 2014 |
| A103927 | 2014 | Atlas Iron Ltd | Western Creek - Tunnel Creek | 10% | Western Creek - Tunnel Creek Project (C273/2011) E52/2271 2272‐I 2476‐I 2477‐I Annual Technical Report to the |
| A103944 | 2014 | Atlas Iron Ltd | Western Creek - Tunnel Creek | <1% | Western Creek - Tunnel Creek E52/2272‐I Surrender Report to the Department of Mines and Petroleum for the Peri |
| A100568 | 2014 | Dynasty Metals Australia Ltd | Prairie Downs | <1% | Exploration Report Prairie Downs for the Period Ending 16 January 2014 [C175/2009 (E52/1927, E52/2024, E52/20 |
| A100768 | 2014 | Fortescue Metals Group Ltd | Angelo | 9.3% | Annual Report Angelo Project (C115/2011) for the period 1/12/2012 to 30/11/2013. [E52/2470, E52/2621, E52/198 |
| A102850 | 2014 | Atlas Iron Ltd | Western Creek - Tunnel Creek | 24% | Western Creek Project E52/2271-I Final Surrender Report to the Department of Mines and Petroleum for the Perio |
| A103033 | 2014 | Fortescue Metals Group Ltd | Indabiddy Creek - Turee Creek | 13% | Indabiddy Creek - Turee Creek Project, Annual Report for the period 14/06/2013 to 13/06/2014, E52/1763. |
| A97206 | 2013 | Dynasty Metals Australia Ltd | Prairie Downs | <1% | Prairie Downs Project, Annual Report for the period 1st February 2012 to 31st January 2013, E52/1927, 1938, 19 |
| A98898 | 2013 | Avocet Resources Ltd | Bundabunda Pool | 13% | Final surrender report for the period 26 June 2008 to 25 June 2013, Bundabunda Pool Project, E52/2032 |
| A99655 | 2013 | Atlas Iron Ltd | Western Creek - Tunnel Creek | 10% | Western Creek - Tunnel Creek Project E52/2271 2272-I 2476-I 2477-I Annual Technical Report for the period endi |
| A100303 | 2013 | Avocet Resources Ltd | Ashburton | 2.2% | Ashburton Joint Venture C13/2009 Combined report for period 19 September 2012 to 18 September 2013 E52/1879, 1 |
| A100378 | 2013 | Fortescue Metals Group Ltd | Tunnel Creek | <1% | Tunnel Creek C180/2007 Annual Report for the period 1 October 2012 to 30 September 2013, E52/2414, E52/2415, E |
| A96944 | 2013 | Robe River Mining Co Pty Ltd | Spearhole | <1% | Spearhole Project, Annual Report for the period 1st January 2012 to 31st December 2012, E52/2043-2044; P52/118 |
| A99229 | 2013 | Fortescue Metals Group Ltd | Indabiddy Creek - Turee Creek | 13% | Annual Mineral Exploration Report: E52/1763 for the period 14 June 2012 to 13 June 2013 |
| A92613 | 2012 | Fortescue Metals Group Ltd | Angelo | 14% | Annual report for the period 01th December 2010 – 30th November 2011 E52/2034 /2035 /2470 / 2594 / 2621, Angel |
| A92614 | 2012 | Fortescue Metals Group Ltd | Tunnel Creek | 1.1% | Tunnel Creek Project, Annual Report for the period 1st October 2010 to 30th September 2011, E52/1759-1760, 177 |
| A93312 | 2012 | Dynasty Metals Australia Ltd | Prairie Downs | <1% | Combined Group Report C175/2009 Prairie Downs for the Period Ending 31 January 2012; E52/1927, 1938, 1949, 20 |
| A94806 | 2012 | Fortescue Metals Group Ltd | Indabiddy Creek | 13% | Annual report for the period 14th June 2011 to 13th June 2012, Indabiddy Creek Project, E52/1763 |
| A95846 | 2012 | Avocet Resources Ltd | Ashburton | 2.2% | Ashburton Joint Venture C13/2009 Combined report for period 19 September 2011 to 18 September 2012, E52/1879, |
| A96010 | 2012 | Fortescue Metals Group Ltd | Tunnel Creek | 1.1% | Tunnel Creek Project, Annual Report for the period 01/10/2011 to 30/09/2012, E52/1759-1760, 1779, 2414-2416, 2 |
| A96409 | 2012 | Fortescue Metals Group Ltd | Angelo | 9.5% | Angelo C115/2011 Annual report for the period 1st of December 2011 to 30th of November 2012 E52/2034, E52/2035 |
| A92947 | 2012 | Rio Tinto Iron Ore | Spearhole | <1% | Annual Technical Report for Spearhole Project Area E52/2044, E52/2043, P52/1186, P52/1188, P52/1212, C165/2005 |
| A95489 | 2012 | Atlas Iron Ltd | Western Creek - Tunnel Creek | 10% | WESTERN CREEK / TUNNEL CREEK PROJECT Annual Technical Report to the Department of Mines and Petroleum for the |
| A88911 | 2011 | Giralia Resources Nl | Harrington Bore North | <1% | Harrington Bore North E52/2272 Annual Technical Report to DMP Period Ending 19 October 2010 |
| A90540 | 2011 | Atlas Iron Ltd | Western Creek | <1% | Western Creek Project E52/2477 Annual Technical Report to DMP Period Ending 20 May 2011 |
| A91908 | 2011 | Atlas Iron Ltd | Western Creek - Tunnel Creek | <1% | Western Creek Project - Tunnel Creek E52/2272, E52/2476 & E52/2477 Annual Technical Report to the Department o |
| A89086 | 2011 | Dynasty Metals Australia Ltd | Prairie | <1% | Annual Report E52/2359, Prairie Downs for the period ending 24/11/2010. |
| A92103 | 2011 | U308 Ltd | Ashburton | 2.5% | Ashburton Joint Venture Combined report for period 19 September 2010 to 18 September 2011, C13/2009, |
| A89415 | 2011 | Rio Tinto Iron Ore | Spearhole | <1% | Exploration Licences E52/2044 and E52/2043, and Prospecting Licences P52/1186, P52/1187, P52/1188, P52/1212. C |
| A90531 | 2011 | Dynasty Metals Australia Ltd | Prairie Downs | <1% | Annual Report for the Period Ending 31 January 2011 Prairie Downs, E52/1927, E52/1938, E52/1949, E52/2024, E52 |
| A91007 | 2011 | Aldershot Resources Ltd | Turee Creek | 13% | Annual Report for the period 14 June 2010 to 13 June 2011, Turee Creek, E52/1763 |
| A87155 | 2010 | Dynasty Metals Australia Ltd | Prairie Downs | <1% | Annual Report Prairie Downs Project for the Period Ending 16/01/2010, E52/1927, E52/1938, E52/1949, E52/2024, |
| A88267 | 2010 | Thundelarra Exploration | Paradise | 15% | Final Report, Paradise E52/1909, for the period 4 August 2006 to 1 July 2010, Peak Hill Mineral Field, Western |
| A88669 | 2010 | U308 Ltd | Ashburton | 2.5% | Ashburton Joint Venture C13/2009, Combined report for period 19 September 2009 to 18 September 2010 |
| A88767 | 2010 | Fortescue Metals Group Ltd | Tunnel Creek | 1.3% | Tunnel Creek Combined Reporting Group C180/2007 Annual Report for the period 1 Oct 2009 to 30 Sep 2010 |
| A85969 | 2010 | Rio Tinto Iron Ore | Spearhole | <1% | Spearhole Project Area Combined Annual Technical Report Exploration Licence E52/2043, E52/2044, P52/1186, P52/ |
| A81204 | 2009 | Rio Tinto Iron Ore | SPEARHOLE | <1% | Spearhole Project E52/2044, E52/2043, P52/1184, P52/1185, P52/1186, P52/1187, P52/1188, P47/1320, P47/1321. An |
| A82952 | 2009 | Cameco Australia Pty Ltd | TUREE CREEK | 13% | E 52/1763 TUREE CREEK PROJECT WA, ANNUAL REPORT 14 JUNE 2008 to 13 JUNE 2009 |
| A85044 | 2009 | Thundelarra Exploration Ltd | Kunderong | 2.9% | Combined Annual Report, Kunderong Project E52/1909 & E52/1940, for the period 1 October 2008 to 30 September 2 |
| A85248 | 2009 | Fortescue Metals Group Ltd | Tunnel Creek / Intrepid Uranium | 1.5% | Tunnel Creek Combined Reporting Group C180/2007 Annual Report for the period 1 Oct 2008 to 30 Sep 2009 |
| A85268 | 2009 | U308 Ltd | Ashburton Joint Venture | 2.5% | Combined report for period to 18 September 2009 E52/1879, E52/1880, E52/1893, E52/1914, E52/1915, E52/1916, E5 |
| A76919 | 2008 | Thundelarra Exploration Ltd | Paradise | 15% | ANNUAL REPORT PARADISE E52/1909 FOR THE PERIOD 4 AUGUST 2006 TO 3 AUGUST 2007 PEAK HILL MINERAL FIELD WA |
| A77446 | 2008 | Robe River Mining Co Pty Ltd | Spearhole | <1% | Spearhole Project Annual Report for E52/1716, E52/1717 and E52/1718, 1 January 2007 to 31 December 2007. (Newm |
| A79098 | 2008 | Aldershot Resources Ltd | Turee Creek | 13% | Annual Report for the period 14 June 2007 to 13 June 2008, Turee Creek, E52/1763 |
| A79811 | 2008 | Thundelarra Exploration Ltd | PARADISE | 15% | ANNUAL REPORT PARADISE E52/1909 FOR THE PERIOD 4 AUGUST 2007 to 3 AUGUST 2008 PEAK HILL MINERAL FIELD WESTERN |
| A80407 | 2008 | Fortescue Metals Group Ltd | Tunnel Creek / Intrepid Uranium | 1.7% | TUNNEL CREEK COMBINED REPORTING GROUP ANNUAL REPORT (Intrepid Uranium Project), for the period 1 Oct 2007 to 3 |
| A74427 | 2007 | Robe River Mining Co Pty Ltd | Spearhole | <1% | Spearhole Project Annual Report for E52/1716, E52/1717 AND E52/1718, 1 January 2006 to 31 December 2006. C16 |
| A75439 | 2007 | Poondano Exploration Pty Ltd | Turee Creek | 3.1% | Exploration report for the year ended 20th March 2007 Turee Creek North Licence E52/1759-1 |
| A75700 | 2007 | Aldershot Resources Ltd | Turee Creek | 13% | Annual Report for the period 14 June 2006 to 13 June 2007, Turee Creek, E52/1763. |
| A76826 | 2007 | Fortescue Metals Group Ltd | Tunnel Creek | 1.7% | Annual report for the period 1 October 2006 to 30 September 2007, Tunnel Creek Project, E52/1779, E52/1759 and |
| A71879 | 2006 | Robe River Mining Co Pty Ltd | Spearhole | <1% | Spearhole Project, Annual Report for E52/1716,E52/1717 & E52/1718, 28 October 2004 to 27 October 2005, (Combin |
| A73863 | 2006 | Poondano Exploration Pty Ltd | Resoloution Well | 7.3% | Surrender Report for the Year Ending 25 August 2006, Resolution Well Project E52/1805 (Newman) |
| A72579 | 2006 | Poondano Exploration Pty Ltd | Turee Creek North | 3.1% | Exploration Report for the Year Ending 20 March 2006, Turee Creek North Lease E52/1759, (Annual Report, Newman |
| A73068 | 2006 | Aldershot Resources Ltd | Turee Creek | 13% | Annual Report on E52/1763 Turee Creek, Covering the Period 14 June 2005 to 13 June 2006, (Newman). |
| A73680 | 2006 | Fortescue Metals Group Ltd | Prairie Heights | 2.6% | E52/1779 Prairie Heights, Annual Report for the Period 20 September 2005 to 19 September, (Newman). |
| A73862 | 2006 | Poondano Exploration Pty Ltd | Resoloution Well | 13% | Surrender Report for the Year Ending 25 August 2006, Resolution Well Project E52/1762, (Newman) |
| A58308 | 1999 | Hamersley Iron Pty Ltd | Indabiddy | 4.2% | Surrender Report E52/1113 covering period 28/08/1997 to 23/03/1999 ( Indabiddy Project). |
| A55965 | 1998 | Acclaim Uranium Nl | Turee Creek | 4.2% | Turee Creek Annual Report on E 52/1240 for the Period to 27th July 1998. |
| A56216 | 1998 | Hamersley Iron Pty Ltd | Indabiddy iron | 4.2% | Exploration Licence E52/1113 West Pilbara Mineral Field Western Australia Annual Report for the Period Ending |
| A52781 | 1997 | Robe River Mining Co Pty Ltd | Tunnel Creek | 6.7% | Tunnel Creek Project, Annual & Surrender Report for the period 29/07/1996 to 6th October 1997, E52/1066. |
| A43744 | 1995 | Kkr Resources Nl | Angelo River | 18% | Angelo River Project, Final Report E52/818, E52/819, February 199s. |
| A41543 | 1994 | Mr Richmond Wr | Noranda- Turee Creek | 21% | Noranda- Turee Creek Project, Annual Report for the period 16th December 1992 to 15th December 1993, E52/711. |
| A36613 | 1991 | Plutonic Operations Ltd | Turee Creek | 14% | Final Surrender Report : Evaluation of the Turee Creek Uranium Prospect, WA. M52/18 |
| A16454 | 1985 | Hamersley Exp Pty Ltd | Turee Creek | <1% | TR70/4325 TR70/4509 to TR70/4514 1985 Turee Creek |
| A11815 | 1983 | Uranerz Australia Pty Ltd | Turee Creek | 19% | Turee Creek Project, Final Surrender Report for the period 01/09/1982 to 20/12/1982, E52/25;TR70/7417H. |
| A11977 | 1983 | Noranda Australia Ltd | Prairie Downs | 6.8% | Prairie Downs Project, Final Surrender Report, January 1983, TR70/8078-8081H. |
| A11778 | 1983 | Uranerz Australia Pty Ltd | Turee Creek | 19% | Turee Creek Project, Final Surrender Report for the period 7th December 1981 to 6th December 1982, TR70/7324H. |
| A12237 | 1983 | Noranda Australia Ltd | Turee Creek | 1.8% | Turee Creek Project, Annual (& Final) Report for the period ending 31/12/1982, TR70/7318H & MC52/2230-2232, 22 |
| A12594 | 1983 | Otter Exploration Nl | No 6 Well | 42% | No 6 Well Project, Final Surrender Report for the period ending 23/03/1983, TR70/7494H. |
| A10527 | 1982 | Uranerz Australia Pty Ltd | Turee Creek | 19% | Turee Creek Project, Annual Report for the period 7th December 1980 to 6th December 1981, TR70/7324H. |
| A11312 | 1982 | Uranerz Australia Pty Ltd | Turee Creek | 19% | Turee Creek Project,Annual Report for the period 15th February 1982 to 30th June 1982, TR70/7417H. |
| A11313 | 1982 | Uranerz Australia Pty Ltd | Turee Creek | 19% | Turee Creek Project, Final Surrender Report for the period 15th February 1982 to 30th June 1982, TR70/7417H. |
| A9754 | 1981 | Uranerz Australia Pty Ltd | Turee Creek | 19% | Turee Creek Project, Annual Report for the period 15th February 1980 to 14th February 1981, TR70/7417H. |
| A10609 | 1981 | Noranda Australia Ltd | Prairie Downs | 6.8% | Prairie Downs Project, Annual Report for the period 30th January 1981 to 30th January 1982, TR0/8078-8081H. |
| A9509 | 1981 | Noranda Australia Ltd | Turee Creek | 1.8% | Turee Creek Project, Annual Report for the period ending 22nd November 1980, TR70/7318, MC52/2230-2231, 2235-2 |
| A9916 | 1981 | Otter Exploration Nl | Ashburton | 42% | Ashburton Uranium Project, Annual Report for the period 18/04/1980 to 17/04/1981, TR70/7494H. |
| A10583 | 1981 | Noranda Australia Ltd | Turee Creek | 1.8% | Turee Creek Project, 1981 Annual Report, October 1981, TR70/7318H, & MC52/2230-2232, 2235-2237, 2261-2266 & 22 |
| A9586 | 1980 | Uranerz Australia Pty Ltd | Turee Creek | 19% | Turee Creek Project, Annual Report for the period 7th December 1979 to 6th December 1980,TR70/7324H. |
| A7795 | 1977 | Cra Exploration Pty Ltd | Turee Creek | 8.4% | Turee Creek Project, Non-statutory Report: Exploration Report, November 1977, MC52/2230-2232, 2235-2237, 2261- |
| A5565 | 1975 | Cra Exploration Pty Ltd | Jamie Bore | 19% | Final report [non-statutory] on Temporary Reserve 5797H [ TR70/5797 ], Jamie Bore, January 1975 |
| A5566 | 1975 | Cra Exploration Pty Ltd | Prairie Downs | 22% | Final report [non-statutory] on TR70/5802 - Prarie Downs, January 1975 |
| A3896 | 1973 | Mt Newman Mining Co Pty Ltd | Angelo River | 23% | Angelo River Project, Non-statutory Report: Geological Exploration Report, August 1973, TR70/5598H. |
| A5273 | 1973 | Noranda Australia Ltd | Turee Creek | 1.8% | Report [non-statutory] on exploration on the Turee Creek Prospect, October 1973, MC52/2231 ... 52/2268 |
| A8525 | 1973 | Mccamey Iron Associates | Mount Newman | 14% | Mount Newman Project, Non-statutory Report: Reconnaissance Report, May 1973, TR70/5204-5205, 5208-5210 & 5248. |
| A1379 | 1970 | Pacminex Pty Ltd | Hamersley | 1.5% | Temporary Reserves for iron ore West Pilbara and Peak Hill Goldfields. Report for the quarter ended 30th June, |
| A87826 | 1753 | Cameco Australia Pty Ltd | Turee Creek | 13% | E 52/1763 TUREE CREEK PROJECT WESTERN AUSTRALIA ANNUAL REPORT |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 3 years · 26 May 2029
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 52/4044 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 52/4044? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.