E 52/4547
Register summary
- Holder
- Bga Exploration Pty Ltd
- Local government
- Shire of Meekatharra
- Application received
- 18 Dec 2025
- Commenced
- 3 June 2026
- Expiry
- 2 June 2031
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A153861 | 2026 | Albright Metals Ltd | West Bryah | 84% | Final Surrender Report for E 52/3349 (C72/2020) West Bryah for the period ending 17/12/2025. |
| A154556 | 2026 | Obsidian Mining Corporation Pty Ltd | Erivilla | <1% | Final Report for Erivilla E52/4251 for the Period 30/3/2023 to 25/5/2026 |
| A149850 | 2025 | Newcam Minerals Pty Ltd | Milgun | 20% | Surrender Report Milgun - Combined Group C188/2022 for the period ending 30/06/2025. E 52/4057,E 52/4058,E 52/ |
| A149459 | 2025 | Obsidian Mining Corporation Pty Ltd | Erivilla | <1% | Annual Report for E52/4251 Erivilla Project for the Period 26/5/2024 to 25/5/2025 |
| A142888 | 2024 | Bryah Resources Limited | West Bryah | 84% | Partial Surrender Report West Bryah E52/3349 for the period 18 December 2015 to 17 December 2021 |
185 more reports
| A143362 | 2024 | Cundeelee Pty Ltd | Four Corners Well Project | 12% | E52/4237 Four Corners Well Project Mineral Exploration Report for the period ending 03/04/2024 |
| A143708 | 2024 | Cundeelee Pty Ltd | Four Corners Well | 12% | E52/4237 Four Corners Well Project Final Surrender Report for the period 4 April 2023 to 10 June 2024 |
| A143735 | 2024 | Cundeelee Pty Ltd | Four Corners Well | <1% | E52/4253 Four Corners Well Project Final Surrender Report 6 October 2023 to 10 June 2024 |
| A144461 | 2024 | Rbh Mining Pty Ltd | Milgun | 20% | Annual Report for C188/2022 Milgun Project for the period 4 July 2023 to 3 July 2024 |
| A144881 | 2024 | Bryah Resources Limited | West Bryah | 13% | Final Surrender Report for E 52/3865 West Bryah for the period ending 08/08/2024. |
| A145371 | 2024 | Castile Resources Ltd | Milgun | <1% | Final Mineral Exploration Report for E52/4235 Milgun Project for the period ending 23/10/2024 |
| A143639 | 2024 | Obsidian Mining Corporation Pty Ltd | Erivilla | <1% | Erivilla Project Annual Report for E52/4251 for the Period 26/5/2023 to 25/5/2024 |
| A144378 | 2024 | Redcastle Resources Limited | Milgun | <1% | Mineral Exploration Report for E52/4235 Milgun Project for the period ending 26/03/2024 |
| A134286 | 2023 | Westgold Resources Limited | Vacation Bore | <1% | Surrender Report E52/3596 Vacation Bore Project for the period ending 22/01/2023. |
| A136609 | 2023 | Rbh Mining Pty Ltd | Milgun | 20% | Annual Report for C188/2022 Milgun Project for the period ending 03/07/2023 |
| A129582 | 2022 | Auris Minerals Limited | Horseshoe Well | <1% | Annual report for the Horseshoe Well project, E52/3166, for the period 18 December 2020 to 17 December 2021 |
| A129759 | 2022 | Auris Minerals Limited | Milgun | <1% | Annual report for the Milgun project, E52/3757, for the period 7 January 2021 to 6 January 2022 |
| A130516 | 2022 | Auris Minerals Limited | Horseshoe Well | <1% | Partial Surrender Report for the Horseshoe Well Project, E52/3291, for the period 2 March 2016 to 1 March 2022 |
| A130536 | 2022 | Auris Exploration Pty Ltd | Horseshoe Well | <1% | Annual report for the Horseshoe Well project, E52/3291, for the period 2 March 2021 to 1 March 2022 |
| A127088 | 2021 | Auris Minerals Limited | Horseshoe Well | <1% | Annual Report for the Milgun (Horseshoe West) Project, E52/3291 for the period 2 March 2020 to 1 March 2021 |
| A126516 | 2021 | Auris Minerals Limited | Horseshoe Well | <1% | Annual report for the Horseshoe Well Project, E52/3166, for the period 18 December 2019 to 17 December 2020 |
| A126604 | 2021 | Auris Minerals Limited | Milgun | <1% | Annual Report for the Milgun Project, E52/3757, for the period 7 January 2020 to 6 January 2021 |
| A127779 | 2021 | Bryah Resources Limited | West Bryah | <1% | Partial Surrender Report E52/3237 West Bryah Project for the period 31 March 2015 to 29 March 2021 |
| A122538 | 2020 | Auris Minerals Limited | Milgun | <1% | Annual Report for the Milgun Project E52/3166 for the period 18 December 2018 to 17 December 2019 |
| A122829 | 2020 | Auris Minerals Limited | Forrest | <1% | Annual report for the Forrest Project, C16/2008 (E52/1659, E52/1671 and P52/1494–1496), for the period 1 Janua |
| A123473 | 2020 | Auris Minerals Limited | Milgun (Horseshoe Well) | <1% | Annual report for the Milgun (Horseshoe West) project, E52/3291, for the period 2 March 2019 to 1 March 2020 |
| A123818 | 2020 | Westgold Resources Limited | Fortnum | <1% | Combined Annual Mineral Exploration Report, Fortnum C151/2015 for the period ending 2/3/2020 |
| A124044 | 2020 | Bryah Resources Limited | West Bryah | 33% | West Bryah Project C72/2020 Annual Report for the period ending 31/03/2020 |
| A123066 | 2020 | Austsino Resources Group Limited | Peak Hill | <1% | Annual Report for the Peak Hill Iron Project C230/2007 for the period ending 31/12/2019, E 52/01557, E 52/0186 |
| A119297 | 2019 | Auris Exploration Pty Ltd | Forrest | <1% | Annual Report for the Forrest Project C16/2008 (E52/1659, E52/1671 and P52/1494–1496) for the period 1 January |
| A119853 | 2019 | Auris Exploration Pty Ltd | Milgun - Horseshoe Well | <1% | Annual Report for the Milgun (Horseshoe West) Project E52/3291 for the period 2 March 2018 to 1 March 2019 |
| A120045 | 2019 | Westgold Resources Limited | Fortnum | <1% | Combined Annual Mineral Exploration Report, Fortnum C151/2015 For the Period 3 March 2018 to 2 March 2019 |
| A120357 | 2019 | Bryah Resources Limited | Bryah Basin | 24% | Bryah Basin C205/2017 Annual Report for the period 1 April 2018 to 31 March 2019, E52/03236, E52/03237, E52/03 |
| A120752 | 2019 | Westgold Resources Limited | Fortnum | <1% | Partial Surrender Report E52/3328 Fortnum Gold Project for the period 15 October 2015 to 15 May 2019 |
| A118841 | 2019 | Bci Minerals Limited | Yarlarweelor North | <1% | Final Surrender Report For E52/3002 Yarlarweelor North Project for the period 9 December 2013 to 7 December 20 |
| A119033 | 2019 | Auris Exploration Pty Ltd | Horseshoe Well - Milgun | <1% | Annual Report for the Horseshoe Well (Milgun) Project, E52/3166, for the period 18 December 2017 to 17 Decembe |
| A119233 | 2019 | Austsino Resources Group Limited | Peak Hill | <1% | Annual Report for the Peak Hill Iron Project C230/2007 For the Period 1 January 2018 to 31 December 2018, E52/ |
| A120758 | 2019 | Westgold Resources Limited | Fortnum | <1% | Partial Surrender Report E52/3596 Fortnum Gold Project for the period 13 September 2018 to 12 September 2019 |
| A120837 | 2019 | Westgold Resources Limited | Fortnum | <1% | Partial Surrender Report E52/3328 Fortnum Gold Project for the period 15/10/2015 to 15/05/2019 |
| A115961 | 2018 | Desert Resources Ltd | Peak Hill | <1% | Peak Hill Iron Project C230/2007, E52/01557, E52/01860, E52/02368, E52/02993 Annual Report for the period 1 Ja |
| A116440 | 2018 | Auris Exploration Pty Ltd | Forrest | <1% | Combined Annual Report for the Forrest Project, C16/2008 (E52/1659, E52/1671 and P52/1494–1496) for the period |
| A116494 | 2018 | Auris Exploration Pty Ltd | Milgun - Horseshoe West | <1% | Annual Report for the Milgun (Horseshoe West) Project E52/3291 for the period 2 March 2017 to 1 March 2018 |
| A116530 | 2018 | Auris Exploration Pty Ltd | Wodger | <1% | Royalties for Regions Exploration Incentive Scheme, Co-funded Government–Industry Drilling Program, Final Repo |
| A117043 | 2018 | Bryah Resources Limited | Bryah Basin | 24% | Bryah Basin Combined Annual Report C205/2017 for the period 1 April 2017 to 31 March 2018, E52/03236, E52/0323 |
| A115873 | 2018 | Auris Exploration Pty Ltd | Milgun | <1% | Annual Report for the Milgun Project E52/3166 for the period 18 December 2016 to 17 December 2017 |
| A115931 | 2018 | Bci Minerals Limited | Yarlarweelor | <1% | Annual Report, E52/3002 Yarlarweelor North Project for the period 9 December 2016 to 8 December 2017 |
| A116805 | 2018 | Westgold Resources Limited | Fortnum | <1% | Combined Annual Mineral Exploration Report, Fortnum Project C151/2015 for the period 3 March 2017 to 2 March 2 |
| A110798 | 2017 | Bc Iron Limited | Yarlarweelor North | <1% | Annual Report, E52/3002 Yarlarweelor North For The Period 9 December 2015 To 8 December 2016 |
| A112131 | 2017 | Australian Vanadium Limited | Mount Labouchere | 84% | Annual Report for Mt Labouchere Project E52/03349 for the period 18/12/2015 to 17/12/2016 |
| A112135 | 2017 | Grosvenor Gold Pty Limited | Forrest | <1% | Forrest Project C16/2008 Annual Mineral Exploration Report for the period 1 January 2016 to 31 December 2016, |
| A112721 | 2017 | Auris Exploration Pty Ltd; Omni Projects Pty Ltd | Horseshoe Well | <1% | Horseshoe Well E52/3291 Annual Technical Report for the period 02/03/2016 to 01/03/2017 |
| A113908 | 2017 | Westgold Resources Limited | Labouchere | <1% | Combined Annual Mineral Exploration Report, Labouchere Project C45/2015 For the Period 1 March 2016 to 28 Febr |
| A113943 | 2017 | Pet Fc Pty Ltd | Peak Hill | <1% | Peak Hill E52/3237 Annual Report for the period 01/04/2016 - 31/03/2017 |
| A113969 | 2017 | Westgold Resources Limited | Fortnum | <1% | Combined Annual Mineral Exploration Report, Fortnum C151/2015 For the Period 3 March 2016 to 2 March 2017, E52 |
| A111981 | 2017 | Grosvenor Gold Pty Limited | Horseshoe Well | <1% | Horseshoe Well E52/3166 Annual Technical Report for the period For the Period 18 December 2015 to 17 December |
| A112773 | 2017 | Allkarri Holdings Pty Ltd | Fortnum | <1% | Final Surrender Report for Fortnum Project E52/02832 for the period 16/01/2013 to 16/01/2017 |
| A107831 | 2016 | Allkarri Holdings Pty Ltd | Curly Well | 84% | Final Surrender Report for Curly Well E 52/02796 for the period 9 October 2012 to 8 October 2015 |
| A107839 | 2016 | Bc Iron Limited | Yarlarweelor | <1% | Annual Report E52/3002 Yarlarweelor North Annual Report For The Period 9 December 2014 To 8 December 2015 |
| A107967 | 2016 | Grosvenor Gold Pty Ltd | Fortnum | <1% | COMBINED ANNUAL TECHNICAL REPORT C16/2008 FORTNUM TENEMENT NUMBERS E52/1659 and E52/1671 (for the period 01/01 |
| A108777 | 2016 | Padbury Mining Limited | Peak Hill | <1% | 2015 Combined Annual Mineral Exploration Report C230/2007, Peak Hill Project, Annual Report for the Period 1 J |
| A108997 | 2016 | Metals X Limited | Fortnum | <1% | Annual Mineral Exploration Report C151/2015 Fortnum Project for the period 03/03/2015 to 02/03/2016 |
| A110422 | 2016 | Omni Geox Pty Ltd | Labouchere East | <1% | Labouchere East E52/03328 Annual Report for the period 15 October 2015 to 16 October 2016 |
| A107912 | 2016 | Grosvenor Gold Pty Ltd | Horseshoe Well | <1% | Horseshoe Well Project E52/3166 Annual Technical Report for the period 18 December 2014 to 17 December 2015 |
| A108550 | 2016 | Allkarri Holdings Pty Ltd | Fortnum | <1% | Annual Report for Fortnum Project E52/02832 for the period 16 January 2015 to 15 January 2016 |
| A109210 | 2016 | Pet Fc Pty Ltd | Dandy Well | <1% | Annual Report for Dandy Well Project E52/03237 for the period 31/03/2015 to 30/03/2016 |
| A104621 | 2015 | Bc Iron Ltd | Yarlarweelor North | <1% | Annual Report, E52/3002 Yarlarweelor North Annual Report For The Period 9 December 2013 To 8 December 2014 |
| A104653 | 2015 | Talisman Mining Ltd | Shelby | <1% | Shelby Project Combined Annual Report C125/2010 (E52/2519, E52/2500, E52/2499, E52/2628, E52/2629, E52/2634) F |
| A104654 | 2015 | Talisman Mining Ltd | Milgun | 6.5% | Milgun Project Combined Annual Report C272/2011 (E52/2281, and E52/2708), Final Surrender Report for the perio |
| A104861 | 2015 | Padbury Mining Ltd | Peak Hill | <1% | Peak Hill Project, Annual Report for the period 01/01/2014 to 31/12/2014, E52/1557, 1860, 2368, 2436; P52/1329 |
| A104865 | 2015 | Grosvenor Gold Pty Ltd | Fortnum | <1% | Combined Annual Technical Report (C16/2008) E52/1659 and E52/1671 for the period 1 January 2014 to 31 December |
| A104866 | 2015 | Grosvenor Gold Pty Ltd | Fortnum | 1% | Fortnum Project Combined 2014 Annual Technical Report C591/1994 for the period 1 January 2014 to 31 December 2 |
| A104940 | 2015 | Grosvenor Gold Pty Ltd | Fortnum | 3.3% | C591/1994 FINAL SURRENDER REPORT FOR PROSPECTING LICENCES FORTNUM PROJECT TENEMENT NUMBERS P52/1147, P52/1148, |
| A104998 | 2015 | Allkarri Holdings Pty Ltd | Peak Hill | <1% | Peak Hill E52/2832 Annual Report for the period 17/01/2014 to 16/01/2015 |
| A105097 | 2015 | Desert Resources Ltd | E52/1860 | <1% | E52/1860 Partial Surrender Report for the period 25/08/2005 – 11/12/2014 |
| A100913 | 2014 | Padbury Mining Ltd | Peak Hill | <1% | 2013 Annual Repor t C230/2007 For the per iod 01/01/2013 to 31/12/2013 Peak Hi l l Project Western Australia, |
| A101125 | 2014 | Allkarri Holdings Pty Ltd | Peak Hill | <1% | Peak Hill Project, Annual Report for the period 16/01/2013 to 15/01/2014, E52/2832. |
| A101494 | 2014 | Grosvenor Gold Pty Ltd | Fortnum | 1% | Combined Annual Technical Report C591/1994 Fortnum Project for the period 1 January 2013 to 31 December 2013, |
| A101495 | 2014 | Grosvenor Gold Pty Ltd | Fortnum | <1% | Fortnum Project Combined Annual Technical Report C16/2008 (E52/1659 and E52/1671) for the period 1 January 201 |
| A104053 | 2014 | Allkarri Holdings Pty Ltd | Peak Hill | 84% | Peak Hill Project, Annual Report for the period 09/10/2013 to 08/10/2014, E52/2796. |
| A101011 | 2014 | Padbury Mining Ltd | Peak Hill | <1% | Peak Hill Project, Final Surrender Report for the period 06/10/2008 to 05/10/2013, E52/2236. |
| A101315 | 2014 | Talisman Mining Ltd | Shelby | <1% | Shelby Project (C125/2010) Annual Exploration Report for the period 10 December 2012 to 9 December 2013, E52/2 |
| A101483 | 2014 | Talisman Mining Ltd | Shelby | <1% | Shelby Project Partial Relinquishment Report for E 52/2519 Report Period:01/04/2011 to 24/01/2014 |
| A101761 | 2014 | Talisman Mining Ltd | Milgun | 1.5% | Milgun Project Combined Annual Exploration Report C272/2011 (E52/2281, E52/2708, E52/2689, E52/2690 and E 52/2 |
| A102760 | 2014 | Cazaly Resources Ltd | Fortnum | <1% | Annual Report Fortnum Project E52/2861, For the Period 15th June 2013 to 14th June 2014 |
| A96788 | 2013 | Padbury Mining Ltd | Peak Hill | <1% | Peak Hill Project, Final Surrender Report for the period 04/07/2007 to 10/12/2012, E52/2118. [C230/2007] |
| A96981 | 2013 | Talisman Mining Ltd | Shelby | <1% | Annual Exploration Report for the period 10 December 2011 to 09 December 2012, Shelby Project E52/2519, E52/25 |
| A96988 | 2013 | Padbury Mining Ltd | Peak Hill | 17% | Peak Hill Project, Annual Report for the period 1st January 2012 to 31st December 2012, E52/1481, 1518, 1557, |
| A96997 | 2013 | Grosvenor Gold Pty Ltd | Fortnum | <1% | COMBINED ANNUAL TECHNICAL REPORT C16/2008 FORTNUM TENEMENT NUMBERS E52/1655, E52/1659 and E52/1671 PEAK HILL M |
| A96998 | 2013 | Grosvenor Gold Pty Ltd | Fortnum | 1% | ANNUAL TECHNICAL REPORT FOR COMBINED REPORT C591/1994 FORTNUM PROJECT TENEMENT NUMBERS M52/5, M52/6, M52/93, M |
| A97543 | 2013 | Talisman Mining Ltd | Milgun | 1.5% | Milgun Project Combined Annual Exploration Report C272/2011 for the period 21 January 2012 to 20 January 2013, |
| A98011 | 2013 | Grosvenor Gold Pty Ltd | Milgun | <1% | Milgun Project, Final Surrender Report for the period 23rd February 2004 to 22nd February 2013, E52/1655. [C1 |
| A98152 | 2013 | Montezuma Mining Company Ltd | Horseshoe Lights North | <1% | Horseshoe Lights North Project, Annual Report for the period 29th March 2012 to 28th March 2013, E52/2759. |
| A98617 | 2013 | Kupang Resources Ltd | Peak Hill | <1% | Annual Report E52/1751 Peak Hill for the period 12th July 2012 to 11th July 2013 |
| A98771 | 2013 | Resource And Investment Nl | Fortnum West | <1% | Fortnum West Project, Annual Report for the period 16th June 2012 to 15th June 2013, E52/2568. |
| A100233 | 2013 | Allkarri Holdings Pty Ltd | Peak Hill | 84% | Annual Report E52/2796 Peak Hill for the period 9 Oct 2012 - 8 October 2013 |
| A92956 | 2012 | Talisman Mining Ltd | Shelby | <1% | Shelby Project C125/2010 Annual Exploration Report for the period 10 December 2010 to 09 December 2011, E52/25 |
| A93081 | 2012 | Padbury Mining Ltd | Peak Hill - Telecom Hill | 17% | 2011 Annual Report C230/2007 Telecom Hill Project for the period 1 January 2010 – 31 December 2011 |
| A93218 | 2012 | Grosvenor Gold Pty Ltd | Fortnum NWN | <1% | Annual Report C16/2008 2010 Annual Report for the period 1st January 2011 - 31st December 2011, E52/1655, E52/ |
| A93219 | 2012 | Grosvenor Gold Pty Ltd | Fortnum | 1% | Annual Report C591/1994 2011 Annual Report for the period 1st January 2011 - 31st December 2011 |
| A93402 | 2012 | Talisman Mining Ltd | Milgun | 1.5% | Milgun Project, Annual Report for the period 21st January 2011 to 20th January 2012, E52/2281, 2690, 2708, 268 |
| A94526 | 2012 | Resource And Investment Nl | Fortnum West | <1% | Annual Report for Exploration Licence E52/2568 Fortnum West Project for the period 16 June 2011 to 15 June 201 |
| A95400 | 2012 | Kupang Resources Ltd | Peak Hill | <1% | Annual Report E52/1751 Peak Hill for the period 12th July 2011 to 11th July 2012 |
| A92978 | 2012 | United Orogen Ltd | Horseshoe West | <1% | HORSESHOE WEST PROJECT FINAL ANNUAL TECHNICAL REPORT FOR EXPLORATION ACTIVITY EXPLORATION LICENCE 52/2016 FOR |
| A94992 | 2012 | Padbury Mining Ltd | Peak Hill | 84% | Final surrender report E52/1861 Peak Hill |
| A89419 | 2011 | Talisman Mining Ltd | Shelby | <1% | Annual Exploration Report for the period 10 December 2009 to 09 December 2010 |
| A89606 | 2011 | Talisman Mining Ltd | Milgun | 9.8% | Milgun Project, Annual Exploration Report for the period 21 January 2010 to 20 January 2011, E52/2281 |
| A89769 | 2011 | United Orogen Ltd | Horseshoe West | <1% | Annual Technical Report for Horseshoe West Project E52/2016, Period Ending 18 February 2011 |
| A89774 | 2011 | Grosvenor Gold Pty Ltd | Fortnum | 1% | C591/1994 Fortnum Project Annual Report for the period 1 jan 2010 to 31st December |
| A89775 | 2011 | Grosvenor Gold Pty Ltd | Fortnum | <1% | Fortnum NWN Project C16/2008 E52/1655, 1659, 1671, Annual Report C16/2008, Annual report for the period 1st Ja |
| A91110 | 2011 | Resource And Investment Nl | Fortnum West | <1% | Annual Report for Exploration Licence E52/2568 Fortnum West Project, Report Period: 16 June 2010 to 15 June 20 |
| A89335 | 2011 | Padbury Mining Ltd | Peak Hill | 17% | Peak Hill Project Annual Report C230/2007 for the period 1 January 2010 - 31 December 2010 |
| A91782 | 2011 | Chameleon Mining Nl | Peak Hill | <1% | Annual Report E52/1751 Peak Hill for the period 12th July 2010 to 11th July 2011 |
| A85953 | 2010 | Aurium Resources Ltd | Peak Hill | 12% | ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007 EXPLORATION LICENCES E52/1481, E52/1518, .... on |
| A86131 | 2010 | Grosvenor Gold Pty Ltd | Fortnum | 1% | Fortnum Project 2009 Annual Report, C591/1994, P52/1147-1160, P52/1169-1172, M52/5-6, M52/93, M52/95-96, M52/9 |
| A86501 | 2010 | United Orogen Ltd | Horsehoe West | <1% | Annual Technical Report for Horseshoe West Project E52/2016, Period Ending 18 February 2009 |
| A86823 | 2010 | Talisman Mining Ltd | Milgun | 9.8% | Milgun E52/2281 Annual Exploration Report for the period 21 January 2009 to 20 January 2010 |
| A87659 | 2010 | Aurium Resources Ltd | Peak Hill | <1% | Annual Report for the tenement E52/2118 PEAK HILL for the period 4th July 2009 to 3rd July 2010 |
| A87891 | 2010 | Chameleon Mining Nl | Peak Hill | <1% | Peak Hill Project, Annual Report for the period 12th July 2009 to 11th July 2010, E52/1751. |
| A88486 | 2010 | Aurium Resources Ltd | PEAK HILL | <1% | ANNUAL REPORT, FOR TENEMENT E52/2236-I PEAK HILL, for the period 4th October 2009 to 5th October 2010 |
| A81263 | 2009 | Aurium Resources Ltd | Peak Hill | 13% | ANNUAL TECHNICAL REPORT on Combined Reporting Area C230/2007, Consisting of EXPLORATION LICENCES E52/1481, E52 |
| A84325 | 2009 | Aurium Resources Ltd | PEAK HILL | <1% | ANNUAL REPORT FOR TENEMENT E52/2118, PEAK HILL for the period 18th August 2008 to 18th August 2009 |
| A84398 | 2009 | Chameleon Mining Nl | Fortnum 51 | <1% | E52/1751 “Fortnum 51” Mineral Exploration Report 26/07/2008 – 25/07/2009 |
| A85077 | 2009 | Aurium Resources Ltd | Fortnum East | <1% | Annual report for tenement E52/2236 Fortnum East for the period 6 October 2008 to 5 October 2009 |
| A81647 | 2009 | Chameleon Mining Nl | Fortnum 51 | <1% | E52/1751 “Fortnum 51” Partial Relinquishment Report 26/07/2007 – 25/07/2008 |
| A81730 | 2009 | Grosvenor Gold Pty Ltd | Fortnum NWN | <1% | Fortnum NWN Project C16/2008 E52/1655, E52/1659, E52/1671 Annual Report, Report Period: 1 January 2008 – 31 De |
| A81731 | 2009 | Grosvenor Gold Pty Ltd | Fortnum | <1% | Fortnum Project 2008 Annual Report, Period: 1 January 2008 – 31 December 2008, C591/1994, E52/2059 (formerly E |
| A81808 | 2009 | United Orogen Ltd | Horseshoe West | <1% | Annual Report for E52/2016 Horseshoe West, 19 February 2008 to 18 February 2009 |
| A82099 | 2009 | Aurium Resources Ltd | Peak Hill | <1% | FINAL SURRENDER REPORT FOR E52/1589 PEAK HILL, 30th January 2008 to 29th January 2009 |
| A77369 | 2008 | Eagle Gold Mines Pty Ltd | Fortnum | <1% | Fortnum Project C591/1994 2007 Annual Report 1 January 2007 - 31 December 2007 E52/1655, E52/1659, E52/1671, E |
| A77493 | 2008 | Greater Pacific Gold Ltd | Peak Hill | 84% | Annual Technical Report on Exploration Licence E52/1861 on the PEAK HILL SHEET SG 50-8 in the 1:250,000 Series |
| A77496 | 2008 | Greater Pacific Gold Ltd | Peak Hill | <1% | Annual Technical Report on Exploration Licence E52/1857 on the PEAK HILL SHEET SG 50-8 in the 1:250,000 Series |
| A77716 | 2008 | Haven Resources Ltd | Peak Hill | <1% | Annual Reportfor Haven Resources Ltd, E52/1589 Peak Hill For the period 30th January 2007 to 29th January 200 |
| A78010 | 2008 | Uranium Oil & Gas Ltd | Horseshoe West | <1% | Annual Report for E52/2016 19 February 2007 to 18 February 2008 |
| A78585 | 2008 | Haven Resources Ltd | Peak Hill | <1% | PARTIAL SURRENDER REPORT E52/1589 Peak Hill Mineral Field April 2008 |
| A74648 | 2007 | Gleneagle Gold Ltd | Fortnum | <1% | Fortnum Project 2006 Annual Report (C591/1994) Report Period: 1 January 2006 - 31 December 2006 (Robinson Rang |
| A74652 | 2007 | Blazecape Pty Ltd | Peak Hill | <1% | Annual Report for Blazecape Pty Ltd E52/1589 Peak Hill for the period 30th January 2006 to 29th January 2007 |
| A75284 | 2007 | Blazecape Pty Ltd | Peak Hill | <1% | Partial Surrender Report For Blazecape Pty Ltd E52/1589 Peak Hill |
| A76185 | 2007 | Montezuma Mining Company Ltd | Vacation Bore | <1% | Annual Report on E52/1856, Vacation Bore Prospect, for the Period 1 July 2006 to 30 June 2007. |
| A71950 | 2006 | Gleneagle Gold Ltd | Fortnum | <1% | Fortnum Project 2005 Annual Report, 1 January 2005 to 31 December 2005, Combined Reporting No. C591/1994, (Rob |
| A72247 | 2006 | Blazecape Pty Ltd | Peak Hill | <1% | Annual Report for Blazecape Pty Ltd, E52/1589 Peak Hill, For the Period 30 January 2005 to 29 January 2006, ( |
| A70088 | 2005 | Lithos Exploration Services Pty Ltd | Mount Labouchere | 9.8% | Mt Labouchere Project, E52/1635, (Annual ) Report for the period 18/02/04 - 17/02/05 (Robinson Range) |
| A70175 | 2005 | Blazecape Pty Ltd | Peak Hill | <1% | Annual report for Blazecape Pty Ltd, E52/1589, Peak Hill, for the period 30/01/04 - 29/01/05 (Meekatharra) |
| A70237 | 2005 | Gleneagle Gold Ltd | Fortnum | <1% | Fortnum Project 2004 Annual Report Reporting Period: 1st Jan uary 2004 to 31st December 2004 Ref.No.: C591/199 |
| A68408 | 2004 | Gleneagle Gold Ltd | Fortnum | <1% | Fortnum Project 2003 Annual Report Reporting Period: 1st Jan uary 2003 to 31st December 2003 Ref.No.: C591/199 |
| A66300 | 2003 | Perilya Ltd | Fortnum | 1.1% | Annual Report for Fortnum Project for the period 01/01/2002 - 31/12/2002 Project No:C591/1994, Tenement Group: |
| A65650 | 2002 | Perilya Ltd | Fortnum | <1% | A Final Surrender Report For E52/1473 To E52/1475, P52/556 To P52/563, M52/562 To M52/565. Outer Area Dandy We |
| A64278 | 2002 | Perilya Ltd | Fortnum | <1% | Annual Report for Fortnum Project for the period 01/01/2001 - 31/12/2001 project number C591/1994 (formerly M3 |
| A64678 | 2002 | Perilya Ltd | Fortnum | <1% | A Final Surrender Report For E52/943 & E52/944 Western Els Fortnum Project C591/1994. |
| A62421 | 2001 | Perilya Mines Nl | Fortnum | <1% | Annual Report For Fortnum Project For The Period 01/01/2000 -31/12/2000 Project Number C591/1994 (formerly M36 |
| A59903 | 2000 | Perilya Mines Nl | Fortnum | <1% | Annual Report for Fortnum Project P52/556, P52/557, P52/558, P52/559, P52/560, P52/561, P52/562, P52/563, P52/ |
| A57742 | 1999 | Perilya Mines Nl | Fortnum | <1% | Annual report for the Fortnum project C591/1994. For period 1 January 1998 to 31 December 1998. |
| A58126 | 1999 | Perilya Mines Nl | Fortnum | <1% | A Partial Surrender Report For E 52/943 Western Els As Part Of the Fortnum Project, For the Period 6/2/1995 to |
| A53661 | 1998 | Perilya Mines Nl | Fortnum | 1.6% | Relinquishment Report for M52/460, 461, 462 for period 9th November 1993 to 18th December 1997 (Fortnum Projec |
| A53778 | 1998 | Plutonic Operations Ltd | Milgun | 54% | Project 578 Milgun Joint Venture Project, Activity Report E52/782 (Surrender Report) Period to 26/08/1997. |
| A54371 | 1998 | Perilya Mines Nl | Fortnum | <1% | Annual Report, Fortnum Project M3638/1 01/01/97 - 31/12/97 P52/556-563 (MLA52/561-562), P52/586-599 (MLA52/578 |
| A53667 | 1998 | Perilya Mines Nl | Fortnum | <1% | Partial Surrender Report for E52/943 for period 06/02/95-05/02/98 (Fortnum Project) |
| A56045 | 1998 | Mines & Resources Australia Pty Ltd | Wilthorpe | <1% | Wilthorpe project, Surrender report for the period 29 August 1995 to 27 August 1998, PE98/19, Tenements: E52/9 |
| A50287 | 1997 | Perilya Mines Nl | Fortnum | <1% | Annual report for the Fortum Project for period 1 January to 31 December 1996 P52/556 to P52/563 P52/586 to P5 |
| A51425 | 1997 | Bhp Minerals Pty Ltd | Milgun | 2.9% | Milgun Project, Annual Report for the period 6 February 1996 to 5 February 1997, E52/938-942, 1015-1016 &1028- |
| A52081 | 1997 | Bhp Minerals Pty Ltd | Milgun | 3.3% | Milgun Project, Surrender and Partial Surrender Report , February 1997, E52/938-942, 1015-1016 & 1028. |
| A52685 | 1997 | Mines & Resources Australia Pty Ltd | Wilthorpe | <1% | Wilthrope Project, Annual Report for the period 29th August 1996 to 28th August 1997, E52/992-994. |
| A46699 | 1996 | Plutonic Operations Ltd | Milgun | 54% | Milgun (JV) Project, Annual Report for period 05/10/1994 to 04/10/1995, E52/782. |
| A47432 | 1996 | Perilya Mines Nl | Fortnum | <1% | Annual report for the Fortum Project for period 1 January 1995 to 31 December 1995 P52/556 to P52/563 P52/586 |
| A47731 | 1996 | Bhp Minerals Pty Ltd | Milgun | 5.5% | Milgun Project, Annual Report for the period 6 February 1995 to 6 February 1996, E52/938-942. |
| A49081 | 1996 | Mines & Resources Australia Pty Ltd | Wilthorpe | <1% | Wilthrope Project, Annual Report for the period 29 August 1995 to 28 August 1996, E52/992, E52/993 & E52/994. |
| A43250 | 1995 | Plutonic Operations Ltd | Labouchere Well | 43% | Labouchere Well Project, Annual Report E52/ 784 for the period 1st December 1993 to 30th November 1994. |
| A45580 | 1995 | Troy Resources Nl | Fortnum East | 24% | Fortnum East Project. E52/865. Annual report. 5/8/94 - 4/8/95 |
| A43873 | 1995 | Perilya Mines Nl | Fortnum | <1% | Annual report for the Fortnum Project for period 1 January 1994 to 31 December 1994 P52/556 to P52/574 P52/578 |
| A40318 | 1994 | Dominion Mining Ltd | Mount Arapiles | <1% | Annual Report for the period 01/01/93-08/10/93 Mt Arapiles Project E52/700 |
| A40692 | 1994 | Perilya Mines Nl | Fortnum | 1.2% | Annual report for the period 28/02/93-01/03/94 Fortnum Project M52/93 M52/95-96 M52/98-99 52/125 M52/132-133 M |
| A41946 | 1994 | Afmeco Pty Ltd | Labouchere | 5.9% | Annual Report for the period 13/07/93-12/07/94, Labouchere Project, E52/763 |
| A42790 | 1994 | Troy Resources Nl | Labouchere | 54% | Labouchere Project, Annual Report for the period 5th October 1993 to 4th October 1994, E52/782. |
| A37723 | 1993 | Homestake Australia Ltd | Fortnum | <1% | HAL Report NO. FT/15/93 Fortum Annual report 1 January 1992 to 31st December 1992 |
| A37884 | 1993 | Homestake Australia Ltd | Labouchere | 3.6% | Annual Report for the period 01/01/92-31/12/92 Labouchere Project P52/586-599 M52/125 |
| A38267 | 1993 | Dominion Mining Ltd | Mount Arapiles | <1% | Annual Report for the period 09/10/92-31/12/92 Mt Arapiles Project E52/700 |
| A35439 | 1992 | Homestake Australia Ltd | Fortnum | <1% | Annual Report for the Period 01/01/91 - 31/12/91 M52/93,95,96,98,99,132-133; P52/556-562 |
| A34759 | 1991 | Homestake Australia Ltd | Labouchere | 3.8% | Annual report for the period 01/01/91-31/12/91 Labouchere Project M52/125-126 M52/172-173 |
| A34828 | 1991 | Homestake Australia Ltd | Fortnum | <1% | Annual report for the period 01/01/91-31/12/91 Outer Fortnum Project M52/93 M52/95-96 M52/98-99 M52/138-139 M5 |
| A32143 | 1990 | Homestake Australia Ltd | Labouchere | 3.8% | Labouchere JV; Annual Report 01/01/90 - 31/12/90 Tenements M52/125-126, M52/172-173 |
| A29948 | 1990 | Homestake Australia Ltd | Labouchere | 3.8% | Labouchere JV; Annaul Report For The Year Ending 31/12/89 MLs52/125,126,172,173 |
| A29979 | 1990 | Homestake Australia Ltd | Fortnum | <1% | Outer Fortnum Project Annual report 01/01/89-31/12/89 M52/92-99 M52/134-139 E52/108 |
| A32797 | 1990 | Homestake Australia Ltd | Fortnum | <1% | Annual Report 01/01/90 - 31/12/90 Outer Fortnum Project M52/92-99,134-139,187-188 |
| A26666 | 1989 | Homestake Australia Ltd | Labouchere | 7.3% | Labouchere JV; Annual Report For Year Ending 31/12/88; EL52/73; ML52/125,126 Report No. 1989/5 |
| A29185 | 1989 | Homestake Australia Ltd | Fortnum | <1% | Technical report Fortnum Project 01/01/87-31/12/88 E52/42 E52/108 M52/92-99 M52/132-139 |
| A10111 | 1980 | Occidental Minerals Corporation Of Australia | Coobina | 24% | Coobina Project, Annual Report : Beneficiation of a Chromite Ore, August 1980, MC52/2614, 2679, 3660 & 4102. |
| A7328 | 1977 | Cra Exploration Pty Ltd | Labouchere South | 2.2% | Labouchere South Project, Final Surrender Report, November 1977, TR70/6540H. |
| A7327 | 1977 | Cra Exploration Pty Ltd | Labouchere | 56% | Labouchere Project, Final Surrender Report, November 1977, TR70/6539H; MC52/2697-2700. |
| A571 | 1967 | Westfield Minerals Nl | Ashburton-Bangemall | <1% | Ashburton-Bangemall Project, Non-statutory Report:Report for 1966, (Vol 2) Exploration within the Bangemall Gr |
| A77495 | 1753 | Greater Pacific Gold Ltd | Peak Hill | <1% | Annual Technical Report on Exploration Licence E52/1860 on the PEAK HILL SHEET SG 50-8 in the 1:250,000 Series |
| A79316 | 1753 | Aurium Resources Ltd | Peak Hill | <1% | ANNUAL REPORT FOR TENEMENT E52/2118 PEAK HILL for the period 4th July 2007 to 3rd July 2008 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 5 years · 2 June 2031
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 52/4547 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 52/4547? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.