L 16/58
L 16/58 is a live miscellaneous licence in the Shire of Coolgardie, Western Australia, held by Lamerton Pty Ltd and Geoda Pty Ltd. Granted on 13 Dec 1999 for 21 years (renewed), it expires on 12 Dec 2041. The ground is covered by 255 historical WAMEX reports.
Register summary
- Holders
- Lamerton Pty Ltd, Geoda Pty Ltd
- Local government
- Shire of Coolgardie
- Application received
- 22 Apr 1999
- Commenced
- 13 Dec 1999
- Expiry
- 12 Dec 2041
- Term
- 21 Years (Renewed)
The full record on L 16/58
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 6 changes of holder
- The full record: 42 conditions and 1 endorsement
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (30 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A152928 | 2025 | Gold Tiger Resources (Australia) Limited | Credo | <1% | Final Surrender Report for E16/449 Credo Project for the period ending 10/10/2025 |
| A143809 | 2024 | Lithgold Minerals Ltd | Ida Fault | 1.3% | Ida Fault Project, E16/515 Final Report for the period 5 August 2019 to 26 June 2024 |
| A130141 | 2022 | Gold Tiger Resources (Australia) Limited | Credo | <1% | Surrender Report For E16/415 & E16/457 Credo Project for the period ending 10/12/2021. |
| A132634 | 2022 | Lithgold Minerals Ltd | Ida Fault | 1.3% | Ida Fault Project, E16/515 Annual Report for the period 5 August 2021 to 4 August 2022 |
| A130111 | 2022 | Gold Tiger Holdings (Australia) Pty Ltd | Credo | <1% | Final Surrender Report for E16/365 & M16/524 Credo Project for the period ending 10/12/2021. |
245 more reports with detail
| A133190 | 2022 | Ora Banda Mining | Lady Ida | <1% | E16/483 and E16/487 Partial Surrender Lady Ida for the period ending 7/11/2022 |
| A128805 | 2021 | Evolution Mining (Mungari) Pty Ltd | Little Crest Dam | 1.3% | Final Surrender Report - P16/3019 and P16/3020 Little Crest Dam Project for the period 25 July 2017 to 24 July |
| A128692 | 2021 | Origin Gold Mines Limited | Ida Fault | 1.3% | Annual Mineral Exploration Report For E16/515 Ida Fault Project for the period ending 04/08/2021 |
| A128930 | 2021 | Ora Banda Mining Limited | Lady Ida | <1% | Lady Ida E16/475 Partial Surrender for the period 5 October 2015 to 4 October 2021 |
| A122626 | 2020 | Scorpion Mining Pty Ltd | Kintore | 1.5% | Kintore M16/430 Mineral Exploration Report for the period 13 September 2018 to 12 September 2019 |
| A123040 | 2020 | Ora Banda Mining Limited | Davyhurst D | <1% | Lady Ida Annual Report C212/2017 (Davyhurst D) for the period 1 January 2019 to 31 December 2019 |
| A124661 | 2020 | Barra Resources Limited | Phillips Find | <1% | Technical Report for the Phillips Find Project CR163/2006 for the period ending 30/06/2020 |
| A125537 | 2020 | Origin Companies Pty Ltd | Credo | 1.3% | Credo Project E16/515 Annual Technical Report for the period ending 04/08/2020 |
| A125399 | 2020 | Gold Tiger Resources (Australia) Pty Ltd | Credo | <1% | Credo Project C03/2013 Combined Annual Technical Report 01/07/19 to 30/06/2020 |
| A123163 | 2020 | Evolution Mining (Mungari) Pty Ltd | Kintore-Kunanalling | <1% | Annual Report - C3/2017 - Kintore/Kunanalling - 1 January 2019 to 31 December 2019 |
| A119120 | 2019 | Scorpion Mining Pty Ltd | Kintore | 1.5% | M16/430 Annual Exploration Report For the Period 13 September 2017 to 12 September 2018 |
| A119473 | 2019 | Eastern Goldfields Limited | Lady Ida | <1% | Lady Ida Annual Report - C212/2017 for the period 1 January 2018 to 31 December 2018, E16/00337, E16/00344, E1 |
| A119552 | 2019 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanalling | <1% | Group Annual Technical Report - Kintore Kunanalling - C3/2017 For the Period 1 January 2018 to 31 December 201 |
| A119923 | 2019 | Evolution Mining (Mungari) Pty Ltd | Carbine | <1% | Surrender Report P16/2647 and P16/2648 Carbine Project for the period 7 January 2011 to 6 January 2019, C03/20 |
| A120462 | 2019 | Eastern Goldfields Limited | Lady Ida | <1% | Lady Ida Partial Surrender Report for the period 2 May 2016 to 5 April 2019, E16/00480, E16/00482, E16/00483, |
| A121059 | 2019 | Barra Resources Limited | Phillips Find | <1% | Annual Technical Report for the Phillips Find Project C163/2006 for the period 1 July 2018 to 30 June 2019 |
| A121254 | 2019 | Tanvanth Sandhu Singh | Credo | <1% | Credo Project C03/2013 Combined Annual Tenement Report 01/07/18 to 30/06/2019.E 16/00365,E 16/00393,E 16/00396 |
| A115916 | 2018 | Peter Milne | Kintore | 1.5% | Kintore Project M16/430 2017 Exploration Report for the period 13/09/2016 - 12/09/2017 ver 2 |
| A116303 | 2018 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanulling | <1% | Annual Report Kintore - Kunanulling C3/2017 For the Period 1 January 2017 to 31 December 2017 |
| A117294 | 2018 | Evolution Mining (Mungari) Pty Ltd | Kratos | <1% | Final Surrender Report Kratos Project C3/2017 for the period 17 June 2010 to 16 June 2018, P16/02554, P16/0255 |
| A117298 | 2018 | Evolution Mining (Mungari) Pty Ltd | Kratos | 2.7% | Final Surrender Report P16/2572 Kratos Project for the period 2 July 2010 to 1 July 2018 |
| A117508 | 2018 | Barra Resources Limited | Phillips Find | <1% | Combined Annual Report for Phillips Find Project (CR163/2006), 01 July 2017 - 30 June 2018 |
| A115745 | 2018 | Eastern Goldfields Limited | Lady Ida | <1% | C212/2017 Lady Ida E16/482 and E16/483 Annual Report For the Period 7 November 2016 to 6 November 2017 |
| A116104 | 2018 | Eastern Goldfields Limited | Lady Ida | <1% | Lady Ida Combined Reporting Group C212/2017 Annual Report for the period 1 January 2017 to 31 December 2017, E |
| A117754 | 2018 | Sandhu, Ts | Credo | <1% | Combined Annual Tenement Report 1/07/2017 to 30/06/2018, Credo, C3/2013 |
| A111963 | 2017 | Peter Milne | Kintore | 1.5% | Kintore Project M16/430 Exploration Report 2016 for the period 13 September 2015 to 12 September 2016 ver. 2 |
| A112431 | 2017 | Evolution Mining (Mungari) Pty Ltd; Hayes Mining Pty Ltd | Kintore - Kunanalling | <1% | Annual Report on the Kintore - Kunanalling Project, C3/2017, for the period 1 January 2016 to 31 December 2016 |
| A114966 | 2017 | Barra Resources Limited | Phillips Find | <1% | Annual Technical Report for the Phillips Find Gold Project (C163/2006) for the period 1 July 2016 to 30 June 2 |
| A115517 | 2017 | Barra Resources Ltd | Carbine South | <1% | Final Report for Carbine South Project (C24/2009) for the period 24/09/2016-23/09/2017, P16/02422, P16/02423, |
| A112370 | 2017 | Eastern Goldfields Limited | Lady Ida | <1% | Mount Ida Annual Report C110/2015 For the Period 1 January 2016 to 31 December 2016, E16/00332.....E16/00475 |
| A109675 | 2016 | Torian Resources Limited | Stackhole Dam Project | <1% | Stackhole Dam Project Annual Report, 1 July 2015 to 30 June 2016 |
| A110013 | 2016 | Sandhu, Ts | Credo | <1% | Combined Annual Tenement Report Credo Project C3/2012 For the Period 1 July 2015 to 30 June 2016, E16/00393, E |
| A110055 | 2016 | Evolution Mining (Mungari) Pty Ltd | Kintore | <1% | Annual Report for the period 1st July 2015 to 30th June 2016, Kintore, Kintore East, Carbine, Broads Dam, Star |
| A110100 | 2016 | Barra Resources Limited | Phillips Find | <1% | Annual Technical Report for the Phillips Find Project (C163/2006) For the Period 1 July 2015 to 30 June 2016 |
| A110188 | 2016 | Barra Resources Limited | Carbine South | <1% | Combined Annual Technical Report for the Carbine South Project For the Period 24 September 2015 to 23 Septembe |
| A108336 | 2016 | Scorpion Mining Pty Ltd | Kintore | 1.5% | ANNUAL REPORT ON MINING LEASE M16/430 KINTORE PROJECT FOR THE PERIOD 13/9/2014 TO 12/9/2015 |
| A108354 | 2016 | Eastern Goldfields Limited | Lady Ida | <1% | LADY IDA PROJECT MINERAL EXPLORATION REPORT E16/332, E16/337, E16/344, E16/347, E16/456, M16/262, M16/263, M16 |
| A107992 | 2016 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Project Annual Mineral Exploration Report C153/2006 For the period 1st January 2015 to 31st Decemb |
| A108123 | 2016 | Phoenix Gold Limited | Carbine West | <1% | Carbine West Mineral Exploration Report P16/2445 P16/2446 P16/2447 P16/2450 P16/2451 P16/2452 P16/2453 P16/274 |
| A104845 | 2015 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Project, Annual Report for the period 01/01/2014 to 31/12/2014, C153/2006. |
| A105021 | 2015 | Swan Gold Mining Ltd | Lady Ida | <1% | Lady Ida Project Combined Mineral Exploration C59/2008 For the Period 1/01/2014 – 31/12/2014, E16/252, E16/332 |
| A105136 | 2015 | Phoenix Gold Limited | Carbine West | <1% | Carbine West Project C108/2009 Mineral Exploration Report for the period 14th January 2014 to 13th January 201 |
| A105394 | 2015 | Scorpion Mining Pty Ltd | Londonderry | 1.5% | Annual Report on M16/430 Londonderry Project for the period 13/9/2013 - 12/9/2014 |
| A105522 | 2015 | Matsa Resources Limited | Dunnsville | <1% | Combined Annual Report Dunnsville Project C196/2007 for the period 1st February 2014 – 31st January 2015, E16/ |
| A106632 | 2015 | La Mancha Resources Australia Pty Ltd | Kintore | <1% | Annual Report for the period 1st July 2014 to 30th June 2015,C144/2014 Kintore, Kintore East, Carbine, Broads |
| A106869 | 2015 | Barra Resources Ltd | Phillips Find | <1% | Annual Technical Report for the Phillips Find Project (C163/2006) for the period 01 July 2014 – 30 June 2015 |
| A106945 | 2015 | Singh B | Credo | <1% | Credo Project C03/2002, E16/393, E16/365, E16/396, E16/415, E16/449, E16/457, E16/458, M16/524, P16/2667 Annua |
| A106981 | 2015 | Barra Resources Ltd | Carbine South | <1% | Carbine South Project Annual Report (C24/2009) P16/2422, P16/2423, P16/2424 and P16/2425 For the period 24 Sep |
| A107008 | 2015 | Matsa Resources Limited | Dunnsville | <1% | Final Surrender Report E16/297 Dunnsville Project for the period 21 August 2006 to 23 June 2015 |
| A107050 | 2015 | Matsa Resources Limited | Dunnsville | 1.1% | Final Surrender Report Dunnsville E16/399 For the Period 10 January 2011 to 23 June 2015 |
| A107223 | 2015 | Torian Resources Ltd | Stackhole Dam | <1% | Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2014 – 30 June 2015 M16/229, M16/491,P16/2479-81 |
| A100564 | 2014 | Metaliko Resources Ltd | Frances Lesley | <1% | Surrender report for the period 27 March 2008 to 13 November 2013, Frances Lesley Project, E16/335 |
| A101142 | 2014 | Swan Gold Mining Ltd | Lady Ida | <1% | Lady Ida Project, Annual Report for the period 01/01/2013 to 31/12/2013, E16/252, 327, 332, 337, 344, 347, 355 |
| A101201 | 2014 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Project, Annual Report, Reporting Group: C153/2006, For the period 1st Januray 2013 to 31st Decem |
| A101646 | 2014 | Phoenix Gold Limited | Carbine West | <1% | Carbine West Project Annual Mineral Exploration Report (C108/2009) P16/2445, P16/2446, P16/2447, P16/2450, P16 |
| A101811 | 2014 | Milne P | Londonderry | 1.5% | Annual Report on Mining Lease M16/430 Londonderry Project for the period 13/9/2012 - 12/9/2013 |
| A102052 | 2014 | Matsa Resources Ltd | Dunsville | <1% | Combined Annual Report Dunnsville Project C196/2007 for the period 1st February 2013 – 31st January 2014, E16/ |
| A103136 | 2014 | Sandhu, Ts | Credo | <1% | C3/2013 Annual Exploration Report Credo Project for the period 09/12/2013 to 08/12/2014, E16/393, 365, 396, 41 |
| A103649 | 2014 | Barra Resources Ltd | Phillips Find | <1% | Phillips Find Project, Annual Report for the period 01/07/2013 to 30/06/2014, M16/130, 133, 168, 171, 242, & 2 |
| A103786 | 2014 | Strategic Projects Mining Pty Ltd | Stackhole Dam | <1% | Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2013 – 30 June 2014 M16/229,M16/491,P16/2479-81 |
| A103900 | 2014 | Barra Resources Ltd | Carbine South | <1% | Carbine South Project C24/2009 Annual Report for the period 24/09/2013 to 23/09/2014, P16/2422, P16/2423, P16/ |
| A102594 | 2014 | Swan Gold Mining Ltd | Lady Ida | <1% | Surrender Report Lady ida Project E16/400, E16/412, P16/2502, P16/2503, P16/2504, P16/2505, P16/2506, P16/2507 |
| A103169 | 2014 | La Mancha Resources Australia Pty Ltd | Kintore | <1% | Annual Report for the period 1st July 2013 to 30th June 2014, Kintore, Kintore East, Carbine, Broads Dam, Star |
| A96993 | 2013 | Phoenix Gold Limited | Kunanalling | <1% | Kunanalling Project, Annual Report for the period 1st January 2012 to 31st December 2012, M15/696; M16/15..... |
| A97085 | 2013 | Swan Gold Mining Ltd | Lady Ida | <1% | LADY IDA PROJECT Mineral Exploration Report for the period 1/01/2012 – 31/12/2012 C59/2008, E16/252.....P16/25 |
| A97179 | 2013 | Strategic Projects Mining Pty Ltd | Stackhole Dam | <1% | Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2011 – 30 June 2012 M16/164, M16/229, M16/257, M16 |
| A97447 | 2013 | Phoenix Gold Limited | Carbine West | <1% | Carbine West Project, Annual Report for the period 14th January 2012 to 13th January 2013, P16/2445-2447, 245 |
| A97645 | 2013 | Sandhu, Ts | Credo | <1% | E16/415 Annual Exploration Report for the period 28/03/2012-27/03/2013 |
| A97740 | 2013 | Metaliko Resources Ltd | Frances Lesley | <1% | Annual report for the period 1 January 2012 to 8 January 2013, Frances Lesley Project, E16/335 |
| A97843 | 2013 | Matsa Resources Ltd | Dunnsville | <1% | Dunnsville Project, Annual Report for the period 1st February 2012 to 31st January 2013, E16/294, 296, 297, 36 |
| A97967 | 2013 | La Mancha Resources Australia Pty Ltd | Kintore | <1% | Kintore Project, Annual Report for the period 06/03/2012 to 05/03/2013, P16/2358-2374, 2586, 2589-2591, 2642-2 |
| A99166 | 2013 | Sandhu, Ts | Credo | <1% | C3/2013 Annual Exploration Report Credo Project E16/365, E16/393, E16/396, E16/415, M16/524 and P16/2667 Repor |
| A99397 | 2013 | Strategic Projects Mining Pty Ltd | Stackhole Dam | <1% | Stackhole Dam Project Annual Report C22/2012 Period: 1 July 2012 – 30 June 2013 M16/164, M16/229, M16/257, M16 |
| A100610 | 2013 | Barra Resources Ltd | Carbine South | <1% | Annual Report for the period 24/09/12 to 23/09/13, Carbine South Project, C24/2009, 2013, P16/2422, P16/2423, |
| A99335 | 2013 | Barra Resources Ltd | Phillips Find | <1% | Phillips Find Project, Annual Report for the period 01/07/2012 to 30/06/2013, M16/130, 133, 168, 171, 242 & 25 |
| A94167 | 2012 | La Mancha Resources Australia Pty Ltd | Kintore | <1% | Annual Report for the period 6 March 2011 to 5 March 2012, Kintore, Kintore East and Carbine Projects, P16/235 |
| A95246 | 2012 | Barra Resources Ltd | Phillips Find | <1% | Annual Technical Report for the period 01/07/11 to 30/06/12, Phillips Find Project, C163/2006, 2012, M16/130.. |
| A95455 | 2012 | Barra Resources Ltd | Carbine South | <1% | Carbine South Project, Annual Report for the period 24/09/2011 to 23/09/2012, P16/2420-2425. [C24/2009]. |
| A93570 | 2012 | Matsa Resources Ltd | Dunnsville | <1% | Combined Annual Report Dunnsville Project C196/2007 for the period 1st February 2011 – 31st January 2012, E16/ |
| A94450 | 2012 | Nex Metals Exploration Ltd | Bullabulling | 1.1% | Bullabulling E16/333 Eastern Gold Fields Final Surrender Report |
| A92835 | 2012 | Phoenix Gold Limited | Kunanulling | <1% | Kunanulling Project, Annual Report for the period 1st January 2011 to 31st December 2011, M15/696; M16/15..... |
| A93023 | 2012 | Phoenix Gold Limited | Carbine West | <1% | Carbine West Project, Annual Technical Report for Period 14/1/2011 to 13/1/2012, Prospecting Leases: P16/2445, |
| A93551 | 2012 | Metaliko Resources Ltd | Frances Lesley | <1% | Annual report for the period 9 January 2011 to 8 January 2012, Frances Lesley Project, C271/2011, E16/292 & E1 |
| A90072 | 2011 | Matsa Resources Ltd | Dunnsville | <1% | Dunnsville Project, Annual Report for the period 1st February 2010 to 31st January 2011, E16/294, E16/296-297, |
| A90752 | 2011 | La Mancha Resources Australia Pty Ltd | Kintore East - Carbine | <1% | Annual Report for the period 6 March 2010 to 5 March 2011, Kintore, Kintore East and Carbine Projects C187/200 |
| A91144 | 2011 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008, Reporting Period: 1 July 2010 to 30 June 2011 |
| A91507 | 2011 | Barra Resources Ltd | Phillips Find | <1% | Annual Technical Report for the period 01/07/10 to 30/06/11, Phillips Find Project, C163/2006 |
| A89370 | 2011 | Phoenix Gold Limited | Castle Hill | <1% | Annual Technical Report for Period 1/1/10 to 31/12/10, Castle Hill, Combined Reporting Number C99/1994 Mining |
| A89933 | 2011 | Phoenix Gold Limited | Carbine West | <1% | Carbine West, Annual Technical Report For the period 14st January 2010 to 13sth January 2011, P16/2445, P16/24 |
| A91950 | 2011 | Barra Resources Ltd | Carbine South | <1% | Annual Technical Report for the period 24/09/10 to 23/09/11, Carbine South Project, C24/2009, P16/2420, 2421, |
| A86072 | 2010 | Heron Resources Ltd | Dunnsville | <1% | Annual Report for the period 1 January 2009 to 31 December 2009, Dunnsville Project, C125/2008, E16/292, E16/3 |
| A86565 | 2010 | Matsa Resources Ltd | Dunnsville | <1% | Combined Annual Report Dunnsville Project C196/2007 E16/259 E16/296 M16/487 E16/294 E16/297, 1st February 2009 |
| A87601 | 2010 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Project Mineral Exploration Report C188/2008 Reporting Period: 1July 2009 to 30 June 2010 |
| A88458 | 2010 | Matsa Resources Ltd | DUNNSVILLE | <1% | PARTIAL SURRENDER REPORT DUNNSVILLE PROJECT E16/297 21st August 2006 – 17th August 2010 |
| A87752 | 2010 | Barra Resources Ltd | Phillips Find | <1% | Annual Technical Report for the period 01/07/2009 to 30/06/2010, Phillips Find Project, C163/2006 |
| A88039 | 2010 | Matsa Resources Ltd | Dunnsville | <1% | FINAL SURRENDER REPORT DUNNSVILLE PROJECT E16/259 30th June 2006 – 9th August 2010 |
| A85733 | 2010 | Matsa Resources Ltd | Dunnsville | <1% | Partial Surrender Report Dunnsville Project E16/297 21 August 2006 - 12 November 2009 |
| A85759 | 2010 | Gbs Gold Australia Pty Ltd | Credo | <1% | Partial Surrender Report Credo Project E16/301 |
| A86075 | 2010 | Heron Resources Ltd | Dunnsville | <1% | Partial surrender report for the period 9 January 2006 to 8 January 2010, Dunnsville Project, E16/292 |
| A87648 | 2010 | Gbs Gold Australia Pty Ltd | Credo | <1% | Surrender Report Credo Project E16/301 |
| A88311 | 2010 | Barra Resources Ltd | Carbine South | <1% | Carbine South Combined Annual Technical Report (C24/2009) P16/2420, P16/2421, P16/2422, P16/2423, P16/2424 and |
| A80659 | 2009 | Vale Exploration Pty Ltd | DUNNSVILLE | <1% | DUNNSVILLE PROJECT C125/2008, TENEMENT: E16/292, PARTIAL SURRENDER REPORT, Kalgoorlie Primary Number 2171, blo |
| A82416 | 2009 | Cazaly Resources Ltd | CARBINE | 4.2% | Annual Report CARBINE PROJECT P16/2451 For the Period 12 March 2008 to 11 March 2009 |
| A84909 | 2009 | Matsa Resources Ltd | Dunnsville | <1% | Partial Surrender Report Dunnsville Project E16/259, 30th June 2006 – 7th August 2009 |
| A81224 | 2009 | Apex Minerals Nl | Jaurdi Hills | <1% | ANNUAL TECHNICAL REPORT Jaurdi Hills Project, Western Australia, For the Period January 8th, 2008 to January 7 |
| A81592 | 2009 | Matsa Resources Ltd | DUNNSVILLE | <1% | COMBINED ANNUAL REPORT DUNNSVILLE PROJECT, C196/2007, 1st February 2008 – 31st January 2009 |
| A84320 | 2009 | Barra Resources Ltd | Phillips Find | <1% | Phillips Find, Combined Annual Technical Report (C163/2006), For the Period01 July 2008 to 30 June 2009. |
| A84715 | 2009 | Paddington Gold Pty Ltd | Carbine | <1% | Carbine Mineral Exploration Report, Period 1 July 2008 to 30 June 2009, Tenements: M16/23, M16/48, M16/58, M16 |
| A85018 | 2009 | Barra Resources Ltd | Carbine South | <1% | Carbine South, Combined Annual Report (C24/2009), P16/2420, P16/2421, P16/2422, P16/2423, P16/2424 and P16/242 |
| A85153 | 2009 | Heron Resources Ltd | Kintore North West | <1% | Annual report for the period 5 October 2008 to 4 October 2009, Kintore North West Project, P16/2312 |
| A77344 | 2008 | Cazaly Resources Ltd | Carbine South East | <1% | Combined Annual Report WEST KALGOORLIE PROJECT Carbine South East Prospect For the Period 7 November 2006 to 6 |
| A78167 | 2008 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | <1% | COMBINED ANNUAL REPORT DUNNSVILLE PROJECT C196/2007 1ST FEBRUARY 2007 - 31ST JANUARY 2008 |
| A78267 | 2008 | Toro Mining Pty Ltd | Jaurdi Hills | <1% | Annual technical report, Jaurdi Hills Project, For the period January 8th, 2007 to January 7th 2008, C277/1994 |
| A78531 | 2008 | Dioro Exploration Nl | Credo | <1% | Credo Project, Annual Report for the year ending 12th May 2008, E16/251. |
| A79349 | 2008 | Barra Resources Ltd | Philips Find | <1% | Phillips Find, Combined Annual Technical Report (C163/2006), for the period 01 July 2007 to 30 June 2008 |
| A80495 | 2008 | Vale Inco Australia Limited Partnership | Dunnsville | <1% | COMBINED ANNUAL REPORT FOR THE PERIOD 9 JANUARY 2008 - 31 DECEMBER 2008, C125/2008 |
| A77188 | 2008 | Monarch Gold Mining Company Ltd | Davyhurst | <1% | DAVYHURST PROJECT Reporting Group C189/2007 Report Type: Annual Technical Report Report Period: 2 November 200 |
| A77358 | 2008 | Inco Resources (Australia) Pty Ltd | Dunnsville | <1% | TENEMENT: E16/292 COOLGARDIE MINERAL FIELD KUNANALLING DISTRICT 16 ANNUAL REPORT FOR THE PERIOD 9 JANUARY 2007 |
| A80179 | 2008 | Dioro Exploration Nl | Credo | <1% | SURRENDER REPORT FOR THE PERIOD 13 MAY 2005 12 MAY 2008 |
| A80268 | 2008 | Heron Resources Ltd | KINTORE NORTH WEST | <1% | Annual report for the period 5 October 2007 to 4 October 2008, Kintore North West Project, P16/2312 |
| A74388 | 2007 | Monarch Gold Mining Company Ltd | Carbine | <1% | Carbine Project M16/86, 143, 150, 164, 212, 244, P16/1439, 1512, 1570-73, 1816, 1915-16, 2178-82, 2006 Annual |
| A74389 | 2007 | Monarch Gold Mining Company Ltd | Lady Ida | <1% | Lady Ida Project Area, E16/174, E16/192, E16/252, M16/262, M16/262-M16/264, 2005/2006 Annual Report for the Pe |
| A74031 | 2007 | Gbs Gold Australia Pty Ltd | Credo | <1% | Annual Exploration Report, Credo Project E16/301, For Period 7 September 2005 to 6 September 2006, (Kalgoorlie |
| A74331 | 2007 | Cazaly Resources Ltd | Carbine South East | <1% | Combined Annual Report C44/2002, West Kalgoorlie Project Carbine South East Project P16/2016,2017,2152, For th |
| A74590 | 2007 | Inco Australia Ltd | Dunnsville | <1% | E16/292, Annual Report for the Period 9 January 2006 to 8 January 2007, (Kalgoorlie). |
| A75783 | 2007 | Barra Resources Ltd | Phillips Find | <1% | Combined Annual Technical Report (C163/2006) (M16/130,M16/133,M16/168,M16/171,M16/242,M16/258,P16/1261- 1264,P |
| A76554 | 2007 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | <1% | ANNUAL REPORT DUNNSVILLE PROJECT E16/259 30 JUNE 2006 - 30 JUNE 2007 |
| A76731 | 2007 | Gbs Gold Australia Pty Ltd | Credo | <1% | ANNUAL EXPLORATION REPORT CREDO PROJECT E16/301 For reporting period 7th September 2006 to 6th September 2007 |
| A77301 | 2007 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | <1% | ANNUAL REPORT DUNNSVILLE PROJECT E16/297 21 AUGUST 2006 - 20 AUGUST 2007 |
| A71994 | 2006 | Siberia Mining Corporation Ltd | Kangaroo Plains/Nugget Dam/Lady Ida gold | <1% | Lady Ida Project, E16/174,192,252,M16/262-264, Kunanalling Mineral Field, Annual Technical Report, 03/10/2004 |
| A71993 | 2006 | Siberia Mining Corporation Ltd | Carbine | <1% | Carbine Project, Annual Technical Report 01/01/2005 to 31/12/2005, Combined Reporting No. C109/2005, Kalgoorli |
| A73006 | 2006 | Barra Resources Ltd | Dunns Eight Mile | <1% | Combined Annual Technical Report C29/2001 for the Period 1 July 2005 to 30 June 2006, Foxton JV, (Kalgoorlie). |
| A73202 | 2006 | Cazaly Resources Ltd | Carbine South East | 1.1% | West Kalgoorlie Project Carbine South East Prospect P16/2016,2017, Combined Annual Report C44/2002 for the Per |
| A73338 | 2006 | South Kal Mines Pty Ltd | Credo | <1% | Credo Project E16/251, Annual Report for the Period 13 May 2005 to 12 May 2006, (SKM Report No. SKM_TL_X2445, |
| A70388 | 2005 | Siberia Mining Corporation Ltd | Carbine | <1% | Carbine Project, P16/1570, Annual technical report 9/03/04 - 8/03/05 Kalgoorlie |
| A70065 | 2005 | Siberia Mining Corporation Ltd | Red Dam | <1% | Annual technical report for the period 11/01/04 - 10/01/05 Red Dam Project, M16/143, Kalgoorlie |
| A70190 | 2005 | Ida Gold Operations Pty Ltd | Lady Ida | <1% | Annual Report for the period 01/02/04 - 31/01/05, Lady Ida Project, C22/1995, M16/262, M16/263, M16/264. |
| A70328 | 2005 | Siberia Mining Corporation Ltd | Lady Ida East | <1% | Lady Ida East Project, E16/226, Annual technical report, 26/02/04 - 25/02/05, (Kunanalling mineral field, Kalg |
| A70387 | 2005 | Siberia Mining Corporation Ltd | Carbine | 1.7% | Carbine Project, P16/1571, Annual technical report 9/03/04 -08/03/05 Kalgoorlie |
| A70412 | 2005 | Cazaly Resources Ltd | Carbine South East | 1.1% | Combined annual report for the period 07/11/03 - 06/11/04 Carbine South East Project, C44/2002, P16/2016, P16/ |
| A71125 | 2005 | Cazaly Resources Ltd | Carbine South | <1% | Combined annual report C114/2001, Carbine South Project, For the period 25 May 2004 to 24 May 2005 (P16/1850-1 |
| A71339 | 2005 | Barra Resources Ltd | Foxton | <1% | Foxton Project, Combined annual technical report C29/2001 Annual report for the period 01/07/2004 to 30/06/200 |
| A67977 | 2004 | Placer Dome Asia Pacific Ltd | Carbine SE | 1.1% | Annual Report for the period 07/11/2002- 06/11/2003 Carbine SE Project (C44/2002) P16/2016-2017 |
| A68508 | 2004 | Placer Dome Asia Pacific Ltd | Carbine/Zuleika | <1% | Carbine/Zuleika Project Annual Report 09/03/2003 to 08/03/20 04 C303/1997 M16/27...M16/411, P16/1439...P24/335 |
| A68613 | 2004 | Siberia Mining Corporation Ltd | Lady Ida | <1% | Lady Ida Project, M16/262-264, Kunanalling Mineral Field, Annual Technical report 01/02/2003-31/01/2004, Combi |
| A69364 | 2004 | Barra Resources Ltd | Foxton | <1% | Foxton Project, Combined Annual Technical Report, C29/2001, Annual Report for the period 01/07/2003 to 30/06/ |
| A66353 | 2003 | Placer Dome Asia Pacific Ltd | Lady Ida | <1% | Lady Ida Project Annual Report 01/02/2002-31/01/2003 C22/1995: M16/261-64 |
| A66658 | 2003 | Placer Dome Asia Pacific Ltd | Carbine | <1% | Carbine/ Zuleika Project, Annual Report 09/03/2002 - 08/03/2003 C303/1997: M16/27, 44-5, 48, 58, 86, 106, 143, |
| A67089 | 2003 | Placer Dome Asia Pacific Ltd | Carbine South | <1% | Carbine South Project,Annual Report, 25/05/2002 to 24/05/2003 th Project C114/2001: P16/1850-53,1966-72 C114/2 |
| A67370 | 2003 | Breakaway Resources Ltd | Kintore | 1% | Surrender Report for the period 6 October 1992 to 12 August 2003 Kintore Project P16/1536,1541,1542 |
| A67522 | 2003 | Barra Resources Ltd | Foxton | <1% | Foxton Project, Combined Annual Technical Report, C29/2001, Annual Report for the period 01/07/2002 to 30/06/ |
| A64682 | 2002 | Homestake Gold Of Australia Ltd | Dunn's North Option | <1% | Project 6255 P16/2011-2020 Annual Report 30 November 2000 - 30 June 2001 Technical Report No. 997 Map Sheet: |
| A64980 | 2002 | Auriongold Exploration Pty Ltd | Credo | <1% | Credo Project Annual Report 28/04/2001 - 27/04/2002 C100/2001. Tenement/s P16/2042, E16/176, 183, 185-187, 200 |
| A65102 | 2002 | Auriongold Exploration Pty Ltd | Carbine Zuleika | <1% | Annual Report Reporting Period 09/03/2000 - 08/03/2002 Combined Reporting NO C303/1997. Tenement/s M16/23, 27, |
| A65157 | 2002 | Auriongold Exploration Pty Ltd | Credo | <1% | Credo Project Surrender Report 03/04/2000 - 09/08/2002 E16/176, 200, 208, 210, E30/223-224, 229 Mineral Field |
| A65209 | 2002 | Auriongold Exploration Pty Ltd | Carbine South | <1% | Carbine South Project Annual Report 25/05/2001 - 24/05/2002 C114/2001 Tenement/s P16/1850-53, 1966-72 Mineral |
| A65254 | 2002 | Barra Resources Ltd | Dunns Eight Mile | <1% | Foxton Project Combined Annual Technical Rpeort C29/2001 Annual Report for the Period 01/07/2001 to 30/06/2002 |
| A65305 | 2002 | Auriongold Exploration Pty Ltd | Carbine South | <1% | Carbine South Project Annual Report 25/05/2001 - 24/05/2002 C114/2001 Tenement/s P16/1850-53, 1966-72 Mineral |
| A65665 | 2002 | Auriongold Exploration Pty Ltd | Carbine South East | 1.1% | Carbine South East Project Annual Report 01/07/2001- 06/11/2002 C44/2002. Report No. WA02.081. Tenements: P16/ |
| A62710 | 2001 | Delta Gold Ltd | Lady Ida | <1% | Lady Ida Project E16/84 and 85 Annual Report 24 January 1992 to 23 January 2001 E16/89 Surrender Report 14 Dec |
| A62984 | 2001 | Barminco Pty Ltd | Dunnsville | <1% | Dunsville Project, Combined Annual Technical Report, C433/1995, Annual Report for the Period 01/11/1998 to 31/ |
| A63286 | 2001 | Archaean Gold Nl | Dunns Eight Mile & Breakdown Dame | <1% | Dunns Eight Mile & Breakdown Dame Projects Annual Report 01.11.96 - 31.10.97 M16/171, P16/1261-1264, 1268, 132 |
| A63663 | 2001 | Barra Resources Ltd | Dunnsville | <1% | Dunnsville Project Combined Annual Technical Report C433/1995 Annual Report for the period 01/11/2000 to 30/06 |
| A63808 | 2001 | Delta Gold Ltd | Lady Ida | <1% | Lady Ida project, M16/261-264 ,Interim Report for the period 1 April to 30 September 2001, |
| A63951 | 2001 | Centaur Mining & Exploration Ltd | Doyles Dam | <1% | Joint Annual Report for the period 18 February 2000 to 17 February 2001 C276/1997 - Doyles Dam prospecting lic |
| A60001 | 2000 | Delta Gold Ltd | Lady Ida | <1% | Lady Ida Project Surrender Report for E16/110 Reptile Dam Report No. WA00.014 |
| A59716 | 2000 | Barminco Pty Ltd | Dunns Eight Mile | <1% | Dunns Eight Mile Project, Annual report 01/11/1998 to 31/10/1999, Combined reporting Status, GSWA reference C4 |
| A60211 | 2000 | Delta Gold Ltd | Lady Ida | <1% | Lady Ida Project, Annual Report, 02/1999 to 01/2000, E16/84, 85,89,109-112,115, E15/503, M16/261-264. |
| A60559 | 2000 | Delta Gold Ltd | Dunnsville | <1% | Annual technical Report Dunnsville Joint Venture 24/05/1999 to 23/05/2000 Tenements E16/90,P16/1534,P16/1535. |
| A61372 | 2000 | Centaur Mining & Exploration Ltd | Carbine Zuleika | <1% | Mining Leases M16/23,27,44,45,58,86,106,143,150,156,164,188, 212, Prospecting Licences P16/1353-1356,1373,1439 |
| A61482 | 2000 | Delta Gold Ltd | Dunnsville North | <1% | Dunnsville North Project, (E16/95) Annual/Final Report 1999 - 2000 |
| A61496 | 2000 | Mr Laurie J | Top Dam | <1% | Top Dam Project, (E16/124) Annual Report 1999 - 2000 and Final Surrender Report |
| A56965 | 1999 | Amalg Resources Nl | Kintore | 1% | Kintore Project - Annual Report P16/1536, 1541, 1542, C29/1997 - 05/01/9999 |
| A57061 | 1999 | Delta Gold Ltd | Ida Fault | <1% | Ida Fault Project (E16/95- Paladin) Annual Report 1997 - 1998. |
| A57091 | 1999 | Abador Gold Nl | Slat Dam | <1% | Annual Report for 1996/97 and 1997/98 and Surrender Report Slat Dam Project Exploration Licence 16/134, For th |
| A57677 | 1999 | Gindalbie Gold Nl | Dunns Eight Mile | <1% | Dunns Eight Mile Project M16/171, P16/1261-1264, 1268, 1329 31/10/98 |
| A58084 | 1999 | Delta Gold Ltd | Lady Ida | <1% | Delta Gold NL - Lady Ida Project 01/1998 - 01/1999 E16/89, 115, 84, 85, 109-112, E15/503 |
| A58289 | 1999 | Coolgardie Gold Nl | Top Dam | <1% | Annual Report E16/124 for period 26/03/1998 to 25/03/1999 (Top Dam Project). |
| A58530 | 1999 | Delta Gold Ltd | Lady Ida | <1% | Lady Ida Project Partial Surrender Report for E16/110 [Reptile Dam] |
| A58807 | 1999 | Coolgardie Gold Nl | Top Dam | <1% | Top Dam Project, (E16/124) Surrender Report for the period 26/03/1996 to 25/03/2000. |
| A59017 | 1999 | Delta Gold Ltd | Dunnesville gold exploration | <1% | Annual Technical Report for Dunnsville Joint Venture 24/05/1998 to 23/05/1999 Tenements E16/90,P16/1534,P16/15 |
| A59105 | 1999 | Centaur Mining & Exploration Ltd | Carbine Zuleika | <1% | C303/1997 - Carbine - Zuleika, Joint Annual Report For the Period 9/03/1998 to 8/03/1999 (M16/23, M16/27, M16/ |
| A59440 | 1999 | Delta Gold Ltd | Lady Ida | <1% | Lady Ida Project, Annual Report for E16/95, Dunnsville North 24 November 1998 to 23 November 1999 . |
| A53302 | 1998 | Eden Creek Pty Ltd | Dunnsville | <1% | Dunnsville Project, (E16/95) Annual Report 1996 - 1997 |
| A53590 | 1998 | Eden Creek Pty Ltd | Dunnsville | <1% | Partial Surrender Report on Exploration Licence E16/96 Dunnsville Western Australia covering the period 30 Dec |
| A53591 | 1998 | Eden Creek Pty Ltd | Dunnsville | <1% | Dunnsville Project, (E16/96) Annual Report 1996 - 1997 |
| A54537 | 1998 | Delta Gold Ltd | Ida Fault | <1% | Ida Fault Project Partial Surrender Report for E16/89, April 1998. |
| A54539 | 1998 | Delta Gold Ltd | Ida Fault | <1% | Ida Fault Project. Combined annual report for the period 01/02/97-31/01/98. E15/279-280,316,325,387. E16/84-85 |
| A54775 | 1998 | Coolgardie Gold Nl | Top Dam | <1% | Annual Report E16/124,Top Dam Project, for the period 26/03/1997 to 25/03/1998. |
| A54766 | 1998 | Centaur Mining & Exploration Ltd | Doyles Dam | <1% | Prospecting Licences P16/1867-1892 'C276/1997-Doyle's Dam' Joint Annual Report for period 18 February 1997 to |
| A55207 | 1998 | Delta Gold Ltd | Ida Fault | <1% | Ida Fault (JV) Project, Partial Surrender Report for the period 24/05/1993 to 30/06/1998, E16/90. |
| A55208 | 1998 | Delta Gold Ltd | Ida Fault | <1% | Ida Fault Project (E16/95) Partial Surrender Report for the period 24/11/1993 to 30/06/1998. |
| A55230 | 1998 | Centaur Mining & Exploration Ltd | Carbine Zuleika | <1% | C303/1997 - Carbine/Zuleika Joint Annual Report 09/03/97 - 08/03/98 Mining Licence: M16/23, 27, 44-45, 48, 58, |
| A55544 | 1998 | Delta Gold Ltd | Ida Fault | <1% | Ida Fault Project Annual Report for E16/90,P16/1534-1535 Dunnsville Joint Venture 24/05/1997 to 23/05/1998 |
| A51726 | 1997 | Lachlan Resources Nl | Kintore | <1% | Kintore Project, P16/1600 to P16/1605 P16/1631 P16/1817 and P16/1836 ,Annual Report for the period 08/06/96 to |
| A52679 | 1997 | Coolgardie Gold Nl | Gorge Dam | <1% | Gorge Dam Project, Surrender Report, October 1997, P16/1425-1431 &P 16/1751-1752. |
| A52970 | 1997 | Amalg Resources Nl | Kintore | 2.1% | Kintore - Annual Report, Year Ending 05/10/1997 Prospecting Licence: 16/1536 |
| A50054 | 1997 | Eden Creek Pty Ltd | Dunnsville | <1% | Dunnsville Project, (E16/95) Annual Report 1995 - 1996 |
| A50302 | 1997 | Eden Creek Pty Ltd | Dunnsville | <1% | Dunnsville Project, (E16/96) Annual Report for 1995 - 1996 |
| A50850 | 1997 | Delta Gold Ltd | Ida Fault | <1% | Ida Fault Project Combined Annual Report for the period 1st February 1996 to 31st January 1997 Tenements E16/8 |
| A50882 | 1997 | Coolgardie Gold Nl | Gorge Dam | <1% | Gorge Dam Project, Annual Report P16/1425-1431, P16/1751-1752 for the period 11/02/1996 to 10/02/1997. |
| A51308 | 1997 | Coolgardie Gold Nl | Top Dam | <1% | Top Dam Project, (E16/124) Annual Report 1996 - 1997 |
| A49595 | 1996 | Amalg Resources Nl | Kintore | 2.1% | Annual report Kintore P16/1536 (MLA16/316) 06/10/95 to 05/10/96 |
| A47840 | 1996 | Coolgardie Gold Nl | Gorge Dam | <1% | Gorge Dam Project, Annual Report for the period 10/02/1995 to 09/02/1996, P16/1421-P16/1431 & P16/1751-52. |
| A47876 | 1996 | Delta Gold Ltd | Ida Fault | <1% | Ida Fault Project Combined Annual report for the period 1st February 1995 to 31st January 1996 Tenements E16/8 |
| A46942 | 1996 | Eden Creek Pty Ltd | Dunnsville | <1% | Dunnsville Project, (E16/95) Annual Report 1994 - 1995. |
| A47205 | 1996 | Eden Creek Pty Ltd | Dunnsville | <1% | Dunnsville Project, (E16/96) Annual Report 1994 - 1995. |
| A48086 | 1996 | Coolgardie Gold Nl | Slattery Dam | <1% | Slattery Dam Project, Annual Report for the period 29/05/1995 to 28/05/1996, E16/76. |
| A48366 | 1996 | Herald Resources Ltd | Dunnsville | <1% | Dunnsville Project E16/90 P16/1534 & P16/1535 Annual Report for Year Ending 23/05/1996 |
| A48542 | 1996 | Newcrest Mining Ltd | Breakaway Dam | <1% | Newcrest Report No. WORA 104 OB No. 352 Ora Banda Gold Mine Breakaway Dam Project M16/58 M16/106 M16/143 M16/1 |
| A43499 | 1995 | Eden Creek Pty Ltd | Dunnsville | <1% | Dunnsville Project, (E16/95) Annual Report for theperiod 24/11/1993 to 23/11/1994. |
| A43724 | 1995 | Eden Creek Pty Ltd | Dunnsville | <1% | Dunnsville (E16/96) Annual Report 1993 - 1994 |
| A44699 | 1995 | Coolgardie Gold Nl | Slattery Dam | <1% | Slattery Dam Project, Annual Report E16/76 for the period 29/05/1994 to 28/05/1995. |
| A44872 | 1995 | Diablo Cliffs Nl | Dunns Eight Mile | <1% | Dunns Eight Mile Project,, Annual Exploration Report from June 1993 to October 1994 M16/171, P16/1261-1264, 1 |
| A44946 | 1995 | Newcrest Mining Ltd | Breakaway Dam | <1% | Newcrest Mining Report No. WORA 85 OB No. 334 Ora Banda Gold Mine Breakaway Dam Project Exploration Report on |
| A44967 | 1995 | Zephyr Minerals Nl | Dunnsville | <1% | EL16/90 P16/1534-1535 Annual Report Dunnsville Project Period Ending 23/07/1995 |
| A45548 | 1995 | Delta Gold Ltd | Ida Fault | <1% | Ida Fault Project Combined Annual Report For the period 1st February 1994- 31 st January 1995 Tenements:E16/84 |
| A45846 | 1995 | Diablo Cliffs Nl | Dunns Eight Mile | <1% | Annual Report,Dunns Eight Mile Project, October 1994-October 1995 M16/171,P16/1261-1264,1268,P16/1329,1401,146 |
| A46123 | 1995 | Diablo Cliffs Nl | Dunns North | <1% | Dunns North Project, Annual Report P16/1637-1646, October 1995. |
| A44376 | 1995 | Coolgardie Gold Nl | Gorge Dam | <1% | Gorge Dam Project, Annual Report P16/1421-P16/1431 & P16/1751 & 1752 for the period 10/02/1994 to 09/02/1995. |
| A44698 | 1995 | Coolgardie Gold Nl | Slattery Dam | <1% | Partial Surrender Report for the period 28/05/95 Slattery Dam Project E16/76 |
| A46686 | 1995 | Delta Gold Ltd | Kangaroo Plains | <1% | Partial Surrender Report for the period 24/01/94-23/01/95 Kangaroo Plains Project E16/85 |
| A40923 | 1994 | Delta Gold Ltd | Ida Fault | <1% | (Annual Report for the Period 01/01/93 - 01/03/94) Report on exploration completed during 1993 on Ida Fault Pr |
| A42088 | 1994 | Coolgardie Gold Nl | Slattery Dam | <1% | Slattery Dam Project, Partial Surrender Report, May 1994, E16/76. |
| A42780 | 1994 | Diablo Cliffs Nl | Dunns North | <1% | Dunns North Project, Annual Report for the period 16/08/1993 to 15/08/1994, P16/1637-1646. |
| A40818 | 1994 | Coolgardie Gold Nl | Gorge Dam | <1% | Gorge Dam Project, Annual Report for the period 10/02/1993 to 09/02/1994, P16/1421-1431. |
| A41905 | 1994 | Zephyr Minerals Nl | Dunnesville | <1% | EL16/90 P16/1534-1535 Annual Report Dunnsville Project, Period Ending 23/07/1994 |
| A41999 | 1994 | Newcrest Mining Ltd | Breakaway Dam | <1% | Breakaway Dam Project Exploration Report on Leases M6/58, M16/106,M16/143,M16/150,M16/164, P16/1439, P6/1570-1 |
| A42049 | 1994 | Coolgardie Gold Nl | Slattery Dam | <1% | Annual report on E16/76, Slattery Dam, For the period 29/5/1993 to 28/5/1994 |
| A38347 | 1993 | Paragon Resources Ltd | Dunns Eight Mile | <1% | Annual Report, Dunns Eight Mile Project , for the period 13th May 1992 to 12th May 1993, M16/171; P19/1261-126 |
| A39717 | 1993 | Amalg Syndicate | Gormans Find -Kintore | 1% | Annual Report; P16/1536,1541,1542 Gormans Find - Kintore (10/92 - 10/93) |
| A39998 | 1993 | Newcrest Mining Ltd | Breakaway Dam | <1% | Breakaway Dam Project Exploration Report on Leases M16/58, M16/106, M16/143, M16/150, M16/164, P16/1439, P16/1 |
| A38352 | 1993 | Coolgardie Gold Nl | Gorge Dam | <1% | Gorge Dam Project, Annual Report for the period 10/02/1992 to 09/02/1993, P16/1421-1431. |
| A38625 | 1993 | Delta Gold Ltd | Kangaroo Plains | <1% | Annual Report for the period 24/01/92-23/01/93 Kangaroo Plains Project E16/85 |
| A38676 | 1993 | Coolgardie Gold Nl | Slattery Dam | <1% | Slattery Dam Project, Annual Report for the period 29/05/1992 to 28/05/1993, E16/76. |
| A39757 | 1993 | Yardarino Mining Nl | Dunnesville | <1% | Non-statutory Report: June 1993 Progress Report: Dunnsville Gold Project, E16/90 [Internal Report] |
| A36513 | 1992 | Coolgardie Gold Nl | Slattery Dam | <1% | Slattery Dam Project, Annual Report for the period 29/05/1991 to 28/05/1992, E16/76. |
| A37470 | 1992 | Newcrest Mining Ltd | Breakaway Dam | <1% | Annual report for the period 05/91 to 05/92 Breakaway Dam Project M16/58, M16/106, M16/143, M16/150, M16/164, |
| A32917 | 1991 | Poseidon Ltd | Little Crest Dam | <1% | Little Crest Dam Project Annual Report 1990 P16/657, P16/658, P16/1042, P16/1043 and M16/143 Poseidon Explorat |
| A31267 | 1990 | Poseidon Ltd | Little Crest Dam | <1% | Annual report 1989 Little Crest Dam project P16/538 to P16/539, P16/488 to P16/490, P16/492, P16/493, P16/1402 |
| A6607 | 1976 | Western Mining Corporation Ltd | Ora Banda- Kunanalling- Broad Arrow | <1% | Ora Banda- Kunanalling- Broad Arrow Project, Annual Report for the period 01/05/1973 to 29/06/1976, TR70/5012 |
| A4035 | 1973 | Barrier Exploration Nl | Dunnsville | <1% | Dunnsville Project, Non-statutory Report: New Project Report, January 1973, MC16/976-1035. |
| A2928 | 1972 | Western Mining Corporation Ltd | Kintore | <1% | Kintore Project, Annual Report for the period ending 30th June 1972, MC16/375-394. |
| A1916 | 1971 | Western Mining Corporation Ltd | Kintore | <1% | Kintore Project, Annual Report for the year ending 30th June 1971, MC16/375-387. |
| A27226 | 1753 | Aberfoyle Resources Ltd | Kintore | <1% | Kintore J.V. Progress report to 28/02/89 E16/08-09, M16/55-57, M16/68, M16/76 |
All 255 report numbers over this ground
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over L 16/58 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold L 16/58? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.