L 38/292
L 38/292 is a live miscellaneous licence in the Shire of Laverton, Western Australia, held by Gsm Mining Company Pty Ltd. Granted on 27 Sept 2018 for 21 years, it expires on 26 Sept 2039. The ground is covered by 116 historical WAMEX reports.
Register summary
- Holder
- Gsm Mining Company Pty Ltd
- Local government
- Shire of Laverton
- Application received
- 13 June 2017
- Commenced
- 27 Sept 2018
- Expiry
- 26 Sept 2039
- Term
- 21 Years
The full record on L 38/292
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares (no change of holder on record)
- The full record: 5 conditions and 12 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (7 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A134696 | 2023 | Magnetic Resources Nl | Hawks Nest | 8.2% | Partial Surrender Report, E38/3127 Hawks Nest, Western Australia, Reporting Period 16 February 2017 to 15 Feb |
| A135963 | 2023 | Sammy Resources Pty Ltd | Yabby | 66% | Final Surrender Report for E38/3425 - Yabby Project for the period ending 27/03/2023 |
| A130822 | 2022 | Sammy Bakie | Yabby | 66% | E38/3425 Annual Report Yabby Project for the period ending 27/03/2022. |
| A126493 | 2021 | Gswa | <1% | Core Library Sampling K1127 | |
| A124221 | 2020 | Focus Minerals (Laverton) Pty Limited; Focus Minerals Ltd | Central Laverton | <1% | Central Laverton C119/2014 Annual Technical Report for the period ending 28/02/2020 |
111 more reports
| A125553 | 2020 | Magnetic Resources Nl | Hawks Nest | 6.8% | Annual Report, C200/2017 Hawks Nest (E38/3127, E38/3100, E38/3205, E38/3209, M38/1041, P38/4201, P38/4317–4324 |
| A121910 | 2019 | Magnetic Resources Nl | Hawks Nest | 7.3% | Annual Report, C200/2017 Hawks Nest (E38/3127, E38/3100, E38/3205, E38/3209, P38/4201, P38/4317–4324), Western |
| A120411 | 2019 | Focus Minerals (Laverton) Pty Limited; Focus Minerals Ltd | Central Laverton | <1% | Central Laverton C119/2014 Annual Technical Report for the period 1 March 2018 to 28 February 2019 |
| A118435 | 2018 | Magnetic Resources Nl | Hawks Nest | 7.3% | Annual Report, C200/2017 Hawks Nest (E38/3127, E38/3100, E38/3205, E38/3209, P38/4201, P38/4317–4324), Western |
| A116824 | 2018 | Focus Minerals (Laverton) Pty Limited; Focus Minerals Ltd | Central Laverton | <1% | Central Laverton C119/2014 Annual Technical Report For the Period 1 March 2017 to 28 February 2018 |
| A112029 | 2017 | Poseidon Nickel Limited | Laverton West | 7.8% | Laverton West E38/1930 Surrender Report for the period 13/04/2007 to 11/05/2016 |
| A113931 | 2017 | Focus Minerals (Laverton) Pty Limited | Central Laverton | <1% | Combined Annual Report C119/2014 Central Laverton Project for the period 1 March 2016 to 28 February 2017, E38 |
| A108534 | 2016 | Poseidon Nickel Limited | Brown Well | 100% | Brown Well P38/3989 Final Surrender Report for the period 08/12/2012 to 08/02/2016 |
| A108535 | 2016 | Poseidon Nickel Limited | Brown Well | 32% | Brown Well P38/3990 - Final Surrender Report for the period 28/08/2012 to 08/02/2016 |
| A108204 | 2016 | Poseidon Nickel Limited | Laverton West | 8% | West Laverton (C85/2014) Annual Technical Report 01/01/2015 - 31/12/2015, E 38/01930, M 38/00372, M 38/00694, |
| A108536 | 2016 | Poseidon Nickel Limited | Brown Well | 100% | FINAL SURRENDER REPORT For the Period 28 August 2012 to 2 February 2016 BROWN WELL P38/3991 - Final Surrender |
| A108862 | 2016 | Focus Minerals (Laverton) Pty Limited | Central Laverton | <1% | Combined Annual Report C119_2014 Central Laverton Project for the period 1 March 2015 to 28 February 2016 |
| A104754 | 2015 | Poseidon Nickel Limited | Laverton West | 8% | C85/2014 LavertonWest Project - Annual Report for the period 1 January 2014 to 31 December 2014, E38/1930, M38 |
| A105958 | 2015 | Focus Minerals Ltd | Central Laverton | 1.8% | Combined Annual Report Central Laverton Project - C119/2014 Western Australia For the Period 1 March 2014 to 2 |
| A106942 | 2015 | Poseidon Nickel Limited | Brown Well | 100% | P38/3989 Brown Well Project Annual Report For the Period 27 August 2014 to 26 August 2015 |
| A106943 | 2015 | Poseidon Nickel Limited | Brown Well | 32% | P38/3990 - Annual Report Brown Well Project for the period 26 August 2014 to 25 August 2015 |
| A106944 | 2015 | Poseidon Nickel Limited | Brown Well | 100% | P38/3991 - Annual Report For the Period 26 August 2014 to 25 August 2015 BROWN WELL |
| A100898 | 2014 | Poseidon Nickel Limited | Brown Well | 100% | Brown Well Project, Annual Report for the period 27/08/2012 to 26/08/2013, P38/3991. |
| A101086 | 2014 | Poseidon Nickel Limited | Laverton West | 85% | Laverton West Project, Annual Report for the period 04/11/2012 to 03/11/2013, P38/3718. |
| A102352 | 2014 | Poseidon Nickel Limited | Laverton West | 7.8% | Laverton West Project E38/1930 for the period 13 April 2013 to 12 April 2014 |
| A100896 | 2014 | Poseidon Nickel Limited | Brown Well | 32% | Brown Well Project, Annual Report for the period 27/08/2012 to 26/08/2013, P38/3990. |
| A100897 | 2014 | Poseidon Nickel Limited | Brown Well | 100% | Brown Well Project, Annual Report for the period 27/08/2012 to 26/08/2013, P38/3989. |
| A101087 | 2014 | Poseidon Nickel Limited | Laverton West | 100% | Laverton West Project, Annual Report for the period 04/11/2012 to 03/11/2013, P38/3719. |
| A102282 | 2014 | Focus Minerals Ltd | Central Laverton | 4.7% | Central Laverton Project, C310/2011, Combined Annual Report, 01/03/2013 to 28/02/2014, E38/1349, E38/2203, M38 |
| A102944 | 2014 | Poseidon Nickel Ltd | Windarra | 69% | Windarra Project, Final Surrender Report for the period 14/09/2005 to 11/04/2014, E38/1752. |
| A104222 | 2014 | Poseidon Nickel Limited | East Laverton | 60% | East Laverton Project E38/2706 – Surrender Report for the period 25/10/2012 to 05/09/2014 |
| A104673 | 2014 | Poseidon Nickel Limited | Brown Well | 32% | P38/3990 Brown Well Project - Annual Report for the period 27 August 2013 to 26 August 2014 |
| A104674 | 2014 | Poseidon Nickel Limited | Brown Well | 100% | Brown Well Project P38/3991 Annual Report for the period 27 August 2013 to 26 August 2014 |
| A104675 | 2014 | Poseidon Nickel Limited | Brown Well | 100% | P38/3989 Brown Well Project Annual Report for the period 27 August 2013 to 26 August 2014 |
| A98404 | 2013 | Focus Minerals (Laverton) Pty Ltd | Central Laverton | 3.1% | Central Laverton Project, Annual Report for the period 01/03/2012 to 28/02/2013, E38/1349........E38/2321;M38/ |
| A99043 | 2013 | Poseidon Nickel Limited | Windarra | 11% | Windarra Nickel Project - Combined Annual Report For the Period 22 April 2012 to 21 April 2013, C79/2006, E38/ |
| A97205 | 2013 | Focus Minerals (Laverton) Pty Ltd; Panoramic Resources Ltd | West Laverton | 6.9% | West Laverton Project, Annual Report for the period 30/11/2011 to 29/11/2012, E38/1930; E39/1296; M38/46, 372, |
| A98016 | 2013 | Focus Minerals (Laverton) Pty Ltd | West Laverton | 7.8% | PARTIAL SURRENDER REPORT ON EXPLORATION FOR THE PERIOD 13 APRIL 2007 to 12 APRIL 2013 Tenement: E38/1930 [West |
| A92691 | 2012 | Crescent Gold Ltd | Central Laverton | <1% | Interim Combined Annual Report on Exploration for the period 01/03/2010 to 28/02/2011; Central Laverton Projec |
| A94461 | 2012 | Poseidon Nickel Limited | Windarra | 3.9% | Windarra Nickel Project - Combined Annual Report for the Period 22 April 2011 to 21 April 2012, C79/2006, E38/ |
| A92841 | 2012 | Crescent Gold Ltd; Magma Metals Ltd; Poseidon Nickel Ltd | West Laverton | 6.9% | West Laverton Project, Annual Report for the period 30/11/2010 to 29/11/2011, E38/1930; E39/1296; M38/46, 372, |
| A93988 | 2012 | Crescent Gold Ltd | Central Laverton | 3.1% | Combined Annual Report on Exploration for the period 01/03/2011 to 28/02/2012; Central Laverton Project; C310/ |
| A89806 | 2011 | Crescent Gold Ltd | West Laverton | 6.7% | Combined Annual Report on Exploration for the period 01/01/2010 to 31/12/2010; West Laverton Project; C5/2011 |
| A90143 | 2011 | Crescent Gold Ltd | Central Laverton | 3.1% | Combined Annual Report on Exploration for the period 01/01/2010 to 31/12/2010; Central Laverton Project; C6/20 |
| A91181 | 2011 | Poseidon Nickel Limited | Windarra | 3% | Windarra Nickel Project - Combined Annual Report for the Period 22 April 2010 to 21 April 2011, C79/2006, E38/ |
| A91345 | 2011 | Poseidon Nickel Limited | Weebo Well Intrusion | <1% | Weebo Well Intrusion - Co-Funded Government- Industry Drilling Program for the Period ending 30 June 2011 (R#2 |
| A91800 | 2011 | Triton Gold Ltd | Windarra | 32% | Annual report for the Windarra Regional Project 6 October 2010 to 5 October 2011, P38/3868 |
| A91289 | 2011 | Triton Gold Ltd | Windarra | 50% | Annual report for the Windarra Regional Project 6 August 2010 to 5 August 2011, E38/2347 |
| A91798 | 2011 | Triton Gold Ltd | Windarra | 100% | Annual report for the Windarra Regional Project 6 October 2010 to 5 October 2011, P38/3866 |
| A91799 | 2011 | Triton Gold Ltd | Windarra | 100% | Annual report for the Windarra Regional Project 6 October 2010 to 5 October 2011, P38/3867 |
| A85527 | 2010 | Poseidon Nickel Ltd | Windarra | 100% | Windarra Nickel Project C79/2006, P38-3273 - Surrender Report, Period: 14th September 2005 to 10th September 2 |
| A85528 | 2010 | Poseidon Nickel Ltd | Windarra | 32% | Windarra Nickel Project C79/2006, P38-3274 - Surrender Report, Period: 14th September 2005 to 10th September 2 |
| A85530 | 2010 | Poseidon Nickel Ltd | Windarra Nickel | 69% | Windarra Nickel Project C79/2006, E38-1752 - Partial Surrender Report, Period: 14th September 2005 to 10th Sep |
| A85526 | 2010 | Poseidon Nickel Ltd | Windarra | 100% | Windarra Nickel Project C79/2006, P38-3272 - Surrender Report, Period: 14th September 2005 to 10th September 2 |
| A86798 | 2010 | Barrick (Australia Pacific) Ltd | Laverton | 8.2% | Project 8871 Laverton Joint Venture Annual Report period 1 January 2009 – 31 December 2009, Technical Report N |
| A87137 | 2010 | Poseidon Nickel Limited | Windarra | 3% | Windarra Nickel Project - Combined Annual Report for the Period 22 April 2009 to 21 April 2010, CR# C79/2006, |
| A80997 | 2009 | Poseidon Nickel Limited | Windarra | 69% | Windarra Nickel Project C79/2006, E38-1752 - Partial Surrender Report, 14th September 2005 to 10th December 20 |
| A82038 | 2009 | Barrick Gold Of Australia Ltd | Laverton Exploration JV | 7.2% | LAVERTON EXPLORATION JOINT VENTURE ANNUAL, REPORT Period 1 January 2008 – 31 December 2008 TECHNICAL REPORT No |
| A82530 | 2009 | Poseidon Nickel Ltd | Windarra | 3.7% | Windarra Project - Combined Annual Report for the Period 22 April 2008 to 21 April 2009, C79/2006 |
| A78114 | 2008 | Barrick (Granny Smith) Pty Ltd | Laverton | 7.2% | PROJECT 8871, LAVERTON Project, (ALL TENEMENTS), ANNUAL REPORT, Period 1 January 2007 31 December 2007, TECH |
| A78633 | 2008 | Poseidon Nickel Ltd | Windarra | 3.7% | Windarra Nickel Project - Combined Annual Report for the period 22 April 2007 to 21 April 2008, CR79/2006 |
| A75073 | 2007 | Barrick Gold Of Australia Ltd | Laverton | 3.9% | Project 8871, Laverton Project, Annual Report, Period 1 January 2006 - 31 December 2006, Technical Report No.1 |
| A75957 | 2007 | Dynasty Metals Australia Ltd | Laverton | 2.7% | LAVERTON PROJECT COMBINED REPORT E38/1450/1586/1587/1622/ 1752, E39/929/930/1325/1326/3272-3274 Annual Technic |
| A72705 | 2006 | Barrick Gold Of Australia Ltd | Laverton | 7.3% | Laverton Exploration JV, Annual Exploration Report for the Period 1 January 2005 to 31 December 2005, Combined |
| A73096 | 2006 | Metex Resources Ltd | Laverton | 11% | Laverton Exploration Joint Venture, M38/45, M38/47, E38/556, E38/658, E38/837, Final Surrender Report & M38/46 |
| A69813 | 2005 | Metex Resources Ltd | Laverton | 7.3% | Annual report for the period 01/02/04 - 31/12/04 Laverton Exploration Project, C5/2002, E38/411, E38/556, E38/ |
| A68953 | 2004 | Metex Resources Ltd | Laverton | 7.4% | Laverton JV Project (C5/2002),Annual Report for the period 01/02/2003-31/12/2003 Laverton JV Project (C5/2002) |
| A69600 | 2004 | Metex Resources Ltd | Laverton | 73% | Laverton (JV) Project, Partial Surrender Report for the period 112/11/1984 to 10/11/2004, M38/45, M38/47 & M3 |
| A66477 | 2003 | Metex Resources Ltd | Laverton | 4.4% | 2002 Annual Report for period 01/02/02 to 31/12/02 Laverton Exploration Joint Venture C5/2002: E38/389, 406, 4 |
| A65027 | 2002 | Metex Resources Ltd | Laverton | 7.8% | Combined Annual Technical Report, Laverton Project, Lancefield Tenement Group (DME Ref: C382/1995) Laverton, W |
| A61886 | 2001 | Metex Resources Ltd | Hawk Nest North | <1% | Partial Surrender Report at 4 April 2000 E38/822. Laverton (SH51-02) 1:250,000, Laverton (3340) 1:100,000 map |
| A62445 | 2001 | Metex Resources Nl | Laverton | 7.7% | Combined Annual Technical Report Period 1 February 2000 To 31 January 2001. Laverton Project Lancefield Teneme |
| A63778 | 2001 | Metex Resources Ltd | Windarra South | 15% | Partial Surrender Report Windarra South Project Laverton, Western Australia, exploration lease E38/658. |
| A63779 | 2001 | Metex Resources Ltd | Danny Bore | <1% | Partial Surrender Report Danny Bore Project Laverton, Western Australia exploration lease E38/822. |
| A62582 | 2001 | Metex Resources Ltd | Sunshine | 4.3% | Annual Report for the period 2nd May 2000 to 1st May 2001, Sunshine Project, E38/851. |
| A60004 | 2000 | Metex Resources Nl | Sunshine | 4.3% | Annual Report for the period 02/05/1998 to 01/05/1999, Sunshine Project, Exploration Licence 38/851 |
| A60731 | 2000 | Metex Resources Nl | Laverton/Lancefield | 8% | Combined Annual Technical Report Period 01/02/1999 to 31/01/2000 Laverton Project, Lancefield Tenement Group E |
| A57921 | 1999 | Metex Resources Nl | Laverton | 7.6% | Laverton Project, Laverton Exploration J.V. Beasley Creek Oxide J.V. 01/02/1998 - 31/01/1999 E38/658, 822 |
| A53305 | 1998 | Wmc Resources Ltd | Windarra | <1% | Windarra Nickel Project, Annual Mineral Exploration Report for the period 01/01/97-31/12/97 Mining Leases 38/ |
| A54448 | 1998 | Metex Resources Nl | Windarra South | 8.6% | Annual Report for the period 01/02/97-31/01/98, Windarra South Project, E38/658 E38/837. |
| A54899 | 1998 | Metex Resources Nl | Laverton | 11% | Laverton Project - Lancefield Tenement Group E38/365, 822, 835, M38/37, 38, 39, 40, 45 etc. 01/02/97 - 31/12/9 |
| A55648 | 1998 | Metex Resources Nl | Sunshine | 4.3% | Annual Technical Report for the period 2nd May 1997 to 1st May 1998 W123-Sunshine Project, Exploration Licence |
| A50200 | 1997 | Wmc Resources Ltd | Windarra | <1% | Windarra Nickel Project Annual Mineral Exploration Report for the period 1 January 1996 to 31 December 1996 Mi |
| A50315 | 1997 | Metex Resources Nl | Danny Bore | <1% | Interim Technical Report W112 Danny Bore Project Exploraiton Licence E38/822 for the period 10 April 1996 to 3 |
| A50424 | 1997 | Aarex Goldfields Nl | Mount Ajax | 5.4% | Interim Report Mt Ajax Project - Laverton Western Australia Tenement E38/835 (March 1997) |
| A51243 | 1997 | Metex Resources Nl | Lancefield | 3.5% | Annual Technical Report Period 1 Febuary 1996 to 31 January 1997 Laverton Develpment Project Lancefield Teneme |
| A51279 | 1997 | Crest Resources Australia Nl | Hawk Nest North | 15% | Hawk Nest North Gold Exploration Project Eastern Goldfields of Western Australia E38/658 Annual Exploration Pr |
| A52324 | 1997 | Metex Resources Nl | Sunshine | 4.3% | Sunshine Project , Annual Report for the period 02/05/1996 to 01/05/1997, E38/851. |
| A53238 | 1997 | Aarex Resources Nl | Red Flag | 5.4% | Red Flag Prospect - E38/835 Annual Report, 30/05/1996 - 29/05/1997 |
| A46930 | 1996 | Crest Resources Australia Nl | Hawk Nest North | 15% | Hawk Nest North Gold Exploration Project Eastern Goldfields of Western Australia E38/658 Annual Exploration Pr |
| A47424 | 1996 | Western Mining Corporation Ltd | Windarra | <1% | Windarra Nickel Project Annual Mineral Exploration Report for the period 1 January 1995 to 31 December 1995 Mi |
| A48547 | 1996 | Metex Resources Nl | Lancefield | 23% | Annual Technical Report Period 1 Febuary 1995 to 31 January 1996 Laverton Development Project Lancefield Tenem |
| A43141 | 1995 | Western Mining Corporation Ltd | Eight Mile Bore | 42% | Technical Report for Eight Mile Bore E38/365 for the period 22/11/92 to 21/11/94 Windarra Nickel Project |
| A43233 | 1995 | Western Mining Corporation Ltd | Windarra | 15% | Technical Report Windarra Leases for the period 01/07/93 to 31/12/94 (AML70/261, M38/38 to M38/43, M38/45 to M |
| A46413 | 1995 | Western Reefs Ltd | Nicholsons Bore | 13% | Nicholsons Bore Project, 1995 Surrender Report E38/451, E38/642 & P38/2340 for the period 31st May 1994 to 1st |
| A41131 | 1994 | Western Mining Corporation Ltd | Eight Mile Bore | 42% | Eight Mile Bore Project, Partial Surrender Report for the period 22/11/1990 to 21/11/1993, E38/365. |
| A42722 | 1994 | Western Mining Corporation Ltd | Eilght Mile Bore | 42% | Eilght Mile Bore Project, Partial Surrender Report for the period 22/11/1990 to 21/11/1994, E38/365. |
| A43145 | 1994 | Western Mining Corporation Ltd | Windarra | 27% | Technical Report Windarra Leases for the period 01/07/92 to 30/06/93 Windarra Nickel Project (M38/38 to M38/43 |
| A38501 | 1993 | Western Mining Corporation Ltd | Windarra | 18% | Annual Report for the Period 01/07/91 - 30/06/92 Windarra Project 18042005sn s/c |
| A35126 | 1992 | Western Mining Corporation Ltd | Mount Windarra | 26% | Mount Windarra Project, Annual Report for the period 01/07/1989 to 30/06/1991, SA261;M38/38-43, 45-49, 52-53, |
| A31396 | 1989 | Western Mining Corporation Ltd | Windarra | 26% | Technical Report; Windarra Leases For The Period 1 July 1988 to 30 June 1989. (Annual Report M38/38 to 43, M38 |
| A22647 | 1988 | Western Mining Corporation Ltd | Windarra | 28% | Annual Report, Windara Mining Leases, SA261,M38/38, M38/39, M38/40, M38/41, M38/42, M38/43, M38/45, M38/46, M3 |
| A26696 | 1988 | Western Mining Corporation Ltd | Windarra | 28% | Windarra Mining leases SA261, M38/38-43, 45-49, 52-53, 60. M39/25 1/7/87 to 30/6/88 Windarra Nickel Project 1 |
| A17424 | 1986 | Hillmin Gold Mines Pty Ltd | South Laverton | <1% | Annual Technical Report South Laverton Gold Mining Leases GML38/2747 GML38/2817 and GML38/2818 Prospecting Lic |
| A19838 | 1986 | Western Mining Corporation Ltd | Windarra | 30% | Annual report Windarra Nickel Project Mining Leases SA261 M38/33 M38/34 M38/38 to M38/43 M38/45 to M38/49 M38/ |
| A17197 | 1985 | Western Mining Corporation Ltd | Mount Windarra | 28% | Mount Windarra Project, Annual Report for the period 20th June 1984 to 18th June 1985, ML38/27-29; M38/33-34, |
| A7305 | 1977 | Western Mining Corporation Ltd | Windarra | 51% | Windarra Project, Annual Report for the year ending 28th June 1977, MC39/4483-4485 & 4473-4475; MC38/739-745,1 |
| A5659 | 1975 | Asarco Australia Ltd | Thompson Well | 18% | Final report [non-statutory], Thompson Well Mineral Claims, March 1975, MC38/6631-6642 ... 38/6933 |
| A5041 | 1974 | Windarra Nickel Mines Pty Ltd | Mount Windarra - Brown Well | 60% | Mount Windarra - Brown Well, MC38/1665 - 1667, 38/1695-1696, Progress report [non-statutory] to 30th June 1973 |
| A5300 | 1974 | Utah Development Co Ltd | Mount Ajax | 4.5% | Mount Ajax nickel claims, Final report [non-statutory], MC38/692-693 ... 38/6676 |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A2767 | 1972 | Conwest Australia Nl | Windarra South | 50% | Windarra South Project, Non-statutory Report: Brief Exploration Report, July 1972, MC38/747-760, 1328-1329, 14 |
| A3955 | 1972 | Carpentaria Exp Co Pty Ltd | Denny Bore | 74% | Denny Bore Project, Non-statutory Report: Final Report, November 1972, MC38/621-627. |
| A3075 | 1971 | Scamander Mining Corp Nl | Garden Well | 15% | Garden Well Project, Non-statutory Report: Progress Report(s) on Investigations,for the period ending 31st Dec |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A37629 | 1753 | Western Mining Corporation Ltd | Eight Mile Bore | 42% | Annual Technical Report Eight Mile Bore E38/365 for the period 22/11/91-21/11/92 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over L 38/292 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold L 38/292? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.