L 39/257
L 39/257 is a live miscellaneous licence in the Shire of Leonora, Western Australia, held by Anglogold Ashanti Australia Limited (part of AngloGold Ashanti). Granted on 12 Apr 2018 for 21 years, it expires on 11 Apr 2039. The ground is covered by 100 historical WAMEX reports.
Register summary
- Holder
- Anglogold Ashanti Australia Limited
- Part of
- AngloGold Ashanti
- Local government
- Shire of Leonora
- Application received
- 16 May 2017
- Commenced
- 12 Apr 2018
- Expiry
- 11 Apr 2039
- Term
- 21 Years
The full record on L 39/257
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares (no change of holder on record)
- The full record: 19 conditions and 11 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (8 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A137621 | 2023 | Anglogold Ashanti Australia Limited | Otway Project (E39/1973) | <1% | Otway Project (E39/1973) 40% Partial Surrender Tenement Relinquishment Report to the Department of Mines, Indu |
| A130798 | 2022 | Matsa Gold Pty Ltd | Lake Carey | <1% | E39/1889 Partial Surrender Report Lake Carey for the period ending 07/03/2022. |
| A128926 | 2021 | Anglogold Ashanti Australia Limited | Otway | 2.5% | Otway Project C145/2018 Final Surrender Report to the Department of Mines, Industry Regulation and Safety for |
| A122827 | 2020 | Matsa Resources Limited | Red October | <1% | Red October Group Annual Report C173/2017 for the period ending 31/12/2019 |
| A122817 | 2020 | Anglogold Ashanti Australia Limited | Otway | <1% | Otway (C145/2018) Annual Group Report for the period ending 31/12/2019 |
95 more reports
| A122816 | 2020 | Anglogold Ashanti Australia Limited | Butcher Well | <1% | Butcher Well (C8/2016) Annual Group Report for the period ending 31/12/2019 |
| A119199 | 2019 | Anglogold Ashanti Australia Limited | Butcher Well | <1% | Butcher Well (C8/2016) Annual Report for the period 1 January 2018 to 31 December 2018 |
| A119201 | 2019 | Anglogold Ashanti Australia Limited | Otway | <1% | Otway Group (C145/2018) Annual Report for the period 1 January 2018 to 31 December 2018 |
| A119510 | 2019 | Matsa Resources Limited | Red October | <1% | Annual Report on Exploration Carried out over Red October Project (C173/2017) for period to 1st March 2019 |
| A115990 | 2018 | Saracen Gold Mines Pty Limited | Red October | 2.3% | Red October Project (C173/2017) Annual Report for the Period 1 January to 31 December 2017, M 39/00411, M39/00 |
| A115940 | 2018 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3 |
| A115966 | 2018 | Anglogold Ashanti Australia Limited | Butcher Well | <1% | Butcher Well (C8/2016) Group Report to the Department of Mines, Industry Regulation and Safety For the Period |
| A116266 | 2018 | Matsa Gold Pty Ltd | Lake Carey | <1% | Lake Carey Project C5/2003 Annual Report for the period 01/01/2017 - 31/12/2017 |
| A112356 | 2017 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project (C8/2016) – Volume II Annual Report for the Period 1 January to 31 December 2016, E39/014 |
| A112079 | 2017 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016 |
| A112275 | 2017 | Matsa Resources Limited | Lake Carey | <1% | Lake Carey Project C05/2003 Annual Report for the period 1 January 2015 to 31 December 2016, E39/01287.....E39 |
| A112355 | 2017 | Saracen Gold Mines Pty Ltd; Anglogold Ashanti Australia Limi | Butcher Well | <1% | Butcher Well Project (C8/2016) – Volume I Annual Report for the Period 1 January to 31 December 2016, E38/0312 |
| A108112 | 2016 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/ |
| A108161 | 2016 | Saracen Gold Mines Pty Ltd | Butcher Well - Mount Minnie- Mount Flore | 1.1% | VOL 1 - Butcher Well Project (C345/1993) Annual Report for the Period 1 January 2015 to the 31 December 2015, |
| A108911 | 2016 | Saracen Mineral Holdings Limited | Butcher Well | <1% | BUTCHER WELL Exploration License 39/1489 Partial Surrender Report for the Period 25 March 2010 to 24 March 201 |
| A108266 | 2016 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mount Howe Project (C222/2007) Annual Report for the Period 1 January 2015 to the 31 December 2015, E31/949, E |
| A108808 | 2016 | Fortitude Gold Pty Ltd | Lake Carey | <1% | LAKE CAREY PROJECT Annual Report To The WA Department of Mines & Petroleum For The Period 1st January 2015 to |
| A110583 | 2016 | Saracen Gold Mines Pty Ltd | Red October | 5.4% | Red October Deeps Co-funded Drilling – Final Report (Round 13) |
| A104898 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group | <1% | Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3 |
| A105466 | 2015 | Saracen Gold Mines Pty Ltd | Butcher Well | 1% | Butcher Well Project C345/1993 Annual Report for the period 01/01/2014 - 31/12/2015, E38/2306.....P39/5063 |
| A105191 | 2015 | Fortitude Gold Pty Ltd | Lake Carey | 1.1% | Annual Technical and Geological Report for Department of Mines and Petroleum in relation to the Lake Carey Pro |
| A105467 | 2015 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mt Howe Project C222/2007 Annual Report for the period 01/01/2014 - 31/12/2014, E31/926-I......P39/4977-I |
| A107185 | 2015 | Anglogold Ashanti Australia Ltd | Jefferies | 2.5% | SUNRISE DAM GROUP SURRENDER REPORT FOR E39/1490 FOR THE PERIOD 04/10/2010 to 15/09/2015 |
| A101216 | 2014 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201 |
| A101784 | 2014 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | Mt Howe Project C222/2007 Annual Report for the period 01/01/2013 to 31/12/2013, E31/926 I......P39/5036-I |
| A101830 | 2014 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 01 January 2013 to 31 December 2013, E38/2306, E39 |
| A104282 | 2014 | Gianni, Pr | Wilga Well | <1% | Wilga Well Project, Annual Report for the period 10/10/2013 to 09/10/2014, E39/1664. |
| A104813 | 2014 | Gianni, Pr | Wilga Well | <1% | Wilga Well Annual Exploration Report for E39/1664 from 10/10/2013 to 9/10/2014 |
| A97466 | 2013 | Saracen Gold Mines Pty Ltd | Mount Howe | <1% | MT HOWE PROJECT ANNUAL REPORT 01 JANUARY 2012 TO 31 DECEMBER 2012 CR GROUP: C222/2007. |
| A96848 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995) |
| A97624 | 2013 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279; |
| A100810 | 2013 | Gianni, Pr | Wilga Well | <1% | Wilga Well Project, Annual Report for the period 10/10/2012 to 09/10/2013, E39/1664. |
| A93583 | 2012 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 1 January 2011 to 31 December 2011 |
| A92885 | 2012 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995). |
| A93045 | 2012 | Rubicon Resources Ltd | Mount Howe | <1% | Mt Howe Project Combined Report C222/2007, Annual Report, 1st January 2011 – 31 December 2011 |
| A89346 | 2011 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010 |
| A89855 | 2011 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project Annual Report for the period 01 January 2010 to December 2010 |
| A89379 | 2011 | Rubicon Resources Ltd | Mount Howe | <1% | Mt Howe Project Combined Report C222/2007 2010, 1st January 2010 – 31 December 2010 |
| A86442 | 2010 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2009 TO 31 DECEMBER 2009 (C345/1993) |
| A78034 | 2008 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2007 TO 31 DECEMBER 2007 CR GROUP: C345/1993 TENEMENTS: E38/1678 |
| A75083 | 2007 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher'S Well Project, Annual Report, 01 January 2006 to 31 December 2006. (C345/1993) |
| A73957 | 2006 | Metex Resources Ltd | Linden | 1.4% | Linden Project Area E39/1050 & P39/4300, Final Surrender Report for the Period 01/07/2005 to 23/05/2006, Combi |
| A69663 | 2005 | Sons Of Gwalia Ltd | Butcher Well | <1% | Annual report for the period 01/01/04 - 31/12/04 Butcher Well Project, C345/1993, P38/3083, P39/3939, E38/449 |
| A68195 | 2004 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 01/01/2003 to 31/12/2003 : P38/3083, E39/173, E39/325, E39 |
| A65868 | 2003 | Sons Of Gwalia Ltd | Wilga Well | <1% | Annual Report for the period 25/11/01-24/11/02 Wilga Well Tenement: E39/327 Report No: 0450-2003-01 |
| A66522 | 2003 | Sons Of Gwalia Ltd | Mount Minnie | <1% | Annual Report for the period 17 August 2001 - 16 August 2002 Mount Minnie Project C88/2002: E39/173, M39/231 R |
| A66524 | 2003 | Sons Of Gwalia Ltd | Butcher Well | <1% | Annual Report for the period 1 January 2002 - 31 December 2002 Butcher Well C345/1993: E39/325, 328, 344, 423, |
| A67011 | 2003 | Sons Of Gwalia Ltd | Camelback / Butcher Well South | 1.8% | Butcher Well South Project, Surrender Report for the period 9 February 2001 to 19 May2003 C345/1993: M39/605, |
| A67298 | 2003 | Sons Of Gwalia Ltd | Mount Minnie | <1% | Annual Report for the period 17 August 2002 - 16 August 2003 Mount Minnie Project C88/2002: E39/173 M39/231 Re |
| A67381 | 2003 | Sons Of Gwalia Ltd | Mount Minnie | 2.7% | Surrender Report for the period 17 August 1990 to 7 August 2003 Mount Minnie Project C88/2002: M39/231 |
| A64070 | 2002 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 1st January 2001 to 31st December 2001, E39/325, 328, 344, |
| A61788 | 2001 | Sons Of Gwalia Ltd | Wilga Well | <1% | Wilga Well Annual Report for the period 25/11/99-24/11/00 tenement E39/327. |
| A63759 | 2001 | Sons Of Gwalia Ltd | Wilga Well | <1% | Wilga Well Annual Report for the period 25/11/00 - 24/11/01 tenement: E39/327. Report No: 0450-14. |
| A62854 | 2001 | Sons Of Gwalia Ltd | Camelback / Butcher Well / Linden | <1% | Butcher Well Annual Report For The Period 1 January 2000 - 31 December 2000. Tenements E39/173, E39/325, E39/3 |
| A61790 | 2000 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Annual Report for the Period 01/01/1999 to 31/12/1999. E39/173,325,328,344,384,423,475,532, M39/1 |
| A60643 | 2000 | Sons Of Gwalia Ltd | Wilga Well | <1% | Wilga Well, Annual Report for the Period 25/11/98 to 24/11/1999, E39/327. |
| A58497 | 1999 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well JV - 01/01/98 - 31/12/98 M39/118-120, 165-166, 230-232 E39/173, 281, 325, 328, 344, 384, 423, 475 |
| A57542 | 1999 | Sons Of Gwalia Ltd | Wilga Well | <1% | Wilga Well - Annual Report For the Period 25/11/97-24/11/98 E29/327 |
| A54584 | 1998 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well Project Combined Annual Technical Report For period 01/01/97-31/12/97 Ref:C345/93 Tenements E39/1 |
| A55979 | 1998 | Sons Of Gwalia Ltd | Butcher Well South | <1% | Butcher Well South, Partial Surrender Report, E39/423, 09/02/94 - 02/04/98 |
| A50043 | 1997 | Sons Of Gwalia Ltd | Wilga Well | <1% | Wilga Well Joint Venture Annual report for the year ending 24th November 1996 Tenement E39/327 |
| A50531 | 1997 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project Combined Annual Technical Report for period 1st January 1996 to 31st December 1996 Teneme |
| A51151 | 1997 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well Project Annual Report for period 9 February 1996 to 8 February 1997, E39/423 |
| A46873 | 1996 | Gasgoyne Gold Mines Nl | Wilga Well | <1% | Wilga Well E39/327 Annual report for the year to 24 November 1995 |
| A47727 | 1996 | Sons Of Gwalia Ltd | Camelback-Butcher Well | <1% | Butcher Well Gold Project Combined Annual Technical Report for period 1st January 1995 to 31st December 1995 R |
| A48030 | 1996 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well Project, Annual Report for period 9 February 1995 to 8 February 1996, E39/423. |
| A43925 | 1995 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well Project, Combined Annual Report E39/173, 281, 323, 325, 328 & 344, M39/118-120, 165-166, 230-232 |
| A43703 | 1995 | Gasgoyne Gold Mines Nl | Wilga Well | <1% | Wilga Well project. Wilga Well- E39/327 Annual report for year to 24th November 1994 |
| A46388 | 1995 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well Project, Annual Report for period 9 February 1994 to 8 February 1995, E39/423. |
| A40601 | 1994 | Mount Burgess Mining Nl | Camelback, Butcher Well, Linden | <1% | Butcher Well Project, Annual report for period 1 January 1993 to 31 December 1993, C345/93 |
| A40536 | 1993 | Gasgoyne Gold Mines Nl | Wilga Well | <1% | Annual report for the period 25/11/92-24/11/93 Wilga Well Project E39/327 |
| A37888 | 1993 | Mount Burgess Mining Nl | Butcher Well | <1% | Annual Report for the Period 16/12/91 - 15/12/92 Butcher Well/Enigmatic/Hronsky Project M39/165-166 |
| A37329 | 1992 | Mim Exploration Pty Ltd | Butcher Well | <1% | Annual Report for the period 15/02/91 to 15/02/93 Butcher Well Project M39/165 M39/166 MIM Exploration Pty Ltd |
| A37704 | 1992 | Gasgoyne Gold Mines Nl | Wilga Well | <1% | Annual report for the period ending November 1992 Wilga Well Project E39/327 |
| A32493 | 1991 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well JV Project. Annual Technical Report for period 16/12/89-15/12/90. M39/165-166 |
| A29849 | 1990 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well Project, Annual Report for period 16th December 1988 to 15th December 1989, M39/165 & 166. |
| A28627 | 1989 | Billiton Australia Pty Ltd | Tin Dog North | <1% | 1988 Annual report E39/72 P39/1131 - Tin Dog North Report No: 08.4493 |
| A29300 | 1989 | Billiton Australia Pty Ltd | Tin Dog North | 1.7% | Tin Dog North. Partial surrender report. E39/72. Final report M29/167-168 |
| A9551 | 1980 | Swan Resources Ltd | Camel Back Range | <1% | Camel Back Range Project, Annual Report for the period ending 22/11/1980, TR70/7218H. |
| A3932 | 1973 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Final Report for the period 1st July 1972 to 30th June 1973, TR70/37 |
| A2782 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1971, TR70/3730 & 5279H. |
| A2829 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1972, TR70/3730H. |
| A3618 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Miscellaneous Maps (1-20), for the period ending 31/12/1972, TR70/3 |
| A941 | 1971 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1970, TR70/3730H & 5279H. |
| A271 | 1970 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1969, TR70/3730H. |
| A1121 | 1969 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report:;Volume 1: Report on the Induced Polarization & Resistivity Survey on |
| A1122 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Appendix 2:Annual Report, June 30th 1969, TR70/3730H; Report on the |
| A1123 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Annual Report for the period ending 30th June 1969, TR70/3730H. A Re |
| A270 | 1968 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Report on the Induced Polarisation & Resistivity Survey on the Deep |
| A269 | 1968 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the year ending 30th June 1968, TR70/3730H. |
| A268 | 1967 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the year ending 30th June 1967, TR70/3730H. |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A81890 | 1753 | Saracen Gold Mines Pty Ltd | BUTCHER WELL | <1% | BUTCHER WELL PROJECT (C345/1993), ANNUAL REPORT – 01 JANUARY 2008 TO 31 DECEMBER 2008, E38/1678, E39/173, E39/ |
| A94604 | 1753 | Saracen Gold Mines Pty Ltd | Lake Carey | 2.1% | Lake Carey Project. Royalties for Regions - Exploration Incentive Scheme. Report for the period 01/02/2011 to |
| A92248 | 1753 | Saracen Gold Mines Pty Ltd | WILGA WELL | <1% | WILGA WELL E39/1304 SURRENDER REPORT, 11 AUGUST 2008 TO 14 OCTOBER 2011 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over L 39/257 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold L 39/257? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.