L 39/275
L 39/275 is a live miscellaneous licence in the Shire of Laverton, Western Australia, held by Anglogold Ashanti Australia Limited (part of AngloGold Ashanti). Granted on 25 Oct 2018 for 21 years, it expires on 24 Oct 2039. The ground is covered by 80 historical WAMEX reports.
Register summary
- Holder
- Anglogold Ashanti Australia Limited
- Part of
- AngloGold Ashanti
- Local government
- Shire of Laverton
- Application received
- 18 May 2018
- Commenced
- 25 Oct 2018
- Expiry
- 24 Oct 2039
- Term
- 21 Years
The full record on L 39/275
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares (no change of holder on record)
- The full record: 38 conditions and 11 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (6 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A125157 | 2020 | Anglogold Ashanti Australia Limited | Western Ramps | <1% | EIS Round 20 - Western Ramps (Final Report) |
| A122815 | 2020 | Anglogold Ashanti Australia Limited | Sunrise Dam | 1.5% | Sunrise Dam (C144/1995) Annual Report to the Department of Mines, Industry Regulation and Safety for the perio |
| A122827 | 2020 | Matsa Resources Limited | Red October | <1% | Red October Group Annual Report C173/2017 for the period ending 31/12/2019 |
| A124126 | 2020 | Anglogold Ashanti Australia Limited | Pink Lady | <1% | CO-FUNDED EIS REPORT, EIS Round 19 – Pink Lady, Sunrise Dam Gold Mine |
| A119211 | 2019 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | 1.5% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum for the Period 1 January 2018 to 3 |
75 more reports
| A119510 | 2019 | Matsa Resources Limited | Red October | <1% | Annual Report on Exploration Carried out over Red October Project (C173/2017) for period to 1st March 2019 |
| A120368 | 2019 | Anglogold Ashanti Australia Limited | Southern Shear - Sunrise Dam | <1% | EIS Southern Shear Zones – SDGM project (R#17) |
| A115940 | 2018 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3 |
| A116266 | 2018 | Matsa Gold Pty Ltd | Lake Carey | <1% | Lake Carey Project C5/2003 Annual Report for the period 01/01/2017 - 31/12/2017 |
| A112079 | 2017 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016 |
| A112519 | 2017 | Legendre B | WILGA DAM | 2.6% | Wilga Dam E39/01796 Annual Report for the period 23 February 2016 to 22 February 2017 |
| A108576 | 2016 | Legendre B | Wilga Dam | 2.6% | Annual Report For the period 23 February 2015 to 22 February 2016 Wilga Dam Project E39/1796 |
| A108112 | 2016 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/ |
| A104898 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group | <1% | Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3 |
| A101216 | 2014 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201 |
| A96848 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995) |
| A100055 | 2013 | Focus Minerals (Laverton) Pty Ltd | Sunrise | 1.5% | Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545 |
| A92690 | 2012 | Crescent Gold Ltd | Sunrise | 9.4% | Interim Combined Annual Report on Exploration for the period 01/09/2010 to 31/08/2011; Sunrise Project; C320/2 |
| A92885 | 2012 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995). |
| A96196 | 2012 | Focus Minerals (Laverton) Pty Ltd | Sunrise | 1.5% | Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797 |
| A90051 | 2011 | Crescent Gold Ltd | Wilga Dam | 7.8% | Combined Annual Report on Exploration for the period 01/01/2010 to 31/12/2010; Wilga Dam Project; C118/2009 |
| A89346 | 2011 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010 |
| A86622 | 2010 | Barrick (Australia Pacific) Ltd | Wilga Dam | 7.8% | Wilga Dam Project P39/4797, M39/664, M39/742, M39/743, M39/862, M39/904, M39/951, Annual Report Period 1 Janua |
| A81076 | 2009 | Anglogold Ashanti Australia Ltd | SUNRISE DAM GROUP | <1% | SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A77574 | 2008 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07 |
| A74516 | 2007 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31 |
| A72814 | 2006 | Barrick (Granny Smith) Pty Ltd | Wilga Dam | 9.4% | Wilga Dam Project E39/786, Annual Exploration Report for the Period 1 July 2005 to 30 June 2006, C314/1995, ( |
| A70338 | 2005 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M |
| A70691 | 2005 | Placer Dome Asia Pacific Ltd | Sunrise - Sunset | 2.7% | Sunrise - Sunset Project, Annual Report for the period 1st January 2004 to 31st December 2004, P39/3076, P39/3 |
| A71360 | 2005 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 6.4% | Wilga Dam Project, E39/347 & E39/786, Mount Margaret Mineral Field Western Australia, Annual Exploration Repor |
| A68170 | 2004 | Anglogold Australasia Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/2003-31/12/2003, Sunrise Dam Project (C144/1995), M38/426, M38//427, M39/21 |
| A68435 | 2004 | Placer Dome Asia Pacific Ltd | Sunrise/Sunset | 2.7% | Sunrise/Sunset Project, P39/3076, P39/3090, P39/3091, P39/3238, P39/3294, P39/3240. Mount Margaret Mineral Fii |
| A69923 | 2004 | Placer Dome Asia Pacific Ltd | Wilga Dam | 6.4% | Wilga Dam Project, Annual exploration report for the period 1st July 2003 to 30th June 2004 X32, C314/1995, E3 |
| A71952 | 2004 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t |
| A66170 | 2003 | Placer (Granny Smith) Pty Ltd | Sunrise-Sunset | 1.6% | Annual Report on Exploration period ending 30th September 2002 Sunrise-Sunset Project C185/1995: M39/217, P39/ |
| A66542 | 2003 | Anglogold Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project, , Annual Report for the period 1 January 2002 to 31 December 2002, M39/347-48, 357, 366, |
| A66976 | 2003 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 9.4% | Wilga Dam Project, E39/786, Mount Margaret Mineral Field,Western Australia, Partial Surrender Report for the |
| A67211 | 2003 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 6.4% | Wilga Dam Project, E39/347,786, Mount Margaret Mineral Field, Western Australia Annual Exploration Report for |
| A64321 | 2002 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | 1.6% | Annual Report on exploration Sunrise-Sunset Project M39/217, P39/3076, 3090-3091, 3119, 3238, 3240, 3294 for t |
| A64488 | 2002 | Anglogold Australia Ltd | Sunrise Dam | <1% | Annual Report For The Period 1 January 2001 to 31 December 2001. Report No: WA 12052. Combined Report No: C144 |
| A65544 | 2002 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 6.4% | Project E39/347, E39/786 Annual Report On Exploration For The Period 1st July 2001 To 30th June 2002 Group Rep |
| A65956 | 2002 | Placer (Granny Smith) Pty Ltd | Sunset | <1% | Final Surrender Report on exploration for the period 11/8/93 through to 27/11/02 Sunset Lease P39/3119 |
| A62104 | 2001 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | 1.6% | Annual Report on exploration Sunrise/Sunset Project M39/217, P39/3075, 3090-3091, 3119, 3238, 3240, 3294 for t |
| A62718 | 2001 | Anglogold Australasia Ltd | Pippin | 2.6% | Pippin Project P39/2985 & P39/2986 Annual Report For The Period 12 May 2000 to 11 May 2001. Report No: 08.1157 |
| A63421 | 2001 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 6.4% | Wilga Dam Project Mount Margaret Mineral Field Western Australia Annual Report On Exploration For The Period 1 |
| A59851 | 2000 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | 1.6% | Annual Report On Exploration Sunrise-Sunset Project M39/217, P39/3076,3090-3091,3119 For The Period 01/01/1999 |
| A60321 | 2000 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project, M39/347-348,357,366,373-376, M38/426, Annual Report for the Period 1/1/1999 to 31/12/1999 |
| A61260 | 2000 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 6.4% | Wilga Dam E39/347 Annual Report on Exploration for the Period 1 July 1999 to 30 June 2000. C314/1995 Grid Ref: |
| A61954 | 2000 | Anglogold Australasia Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, M39/348, M39/357, M39/366, M39/373, M39/375, M39/376, M39/426 & M39/374 Verificat |
| A58027 | 1999 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | 1.6% | Sunrise - Sunset Project, Annual Report for the period 1st Janaury 1998 to 31st December 1998, M39/217; P39/ |
| A59071 | 1999 | Exodus Minerals Ltd | Wilga Dam | 6.4% | Annual report Wilga Dam Exploration Licence 39/347 Prospecting Licences 39/2985 &39/2986 for the period 01/07/ |
| A53829 | 1998 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, 348, 357, 366, 373-376, M38/426 Annual Report - Period Ending: 31/12/1997 |
| A54452 | 1998 | Placer (Granny Smith) Pty Ltd | Sunset | 1.6% | Sunrise/Sunset Project, Mt Margaret Goldfield, W.A. 01/01/97 - 31/12/97 M39/217, P39/3076, 3090-3091, 3119, 32 |
| A56033 | 1998 | Exodus Minerals Ltd | Wilga Dam | 6.4% | Annual Report - Wilga Dam Exploration Licence:39/347, Prospecting Licence:39/2985-2986 01/07/97 - 30/06/98 |
| A57146 | 1998 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, 348, 366, 372, 374, 375, 376, M38/426 Annual Report for the period ending 31/12/9 |
| A50393 | 1997 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347 M39/348 M39/357 M39/366 M39/373` M39/374 M39/375 M39/376 and M38/426 annual report |
| A50913 | 1997 | Placer (Granny Smith) Pty Ltd | Sunset | 1.6% | Annual report on Exploration Sunrise/ Sunset Project M39/217 P39/3076 P39/3090 to P39/3091 P39/3119 P39/3238 P |
| A52374 | 1997 | Wmc Resources Ltd | Wilga Dam | 6.4% | Annual Report 01/07/96-30/06/97 Wilga Dam E39/347 P39/2985 P39/2986 P39/3396 (Edjudina SH51-6 1:250 000) |
| A47061 | 1996 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project E39/174 E39/206 E39/263 E39/229 and P38/2587 Annual report for the period ending 31 Decemb |
| A47500 | 1996 | Placer Prospecting Pty Ltd | Sunrise/Sunset | 1.6% | Second Annual report on Exploration Sunrise/Sunset Project M39/217 P39/3076 P39/3090 P39/3091 P39/3238 P39/324 |
| A48993 | 1996 | Wmc Resources Ltd | Wilga Dam | 6.4% | Annual report for the period 1 July 1995 to 30 June 1996 Wilga Dam Project Exploration Licence E39/347 Prospec |
| A44303 | 1995 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Group, Annual Report for the period 1 January to 31st December 1994. E39/174, 206, 229, 263 and P3 |
| A45239 | 1995 | Western Mining Corporation Ltd | Wilga Dam | 6.4% | Annual report for the period 1 July 1994 to 30 June 1995 The Wilga Dam Project Exploration Licence E39/347 Pro |
| A40299 | 1994 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/93-31/12/93 Sunrise Dam Project E39/174,206,229,263 |
| A42285 | 1994 | Western Mining Corporation Ltd | Wilga Dam | 6.4% | Annual Report for the period 28/10/92-30/06/94 The Wilga Dam Project E39/347 P39/2985-2986 (Edjudina, SH51-6, |
| A42103 | 1994 | Placer Exploration Ltd | Sunset | <1% | Annual Report for the period 06/93-06/94 Sunset Project P39/3090-91,3238-40,3076,& 3119 |
| A38820 | 1993 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/92-31/12/92 Sunrise Dam Project E39/174,206,229,263 |
| A40012 | 1993 | Billiton Australia Pty Ltd | Sunrise Central | <1% | Partial surrender report, Sunrise Central, E39/229. |
| A36331 | 1992 | Billiton Australia Pty Ltd | Soak Well | <1% | Soak Well Project,Partial Surrender Report,May 1992, E39/174 & E39/227. |
| A36820 | 1992 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Sunrise Dam Project, Partial Surrender Report July 1992, . E39/174, 206, 229; Surrender Report E39/230. |
| A35603 | 1992 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report for 1 January 1991 to 31 December 1991 Sunrise Dam Project E39/174 E39/206 E39/229 E39/230 E39/2 |
| A33010 | 1991 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report for 30 June 1989 to 31 December 1990 Sunrise Dam Project E39/174 E39/206 E39/227 E39/229 E39/230 |
| A35174 | 1991 | Newcrest Mining Ltd | Sunrise Dam | <1% | Final Report from Soak Well Joint Venture from February 1991 to May 1991. E39/174 and E39/227. Billeton Austr |
| A33196 | 1991 | Billiton Australia Pty Ltd | Freshwater Swamp | <1% | Freshwater Swamp Project,Partial Surrender Report, 21st March 1991, E39/174. |
| A28729 | 1989 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report ending 30 June 1989, Sunrise Dam Project, E39/174, E39/206, E39/227, E39/229, E39/230, P39/215 |
| A2691 | 1972 | Australian Selection Pty Ltd | Wilga | <1% | Wilga Project, Annual Report for the period ending 31/12/1971, TR70/3747; MC39/62-115, 136-143, 191-219, 911-9 |
| A1366 | 1970 | Australian Selection Pty Ltd | Wilga | 1.5% | Wilga Area, Annual Report for the year ending 31/12/1969, TR70/3747H; MC39/62-115, 136-143, 191-209, 911-939 & |
| A1365 | 1968 | Australian Selection Pty Ltd | Wilga | <1% | Wilga Project, Non-statutory Report: Annual Report [s] 1966-1968, for the period ending 31/12/1968, TR70/3747, |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A85886 | 1753 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over L 39/275 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold L 39/275? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.