L 45/453
Register summary
- Holder
- Pilbara Minerals Limited
- Local government
- Shire of East Pilbara
- Application received
- 14 May 2018
- Commenced
- 29 July 2019
- Expiry
- 28 July 2040
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A149976 | 2025 | Pilbara Minerals Limited | PILGANGOORA LITHIUM-TANTALUM PROJECT | 1.6% | Co-Funded drilling campaign to test vertical and spatial relationship between spodumene and lepidolite mineral |
| A145185 | 2024 | Acme Pilbara Pty Ltd; Trek Metals Limited | Pincunah | 18% | Pincunah E45/4909 Partial Surrender Report for the period 31/08/2018 to 30/08/204 |
| A134210 | 2023 | Fmg Pilbara Pty Ltd | E45/5592 | <1% | E45/5592 Final Surrender Report for the period ending 07/02/2023. |
| A133613 | 2023 | Pilbara Minerals Limited | Strelley | 23% | Final Surrender Report - Strelley Project E45/4961 for the period ending 28/11/2022 |
| A136860 | 2023 | Formosa Steel Ib Pty Ltd | Glacier Valley | <1% | C120/2008 (Glacier Valley) Combined Partial Surrender Report For the Period 8 August 2007 to 10 August 2023 |
202 more reports
| A130763 | 2022 | Fortescue Metals Group Ltd | E45/5592 | <1% | E45/5592 Annual Report for the period ending 17/03/2022. |
| A132001 | 2022 | Pilbara Minerals Limited | Strelley | 23% | Annual Technical Report for the Strelley Project for the period ending 03/07/2022. |
| A133279 | 2022 | Pilbara Minerals Limited | Pilgangoora Lithium-Tantalum Project | 1.6% | Co-Funded drilling campaign to test the depth extent of the Pilgangoora rare-metal pegmatite system (R24) |
| A128412 | 2021 | Pilbara Minerals Limited | Strelley | 23% | Annual Technical Report Strelley Project (E45/4961) for the period ending 03/07/2021 |
| A122746 | 2020 | Cleopatra Mining | Cleopatra | <1% | P45/03015 Cleopatra - Annual Report for the period 17 November 2018 to 16 November 2019 |
| A123507 | 2020 | Altura Lithium Operations Pty Ltd | Pilgangoora | 32% | Pilgangoora - Annual Report C134_2011 - 1 May 2019 to 30 April 2020 |
| A125234 | 2020 | Trek Metals Limited | Pincunah | 18% | Annual Technical Report for Pincunah E45/4909 for the period ending 30/8/2020 |
| A123955 | 2020 | Kairos Minerals Limited | Mount York | 44% | Mt York C101/2017 Annual Report for the period ending 29/02/2020 |
| A124011 | 2020 | Pilbara Minerals Limited | Pilgangoora | 2.3% | Combined Annual Exploration Report C123/2002, Pilgangoora Lithium-Tantalum Project for the period ending 23/04 |
| A124487 | 2020 | Pilbara Minerals Limited | Strelley | 23% | Annual Technical Report - Strelley Project (E45/4961) for the period ending 03/07/2020 |
| A118854 | 2019 | Fortescue Metals Group Ltd | Glacier Valley | <1% | C120/2008 Glacier Valley Annual Report For the Period 1 December 2017 to 30 November 2018, E45/02510, E45/0253 |
| A120191 | 2019 | Kairos Minerals Limited | Mount York | 44% | Mt York C101/2017 Annual Technical Report for the period 1 March 2018 to 28 February 2019 |
| A120916 | 2019 | Pilbara Minerals Limited | Strelley | 23% | Annual Technical Report - Strelley Project (E45/4961) for the period 4 July 2018 to 3 July 2019 |
| A119601 | 2019 | Venus Metals Corporation Limited; Pilgangoora Minerals Pty L | Pilgangoora | 21% | E45/4684 Pilgangoora Lithium-Tantalum Project For the Period 2 February 2018 to 1 February 2019 |
| A119947 | 2019 | Altura Lithium Operations Pty Ltd | Pilgangoora | 33% | C134_2019 Pilgangoora – Annual Report for the period 1 May 2018 to 30 April 2019, E45/02287, E45/02363, E45/03 |
| A120328 | 2019 | Pilbara Mines Limited | Pilgangoora | 2.3% | Combined Annual Exploration Report, Pilgangoora Lithium-Tantalum Project C123/2002 for the period 24 April 201 |
| A121647 | 2019 | Acme Pilbara Pty Ltd | Wallareenya | 18% | Annual Technical Report for Wallareenya E45/4909 for the period 31 August 2019 to 30 August 2019 |
| A119603 | 2019 | Venus Metals Corporation Limited; Pilgangoora Minerals Pty L | Pilgangoora | 51% | Pilgangoora E45/04630 Annual Report for the period 6 February 2018 to 5 February 2019 |
| A116425 | 2018 | Venus Metals Corporation Limited | Pilgangoora | 21% | Annual Report for Pilgangoora Lithium -Tantalum Project - Tenement No. E45/4684 For the Period 2 February 2017 |
| A116426 | 2018 | Venus Metals Corporation Limited | Pilgangoora | 51% | Pilgangoora Project E45/04630 Annual Report for the period 06/02/2017 - 05/02/2018 |
| A116830 | 2018 | Kairos Minerals Limited | Mount York | 50% | Mt York Annual Report C101/2017 For the Period 1 March 2017 to 28 February 2018, P45/02988, P45/02989, P45/029 |
| A117065 | 2018 | Pilbara Minerals Limited | Pilgangoora | 2.3% | C123/2002 Combined Annual Exploration Report, Pilgangoora Lithium-Tantalum Project for the period 24/04/2017 - |
| A118250 | 2018 | Kairos Minerals Limited | Mount York | <1% | Mount York P45/02998 Annual Report For the Period 4 May 2017 to 3 May 2018 |
| A116600 | 2018 | Altura Lithium Operations Pty Ltd | Pilgangoora | 33% | Pilgangoora – Annual Report C134_2011, 01 May 2017 to 30 April 2018 |
| A114174 | 2017 | Kairos Minerals Limited | Mount York | 100% | Mount York P45/2993 – Annual Technical Report for the period 04/05/2016 - 03/05/2017 |
| A114175 | 2017 | Kairos Minerals Limited | Mount York | 100% | P45/2992 – Annual Technical Report For the Period 4 May 2016 to 3 May 2017 |
| A114171 | 2017 | Kairos Minerals Limited | Mount York | 100% | Mount York P45/2995 – Annual Technical Report for the period 04/05/2016 - 03/05/2017 |
| A115251 | 2017 | Atlas Iron Limited | Abydos | 14% | Final Surrender Report for E45/2899-I Abydos Project for the period 21 April 2007 to 20 April 2017 |
| A112767 | 2017 | Pilbara Minerals Limited | Lynas Find | 4.1% | Combined Annual Mineral Exploration Report C64/2016 for the Lynas Find Lithium Project C64/2016 for the period |
| A114041 | 2017 | Altura Lithium Operations Pty Ltd | Pilgangoora | 33% | C134/2011 Pilgangoora Project Combined Annual Report for the period 1 February 2016 to 30 April 2017, E45/0228 |
| A114103 | 2017 | Pilbara Minerals Limited | Pilgangoora | 4.2% | Combined Annual Exploration Report, Pilgangoora Lithium-Tantalum Project For the Period 24 April 2016 to 23 Ap |
| A114170 | 2017 | Kairos Minerals Limited | Mount York | <1% | P45/2998 - Mount York Project Annual Technical Report for the period 04/05/2016 - 03/05/2017 |
| A114172 | 2017 | Kairos Minerals Limited | Mount York | 100% | Mount York P45/2988 – Annual Technical Report For the Period 4 May 2016 to 3 May 2017 |
| A114173 | 2017 | Kairos Minerals Limited | Mount York | 100% | Mount York P45/2997 – Annual Technical Report For the Period 4 May 2016 to 3 May 2017 |
| A108899 | 2016 | Altura Exploration Pty Ltd | Pilgangoora | 45% | Pilgangoora Exploration Licence 45/2363 Annual Report 1st May 2015 to 30th April 2016 |
| A108902 | 2016 | Altura Exploration Pty Ltd | Pilgangoora | 100% | Pilgangoora Exploration Licence 45/3488 Annual Report for the period 11th January 2015 - 10th January 2016 |
| A108766 | 2016 | Altura Exploration Pty Ltd | Pilgangoora | <1% | Exploration Licence 45/2287 and Prospecting Licence 45/2758 Combined Annual Report for the period 1st February |
| A109405 | 2016 | Pilbara Minerals Ltd | Pilgangoora | 4.6% | Annual Mineral Exploration Report, Pilgangoora Project for the period 24 April 2015 to 23 April 2016. Combined |
| A109927 | 2016 | Dakota Minerals Limited | Lynas Find | <1% | Exploration Annual Report E45/3648 Lynas Find for the period 07/09/2015 to 06/09/2016 |
| A109653 | 2016 | Atlas Iron Limited | Abydos | 1.2% | ABYDOS PROJECT C40/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending |
| A105555 | 2015 | Altura Exploration Pty Ltd | Pilgangoora | <1% | Exploration Licence 45/2287 and Prospecting Licence 45/2758 Combined Annual Report for the period 1st February |
| A106614 | 2015 | Fortescue Metals Group Ltd | Glacier Valley | 14% | C120/2008 Glacier Valley Final Surrender Report for the period 13/02/2012 to 11/05/2015 |
| A105304 | 2015 | Fmg Pilbara Pty Ltd | Glacier Valley | 1.5% | Glacier Valley Project, Partial Surrender Report for the period 13/02/2012 to 19/12/2014, E45/2855. |
| A105312 | 2015 | Fmg Pilbara Pty Ltd | Turner River 5 | <1% | Final Surrender Mineral Exploration Report E45/2853 Turner River 5 for the period 13 February 2012 to 19 Decem |
| A105322 | 2015 | Fortescue Metals Group Ltd | Glacier Valley - Pinpin River 1 | 54% | Partial Surrender Mineral Exploration Report: E45/2854 (Pinpin River 1) Glacier Valley Project for the period |
| A105939 | 2015 | Atlas Iron Ltd | Abydos | 9% | Abydos Project C40/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending |
| A106348 | 2015 | Pilbara Minerals Ltd | Pilgangoora | 4.6% | Pilgangoora Project, WA Annual Group Report C123/2002 24 April 2014 – 23 April 2015, [E45/2232, E45/2241, M45/ |
| A107316 | 2015 | Asgard Metals Pty Ltd | McPhee's - Pilgangoora | <1% | ANNUAL REPORT For the Period 6 September 2014 to 5 September 2015 MCPHEE'S - PILGANGOORA Mineral Exploration A |
| A104729 | 2015 | Altura Exploration Pty Ltd | Pilgangoora | 100% | Pilgangoora Project E45/3488 Annual Report for the period 11/01/2014 - 10/01/2015 |
| A105066 | 2015 | Fortescue Metals Group Ltd | Glacier Valley | 11% | Combined Annual Report for the Period 1 December 2013 to 30 November 2014, C120/2008, Glacier Valley Project E |
| A102322 | 2014 | Trafford Resources Ltd | Lynas Find | 22% | Combined Annual Mineral Exploration Report C348/2011, Lynas Find Project, for the period 01/04/2013 to 31/03/2 |
| A102356 | 2014 | Atlas Iron Ltd; Altura Mining Ltd | Abydos | 9.4% | Abydos Project, Annual Report for the period 01/05/2013 to 30/04/2014, E45/2308,2362-2363, 2728,2899, 3298, 33 |
| A103820 | 2014 | Asgard Metals Pty Ltd | McPhees | <1% | McPhees Project, Annual Report for the period 06/09/2013 to 05/09/2014, E45/3648. |
| A101798 | 2014 | Lithex Resources Ltd | Pilgangoora | <1% | Final Relinquishment Report E 45/3373 Pilgangoora For the Period 16 February 2010 to 7 February 2014. |
| A101850 | 2014 | Altura Exploration Pty Ltd | Pilgangoora | <1% | Pilgangoora Project, Annual Report for the period 01/02/2013 to 31/01/2014, e45/2287; P45/2758. [C134/2011] |
| A101524 | 2014 | Fortescue Metals Group Ltd | Glacier Valley | 7.8% | Combined Report for the Period 1st December 2012 to 30th November 2013, C120/2008 Glacier Valley |
| A98064 | 2013 | Atlas Iron Ltd | Abydos | 8.8% | Abydos Project, Annual Report for the period ending 30th April 2013, E45/2308, 2362-2363, 2471, 2728, 2899, 32 |
| A98065 | 2013 | Altura Exploration Pty Ltd | Pilgangoor | 45% | Pilgangoor Project, Annual Report for the period 1st May 2012 to 30th April 2013, E45/2363. [C40/2007] |
| A99558 | 2013 | Ascot Resources Ltd | McPhees | <1% | Mineral Exploration Annual Tenement Report E45/3648 McPhees Gold Project for the period 06/09/12 - 05/09/13 |
| A96559 | 2013 | Altura Exploration Pty Ltd | Pilgangoora | 100% | Exploration Licence 45/3488 Annual Report for the period 11th January 2012 to 10th January 2013 |
| A97778 | 2013 | Atlas Iron Ltd | Abydos | 14% | Abydos Project, Partial Surrender Report for the period 21/04/2007 to 20/04/2013, E45/2899. [C40/2007] |
| A97801 | 2013 | Altura Exploration Pty Ltd | Pilgangoora | <1% | Pilgangoora Project, Annual Report for the period 1st February 2012 to 31st January 2013, E45/2287; P45/2758. |
| A98263 | 2013 | Global Advance Metals Pty Ltd | Pilgangoora | 4.6% | Pilgangoora Project, Annual Report for the period 24th April 2012 to 23rd April 2013, E45/2232 & 2241; M45/78, |
| A98484 | 2013 | Trafford Resources Ltd | Lynas Find | 22% | Combined Annual Mineral Exploration Report C348/2011, Lynas Find Project, for the period 01/04/2011 to 31/03/2 |
| A96750 | 2013 | Fortescue Metals Group Ltd | Glacier Valley | 9.1% | Glacier Valley Combined Report (Iron Bridge Project) C120/2008 Annual Report for the period 1st December 2011 |
| A98197 | 2013 | Lithex Resources Ltd | Pilgangoora | <1% | Pilgangoora Project, Annual Report for the period 1st March 2012 to 28th February 2013, E45/3373 & P45/2599. [ |
| A93197 | 2012 | Fortescue Metals Group Ltd | Glacier Valley - Iron Bridge | <1% | Glacier Valley Annual Report for the period 1st December 2010 to 30th November 2011, E45/2510-1, E45/2535-1, a |
| A93481 | 2012 | Altura Mining Ltd | Pilgangoora | <1% | Exploration Licence 45/2287 and Prospecting Licence 45/2758 Combined Annual Report for the period 1st February |
| A93939 | 2012 | Trafford Resources Ltd | Lynas Find | 22% | Combined Annual Mineral Exploration Report C348/2011, Lynas Find Project, for the period 01/04/2011 to 31/03/2 |
| A92951 | 2012 | Altura Mining Ltd | Pilgangoora | 100% | Pilgangoora E45/3488 Exploration Licence 45/3488 Annual Report 2012, 11th January 2011 - 10th January 2012 |
| A93821 | 2012 | Lithex Resources Ltd | Pilgangoora | <1% | Combined Annual Report E 45/3373 & P45/2599 Pilgangoora for the period 1 March 2011 – 29 February 2012, C345/2 |
| A93980 | 2012 | Global Advance Metals Pty Ltd | Pilgangoora | 4.6% | Annual Report for the period 24th April 2011 to 23rd April 2012, Pilgangoora Project, C123/2002, E45/2232, E45 |
| A94018 | 2012 | Atlas Iron Ltd | Abydos | 6.4% | ABYDOS PROJECT C40/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending |
| A95262 | 2012 | Epic Resources Limited | McPhees | <1% | E45/3648 Annual Report for McPhees Gold Project for the period 01/09/11 to 31/08/12 |
| A90329 | 2011 | Trafford Resources Ltd | Lynas Find | 11% | Lynas Find Project, Annual Report for the period 13/02/2010 to 12/02/2011, E45/2375. (C207/2006) |
| A90488 | 2011 | Altura Exploration Pty Ltd | Pilgangoora | <1% | Pilgangoora Project, Annual Report for the period 20th April 2010 to 19th April 2011, E45/2287. |
| A90513 | 2011 | Atlas Iron Ltd | Abydos | 7.1% | Abydos Project, Annual Report for the period ending 30th April 2011,E45/2362, 2363, 2404, 2471, 2728, 2765, 28 |
| A92146 | 2011 | Trafford Resources Ltd | Lynas Find | <1% | Lynas Find Project P45/2629, Annual Technical Report for the period 21/11/2008 to 21/11/2009 |
| A89460 | 2011 | Fortescue Metals Group Ltd | Glacier Valley | <1% | Annual report for the period 1st December 2009 to 30th November 2010, Glacier Valley Project, E45/3084, E45/2 |
| A90293 | 2011 | Lithex Resources Ltd | Pilgangoora | <1% | Annual Exploration Report E 45/3373 Pilgangoora For the Period Ending 15 February 2011, (Shaw River). |
| A90379 | 2011 | Global Advanced Metals Pty Ltd | Pilgangoora | 4.4% | Pilgangoora Project, Annual Report for the period 24th April 2010 to 23rd April 2011, E45/2232, E45/2241, E45/ |
| A90380 | 2011 | Atlas Iron Ltd | Abydos - Pilgangoora | 4.6% | Abydos - Pilgangoora Project, Annual Report for the period ending 23rd April 2011, E45/2232, E45/ 2241; M45/78 |
| A87091 | 2010 | Talison Minerals Pty Ltd | Pilgangoora | 4.4% | Annual Report for the period 24th April 2009 to 23rd April 2010, Pilgangoora Project, C123/2002 |
| A92145 | 2010 | Trafford Resources Ltd | Lynas Find | 100% | Lynas Find Project P45/2628 Annual Technical Report on Exploration for the period 21/11/2009 to 21/11/2010 |
| A92147 | 2010 | Trafford Resources Ltd | Lynas Find | <1% | Lynas Find Project P45/2629 Annual technical Report on exploration for the period 21/11/2009 to 21/11/2010 |
| A87472 | 2010 | Atlas Iron Ltd | Abydos | 8.4% | Annual Report to the Department of Mines and Petroleum for the period 01/05/2009 to 30/04/2010 |
| A85855 | 2010 | Fortescue Metals Group Ltd | Glacier Valley | <1% | Annual report for the period 1 December 2008 to 30 November 2009, Glacier Valley Project, E45/3084, E45/2510 & |
| A86991 | 2010 | Altura Mining Ltd | Pilgangoora | <1% | Exploration Licence 45/2287 Annual Report 2010, Report Period: 20th April 2009 to 19th April 2010 |
| A87231 | 2010 | Trafford Resources Ltd | Lynas Find | 11% | Lynas Find Project Exploration Licence E45/2375 4th Year Partial Surrender Report of Hamersley Range 852 W & |
| A87232 | 2010 | Trafford Resources Ltd | Lynas | 11% | Lynas Find Project Exploration Licence E45/2375 Annual Technical Report on Exploration for the period 13/02/20 |
| A82526 | 2009 | Australian Tantalum Ltd | Pilgangoora | <1% | Annual Report For Exploration Lease E45/2287 for the period 20th April 2008 TO 19th April 2009 |
| A82658 | 2009 | Atlas Iron Ltd; Shaw River Resources Ltd | Abydos | 8.4% | Annual Report to the Department of Mines and Petroleum for the period 01/05/2008 to 30/04/2009 Tenements: E45 |
| A92144 | 2009 | Trafford Resources Ltd | Lynas Find | 100% | Lynas Find Project P45/2628 annual technical report on exploration for the period 21/11/2008 to 21/11/2009 |
| A80926 | 2009 | Montezuma Mining Company Ltd | Pilgangoora | 11% | Annual Report on E45/2375, Pilgangoora Project, for the Period 13 February 2008 to 12 February 2009 |
| A80932 | 2009 | Fortescue Metals Group Ltd | Glacier Valley | <1% | Annual report for the period 8 August 2007 to 30 November 2008, Glacier Valley Project, E45/3084, E45/2510 & E |
| A81935 | 2009 | Montezuma Mining Company Ltd | Pilgangoora | 11% | Partial Surrender Report on E45/2375, Pilgangoora Project, For the Period 13 February 2006 to 12 February 2009 |
| A78704 | 2008 | Talison Minerals Ltd | Pilgangoora | 4.4% | PILGANGOORA PROJECT ANNUAL REPORT FOR THE PERIOD 24th April 2007 to 23rd April 2008 TENEMENT: C123/2002 GROUP, |
| A78725 | 2008 | Atlas Iron Ltd | Abydos | 8.4% | Annual Report to the Department of Industry and Resources Abydos for the period 01/05/07 to 30/05/08, TENEMENT |
| A82597 | 2008 | Atlas Iron Ltd | Abydos | 2.8% | Abydos Project C123/2002, E45/2232, E45/2241 and E45/2251Annual for the period 24/04/2008 to 23/04/2009 |
| A77983 | 2008 | Montezuma Mining Company Ltd | Pilgangoora | 11% | Annual Report on E45/2375, Pilgangoora Project for the Period 13 Feb 2007 to 12 Feb 2008 |
| A78016 | 2008 | Australian Tantalum Ltd | Pilgangoora | <1% | ANNUAL REPORT FOR Exploration Lease E45/2287 FOR THE PERIOD 20th April 2007 TO 19th April 2008 Report Number : |
| A80482 | 2008 | Trafford Resources Ltd | LYNAS FIND | 44% | LYNAS FIND PROJECT, PROSPECTING LICENCES P45/2557 – P45/2560 & P45/2562 – P45/2567, ANNUAL TECHNICAL REPORT ON |
| A75309 | 2007 | Haddington Resources Ltd | Pilgangoora | <1% | Annual Report for Exploration Lease E45/2287, For the Period 20th April 2006 TO 19th April 2007. (Report No.E4 |
| A75311 | 2007 | Sons Of Gwalia Ltd | Pilgangoora | 11% | Pilgangoora Project, Annual Report for the period 11th September 2005 to 10th September 2006, M45/511. |
| A75373 | 2007 | Atlas Iron Ltd | Abydos | 6.4% | Annual Report for the Period 01/05/06 to 30/04/07 Tenements:E45/2362,E45/2363,E45/2404,E45/2471,E45/2594, E45/ |
| A75697 | 2007 | Sons Of Gwalia Ltd | Pilgangoora | 4.6% | Pilgangoora Project, Annual Report for the period 24th April 2006 to 23rd April 2007, E45/2241, M45/78, M45/33 |
| A74746 | 2007 | Sons Of Gwalia Ltd | Pilgangoora | 3% | Pilgangoora Project E45/2232, Annual Report for the Period 17 Nov 2005 to 16 Nov 2006. SOG Report No.2232-2006 |
| A76745 | 2007 | Trafford Resources Ltd | Lynas Find | 44% | LYNAS FIND PROJECT EXPLORATION LICENCES P45/2557 - P45/2560 & P45/2562 - P45/2567 ANNUAL TECHNICAL REPORT ON E |
| A76752 | 2007 | Talison Pty Ltd | Pilgangoora | 11% | Pilgangoora Project, Annual Report for the period 11th September 2006 to 10th September 2007, M45/511. |
| A74812 | 2007 | Montezuma Mining Company Ltd | Pilgangoora | 11% | Annual Report on E45/2375, Pilgangoora Project, For the Period 13 February 2006 to 12 February 2007 |
| A73283 | 2006 | Sons Of Gwalia Ltd | Pilgangoora | 4.6% | Pilgangoora Project E45/2241,M45/78,333, Annual Report for the Period 24 April 2005 to 23 April 2006, Combined |
| A71916 | 2006 | Sons Of Gwalia Ltd | Pilgangoora | 4.6% | Pilgangoora Project, Annual Report for the period 24 April 2004 to 23 April 2005, E45/2241,M45/78,M45/333, Com |
| A73865 | 2006 | Trafford Resources Ltd | Lynas Find | 44% | Lynas Find Project P45/2557-2560,2562-2567, Annual Technical Report on Exploration for the Period 14/10/2005 t |
| A68663 | 2004 | Sons Of Gwalia Ltd | Pilgangoora | 2.9% | Annual Report for the period 24/04/2003-23/04/2004 Pilgangoora Project(C123/2002), E45/2241, E45/2242 |
| A67056 | 2003 | Sons Of Gwalia Ltd | Pilgangoora | 4.7% | Pilgangoora Project, Partial Surrender Report for the period 24 April 2002 to 24 June 2003, E45/2241. SOG Rep |
| A67065 | 2003 | Sons Of Gwalia Ltd | Pilgangoora | <1% | Pilgangoora Project, Surrender Report for the period14 February 2003 to 28 May 2003, E45/2307. SOG Report No. |
| A66675 | 2003 | Lynas Gold Nl | Lynas Find | 7.3% | Surrender Report May 2003 Lynas Find Project C264/1993 for the tenements M45/281-2, 523-4, P45/2229, 2338, 235 |
| A67020 | 2003 | Sons Of Gwalia Ltd | Pilgangoora | 2.9% | Pilgangoora Project, Annual Report for the period 24 April 2002 to 23 April 2003, C123/2002, E45/2241-2242. S |
| A63518 | 2001 | De Beers Australia Exploration Ltd | Carlindi | 15% | Annual Report for Exploration Licences 45/2195 - 45/2200. |
| A57800 | 1999 | Sipa Resources Ltd | Panorama | 5.2% | SurrenderReport E45/825,1040,1207,1288,1290,1291,1351,1384,1423,1438,1478,1479,1564,1575,1592,1593,1646, 2029 |
| A55428 | 1998 | Lynas Gold Nl | Pilgan | <1% | Pilgan Project, Annual Report M45/39, 77, 78, 300, 323, 324, 333, 334, 335 and 397 for period 25th February 19 |
| A55500 | 1998 | Lynas Gold Nl | Panorama / Lynas East | 10% | Lynas East JV Annual Report for the Tenements E45/1207, 1288, 1290, 1423, & 1438 for the period 1st January 19 |
| A54854 | 1998 | Lynas Gold Nl | Lynas Find | 21% | Lynas Find Project Annual Report For The Tenemj!nts M45/278, 281, 282, 355, 356, 464, 511, 523 - 525, P45/233 |
| A50712 | 1997 | Lynas Gold Nl | Lynas Find | 6.2% | Lynas Find Project ,Annual report for the tenements E45/1616 15th February 1996 to 14th February 1997. |
| A50883 | 1997 | Lynas Gold Nl | Lynas Find | <1% | Lynas Find Project, (Pilgan Joint Venture) Annual Report M45/39, 77,78,300, 323, 324, 333, 334, 335, & 397 for |
| A53154 | 1997 | Lynas Gold Nl | Lynas Find | 76% | Lynas Find Project, Annual Report for the period 02/10/1996 to 01/10/1997, E45/1283. |
| A49963 | 1997 | Lynas Gold Nl | Lynas Find | 21% | Lynas Find Project Annual report for the tenements M45/278 M45/281 M45/282 M45/355 M45/356 M45/464 M45/511 M45 |
| A50546 | 1997 | Lynas Gold Nl | Lynas East | 10% | Lynas East (JV) Project, Annual Report for the Tenements E45/1207, 1288, 1290, 1423 & 1438 for the period 1st |
| A53743 | 1997 | Sipa Resources Ltd | Panorama | 17% | Dept of Minerals and Energy E45/1288 &1290 Partial Surrender Report Pincunah Exploration Area, Panorama Proje |
| A48323 | 1996 | Lynas Gold Nl | Lynas Find | 76% | Lynas Find Project, Annual Report for the period 02/10/1994 to 02/10/1995, E45/1283. |
| A48123 | 1996 | Lynas Gold Nl | Lynas Find | 1.5% | Lynas Find Project ,Exploration Licence E45/1577 Annual report for the period 02/06/1995 to 01/06/96 |
| A47225 | 1996 | Lynas Gold Nl | Lynas East | 10% | Lynas East Gold Exploration Project, Annual Report 1995, Tenements E45/1288, 1290, 1423, 1438 AND 1207. |
| A47226 | 1996 | Sipa Resources Ltd | Panorama | 10% | Panorama Project, Annual Report Overing the Period 1 January 1995 to 31 December 1995, Tenements E45/1207, 128 |
| A47404 | 1996 | Lynas Gold Nl | Lynas Find | 26% | Annual report for 1995 for Tenements M45/278 M45/281 M45/282 M45/355 M45/356 M45/464 M45/511 M45/523 M45/524 M |
| A49588 | 1996 | Lynas Gold Nl | Lynas Find | 76% | Lynas Find Project E45/1283 Annual Report |
| A44305 | 1995 | Sipa Exploration Nl | McDonalds | 100% | McDonalds Project, 1994 Annual Report P45/2228 for the period ending 17th December 1994. |
| A47224 | 1995 | Lynas Gold Nl | Lynas Find | 100% | Lynas Find Project, Old Faithful, Annual Report 1995. |
| A43237 | 1995 | Lynas Gold Nl | Lynas Find | 33% | Lynas Find Project, Annual Report M45/278, 282, 355, 356, 464, 523, 524, & 525, December 1994. |
| A45049 | 1995 | Sipa Resources Ltd | Panorama / Pincunah | 11% | Panorama / Pincunah Project, 1994 Annual Report on the Pincunah Exploration Area, Panorama Project (covering t |
| A43107 | 1994 | Lynas Gold Nl | Lynas Find | 76% | Lynas Find Project,Annual Report E45/1283 for period 01/12/1993 to 01/12/1994. |
| A41344 | 1994 | Sipa Resources Ltd | Panorama - Pincunah | 11% | Panorama - Pincunah Project, Annual Report for the period 27th November 1992 to 31st December 1993, E45/971, 1 |
| A38526 | 1993 | Mim Exploration Pty Ltd | McPhees Cairn | 100% | McPhees Cairn Project, 1992 Annual Report, June 1993, P45/2228. |
| A39844 | 1993 | Lynas Gold Nl | Lynas Find | 76% | Lynas Find Project, Annual report for the period 01/01/1993 to 31/12/1993, E45/1238. |
| A39949 | 1993 | Mim Exploration Pty Ltd | McPhees Cairn | 100% | McPhees Cairn Project, Annual Report for the period to 17th December 1993, P45/2228. |
| A38897 | 1993 | Lynas Gold Nl | Pilbara Gold | 43% | R Report for the period 03/93 Pilbara Gold Project M45/278,280-282,511,523-525 |
| A39176 | 1993 | Sipa Resources Ltd | Panorama - Pincunah | 16% | Panorama - Pincunah Project, Annual Report for the period 27th November 1991 to 26th November 1992, E45/971,12 |
| A36474 | 1992 | Mim Exploration Pty Ltd | McPhees Cairn | 100% | McPhees Cairn Project,1991 Annual Report, June 1992, M45/280. |
| A37185 | 1992 | Mim Exploration Pty Ltd | McPhee's Hill | 8.8% | McPhee's Hill (JV) Project, Annual Report for the period to October 1992, M45/501 & M45/526. |
| A34837 | 1992 | Mim Exploration Pty Ltd | McPhee's Hill | 7.7% | McPhee's Hill Project, Annual Report for year ending December 1991, P45/1462 ( Now MLA 45/526), M45/501. |
| A37339 | 1992 | Lynas Gold Nl | Lynas Find | 61% | Report for the period 01/03/92 - 01/06/92 Lynas Find Project M45/278,281-282,511,523-525, P45/2229, E4 5/1283 |
| A37340 | 1992 | Lynas Gold Nl | Lynas Find | 61% | LYNAS FIND, PILBARA, W .A. INTERIM REPORT FOR THE PERIOD I JULY - OCTOBER, 1992 I VOLUME I (M45/278, 281-282 |
| A33048 | 1991 | Carpentaria Exp Co Pty Ltd | McPhees Cairn | 100% | McPhees Cairn Project, 1990 Annual Report, February 1991, M45/280. |
| A34418 | 1991 | Lynas Gold Nl | Lynas Find | 39% | Lynas Find Project, Non-statutory Report:Exploration Report, February 1991, M45/278,281 & 282; P45/1412-1413, |
| A34835 | 1991 | Mim Exploration Pty Ltd | Mali | 100% | Mali Project, Annual Report for the period 16/06/1990 to 15/06/1991, P45/1916. |
| A30417 | 1990 | Carpentaria Exp Co Pty Ltd | McPhees Cairn | 100% | McPhees Cairn Project, Non-statutory Report:Report on the work conducted by Carpentaria Exploration Company Lt |
| A31704 | 1990 | Pilgan Mining Pty Ltd | Pilgangoora | <1% | Pilgangoora Project, Annual Report, October 1990, Combined Reporting No: CR 123/2002. ( Pilgangoora Tantalite |
| A31776 | 1990 | Carpentaria Exp Co Pty Ltd | Mali | 100% | Mali Project, 1989/1990 Annual Report, October 1990, |
| A32391 | 1990 | Carpentaria Exp Co Pty Ltd | McPhee's Hill | 8.8% | McPhee's Hill (JV) Project, Annual Report to December 1990, P45/1462, M45/501. |
| A31491 | 1990 | Lynas Gold Nl | Iron Stirrup | 100% | Non-statutory Report:R Report for 1989; M45/278) Pre-feasibility Study for a Gold Processing Plant for the Iro |
| A31018 | 1990 | Lynas Gold Nl | McPhee's Patch South | 47% | Exploration Report on Reverse Circulation Percussion Drilling at McPhee's Patch South, Mining lease M45/282 an |
| A31602 | 1990 | Lynas Gold Nl | Lynas Find | 55% | Lynas Find Project, Final Surrender Report, July 1990, E45/967. |
| A31777 | 1990 | Carpentaria Exp Co Pty Ltd | Mali | 100% | Mali Project, Non-statutory Report: Surrender Report on the work conducted by Carpentaria Exploration Co Pty L |
| A31961 | 1990 | Carpentaria Exp Co Pty Ltd | Pilgan Project | 1.3% | Pilgan Project, Final Surrender Report for the period March 1989 to October 1990, M45/77,78,324,333-335 & 397. |
| A28243 | 1989 | Pilgan Mining Pty Ltd | Pilgangoora | <1% | Development Proposal, Pilgangoora, March 1989. |
| A27823 | 1989 | Lynas Gold Nl | Lynas Find | 25% | Lynas Find Project, Annual report 1988 on M45/278, M45/281, M45/282, P45/1412, P45/1413, P45/1481, P45/1482, |
| A28919 | 1989 | Lynas Gold Nl | Pilgangoora - Lynas Find | 31% | Non-statutory Report : Regional Assessment Pilgangoora District Central Pilbara WA (1989) M45/54, M45/278, M45 |
| A29865 | 1989 | Lynas Gold Nl | Lynas Find - Iron Stirrup | 61% | Lynas Find -Iron Stirrup Project, Non-statutory Report: Insitu Gold Resource Estimation at the Iron Stirrup Pr |
| A27293 | 1989 | Lynas Gold Nl | Pommy Well | 100% | Final Report, Exploration Licence 45/820, Pommy Well. |
| A27169 | 1989 | Carpentaria Exp Co Pty Ltd | Green Well | 57% | Green Well, E45/606, Progress Report to February 1989. |
| A27571 | 1989 | Carpentaria Exp Co Pty Ltd | Pilgan | 1.3% | Pilgan Project, Annual Report for the period ending 28/02/1989, M45/77-78, 324, 333-335 & 397. [C123/2002] |
| A29685 | 1989 | Lynas Gold Nl | Lynas Find | 39% | Lynas Find Project,Annual Report for the period 01/01/1989 to 31/12/1989, M45/278,281 & 282 ; P45/1412, P45/1 |
| A36497 | 1989 | Carlindi Mining Corp Nl | Lalla Rookh | 100% | [ Lalla Rookh Gold Exploration, Non-statutory report, M45/461, P45/1036 ] |
| A27249 | 1988 | Lynas Gold Nl | Pilgangoora | 12% | Non-statutory Report ; Stream Sediment Sampling. Pilgangoora Area East Pilbara District W.A. 12/1988 P45/148 |
| A23913 | 1988 | Lynas Gold Nl | Lynas Find | 72% | Lynas Find Project, -1987 Annual Report . P45/193-194, 241-242, 278, 449-451, 632. M45/54 , February 1988. |
| A27312 | 1988 | Lynas Gold Nl | Pilgangoora | 14% | Non-statutoryReport on Stream Sediment Sampling in Pilgangoora Area, East Pilbara District, W.A. P45/1412 and |
| A19763 | 1987 | Clackline Refractories Ltd | Lynas Find | 48% | Non-statutory Report: Report on Geochemical Exploration at the Lynas Find Project Report for P45/449 to P45/45 |
| A18659 | 1986 | Clackline Refractories Ltd | Lynas Find | 98% | Lynas Find Project, Annual Report for the period 01/11/1985 to 01/08/1986, M45/54; P45/241 & 242.[Iron Stirrup |
| A17099 | 1986 | Pancontinental Mining Ltd | Pilgangoora | <1% | Annual report Pilgangoora E45/361 and M45/646 (1985) Pancontinental Mining Ltd |
| A18530 | 1986 | Clackline Refractories Ltd | McPhee's Cairn | 91% | Annual Report on PL45/188 McPhee's Cairn Project, Lynas Find Gold` Prospect Western Australia (1986) |
| A18529 | 1985 | Clackline Refractories Ltd | Lynas Find | 74% | Lynas Find Project, Non-statutory Report, December 1985 PL45/188 PL45/193 PL45/194 PL45/241 PL45/242 PL45/278 |
| A13108 | 1983 | Metana Minerals Nl | Pincunah | 1.1% | Pincunah Project, Final Surrender Report, August 1983, P45/37-43; E45/38. |
| A19207 | 1983 | Pancontinental Mining Ltd | Pilgangoora - Paynes Find - Yinnietharra | <1% | An evaluation of the rare-metal potential of pegmatites at the Pilgangoora, Paynes Find, Yinnietharra, Wodgina |
| A11368 | 1982 | International Nickel Aust Ltd | McPhees | 100% | McPhees Project, Non- Statutory Report : Annual Report for the period 01/01/1982 to 31/12/1982, TR70/8275-8260 |
| A10303 | 1981 | Amax Iron Ore Corporation | McPhees Patch | 53% | McPhees Patch Project, Final Surrender Report, September 1981, GML45/1576-78 & MC45/9498. |
| A5561 | 1975 | Esso Australia Ltd | Chinnamon Creek | 27% | Chinnamon Creek, Annual report [non-statutory] for period ending 16th March 1975, Temporary Reserve 5723H [ TR |
| A5637 | 1975 | Esso Australia Ltd | Chinnamon Creek | 1.6% | Chinnamon Creek Claims, Annual report for Period ending March 1975, MC45/6922 ... 45/7048 |
| A5570 | 1975 | Esso Exploration Aust Inc | McPhee | 54% | Annual report for period ending March 1975, McPhee Claims, MC45/7251 ... 45/7698-7702 [Plates 7-30 see A5571] |
| A5571 | 1975 | Esso Exploration Aust Inc | McPhee | 54% | Annual report [non-statutory] for period ending March 1975, McPhee Claims, MC45/7251 ... 45/7702 [Plates 7-30, |
| A4517 | 1974 | Esso Australia Ltd | Chinnamon Creek | 27% | Chinnamon Creek Project, Annual Report for the period ending 16th March 1974, TR70/5723H. |
| A5476 | 1974 | Esso Australia Ltd | Chinnamon Creek | 27% | Temporary Reserve 5723H [ TR70/5723 ], Chinnamon Creek, Quarterly report [non-statutory] for period ending 16t |
| A5195 | 1974 | Esso Australia Ltd | Chinnamon Creek | 27% | TR70/5723, Chinnamon Creek Project, Quarterly report [non-statutory] for the period ending August 16th 1974 |
| A3664 | 1973 | Consolidated Gold Fields Aust Ltd | Pilgangoora | 57% | Pilgangoora Project, Final Surrender Report, (Appendix), March 1973, TR70/4931H; MC45/4974, 6527-6547. |
| A3663 | 1973 | Consolidated Gold Fields Aust Ltd | Pilgangoora | 57% | Pilgangoora (JV) Project, Final Surrender Report, March 1973, TR70/4931H; MC45/4974, 6527-6547. |
| A893 | 1971 | Mcintyre Mines (Aust) Pty Ltd | Pilgangoora | 58% | Pilgangoora Project, Annual (Progress) Report for the period ending 31/12/1970, ( Field Season) TR70/4931H. |
| A894 | 1971 | Mcintyre Mines (Aust) Pty Ltd | Pilgangoora | 58% | Pilgangoora Project, Non-statutory Report: Plans to accompany A893, for the period ending 31/12/1970, TR70/49 |
| A892 | 1970 | Mcintyre Mines Pty Ltd | Pilgangoora | 58% | Pilgangoora Project, Annual Report for the year ending 31/12/1969, TR70/4931H. |
| A3205 | 1970 | Pickands Mather & Co Int | Pilgangoora -Valley of Gossans | 2% | Pilgangoora -Valley of Gossans Project, Non-statutory Report: Report on the Diamond Drilling Programme for jue |
| A3204 | 1969 | Pickands Mather & Co Int | Valley of Gossans - Pilgangoora | 2% | Valley of Gossans - Pilgangoora Project, Non-statutory Report: Interim Exploration Report, August 1969, MC5/13 |
| A102445 | 1753 | Global Advance Metals Pty Ltd | Pilgangoora | 4.6% | Annual Report for the period 24th April 2013 to 23rd April 2014, Pilgangoora Project, C123/2002 |
| A40993 | 1753 | Lynas Gold Nl | Lynas Find | 26% | Annual report for the period 01/93-12/93 Lynas Find Project M45/278 M45/281-282 M45/355-356 M45/464 M45/511 M4 |
| A136148 | Pilbara Minerals Limited | pXRD analysis GSWA - PLSEIS001 | 1.6% | pXRD analysis GSWA - PLSEIS001 | |
| A149380 | Terra Petrophysics Pty Ltd | <1% | Core Library Sampling Of Drillholes C3DD024, PLSEIS001 And KDD002 For Petrophysics |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 14 years · 28 July 2040
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over L 45/453 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold L 45/453? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.