L 45/453
L 45/453 is a live miscellaneous licence in the Shire of East Pilbara, Western Australia, held by Pilbara Minerals Limited (part of PLS Group Limited). Granted on 29 July 2019 for 21 years, it expires on 28 July 2040. The ground is covered by 207 historical WAMEX reports.
Register summary
- Holder
- Pilbara Minerals Limited
- Part of
- PLS Group Limited (ASX:PLS) as at 2026-06-30
- Local government
- Shire of East Pilbara
- Application received
- 14 May 2018
- Commenced
- 29 July 2019
- Expiry
- 28 July 2040
- Term
- 21 Years
The full record on L 45/453
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares (no change of holder on record)
- The full record: 14 conditions and 17 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (14 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A149976 | 2025 | Pilbara Minerals Limited | PILGANGOORA LITHIUM-TANTALUM PROJECT | 1.6% | Co-Funded drilling campaign to test vertical and spatial relationship between spodumene and lepidolite mineral |
| A145185 | 2024 | Acme Pilbara Pty Ltd; Trek Metals Limited | Pincunah | 18% | Pincunah E45/4909 Partial Surrender Report for the period 31/08/2018 to 30/08/204 |
| A133613 | 2023 | Pilbara Minerals Limited | Strelley | 23% | Final Surrender Report - Strelley Project E45/4961 for the period ending 28/11/2022 |
| A134210 | 2023 | Fmg Pilbara Pty Ltd | E45/5592 | <1% | E45/5592 Final Surrender Report for the period ending 07/02/2023. |
| A136860 | 2023 | Formosa Steel Ib Pty Ltd | Glacier Valley | <1% | C120/2008 (Glacier Valley) Combined Partial Surrender Report For the Period 8 August 2007 to 10 August 2023 |
202 more reports
| A130763 | 2022 | Fortescue Metals Group Ltd | E45/5592 | <1% | E45/5592 Annual Report for the period ending 17/03/2022. |
| A132001 | 2022 | Pilbara Minerals Limited | Strelley | 23% | Annual Technical Report for the Strelley Project for the period ending 03/07/2022. |
| A133279 | 2022 | Pilbara Minerals Limited | Pilgangoora Lithium-Tantalum Project | 1.6% | Co-Funded drilling campaign to test the depth extent of the Pilgangoora rare-metal pegmatite system (R24) |
| A128412 | 2021 | Pilbara Minerals Limited | Strelley | 23% | Annual Technical Report Strelley Project (E45/4961) for the period ending 03/07/2021 |
| A125234 | 2020 | Trek Metals Limited | Pincunah | 18% | Annual Technical Report for Pincunah E45/4909 for the period ending 30/8/2020 |
| A123507 | 2020 | Altura Lithium Operations Pty Ltd | Pilgangoora | 32% | Pilgangoora - Annual Report C134_2011 - 1 May 2019 to 30 April 2020 |
| A122746 | 2020 | Cleopatra Mining | Cleopatra | <1% | P45/03015 Cleopatra - Annual Report for the period 17 November 2018 to 16 November 2019 |
| A123955 | 2020 | Kairos Minerals Limited | Mount York | 44% | Mt York C101/2017 Annual Report for the period ending 29/02/2020 |
| A124011 | 2020 | Pilbara Minerals Limited | Pilgangoora | 2.3% | Combined Annual Exploration Report C123/2002, Pilgangoora Lithium-Tantalum Project for the period ending 23/04 |
| A124487 | 2020 | Pilbara Minerals Limited | Strelley | 23% | Annual Technical Report - Strelley Project (E45/4961) for the period ending 03/07/2020 |
| A119601 | 2019 | Venus Metals Corporation Limited; Pilgangoora Minerals Pty L | Pilgangoora | 21% | E45/4684 Pilgangoora Lithium-Tantalum Project For the Period 2 February 2018 to 1 February 2019 |
| A119603 | 2019 | Venus Metals Corporation Limited; Pilgangoora Minerals Pty L | Pilgangoora | 51% | Pilgangoora E45/04630 Annual Report for the period 6 February 2018 to 5 February 2019 |
| A120191 | 2019 | Kairos Minerals Limited | Mount York | 44% | Mt York C101/2017 Annual Technical Report for the period 1 March 2018 to 28 February 2019 |
| A120328 | 2019 | Pilbara Mines Limited | Pilgangoora | 2.3% | Combined Annual Exploration Report, Pilgangoora Lithium-Tantalum Project C123/2002 for the period 24 April 201 |
| A118854 | 2019 | Fortescue Metals Group Ltd | Glacier Valley | <1% | C120/2008 Glacier Valley Annual Report For the Period 1 December 2017 to 30 November 2018, E45/02510, E45/0253 |
| A119947 | 2019 | Altura Lithium Operations Pty Ltd | Pilgangoora | 33% | C134_2019 Pilgangoora – Annual Report for the period 1 May 2018 to 30 April 2019, E45/02287, E45/02363, E45/03 |
| A120916 | 2019 | Pilbara Minerals Limited | Strelley | 23% | Annual Technical Report - Strelley Project (E45/4961) for the period 4 July 2018 to 3 July 2019 |
| A121647 | 2019 | Acme Pilbara Pty Ltd | Wallareenya | 18% | Annual Technical Report for Wallareenya E45/4909 for the period 31 August 2019 to 30 August 2019 |
| A116425 | 2018 | Venus Metals Corporation Limited | Pilgangoora | 21% | Annual Report for Pilgangoora Lithium -Tantalum Project - Tenement No. E45/4684 For the Period 2 February 2017 |
| A116426 | 2018 | Venus Metals Corporation Limited | Pilgangoora | 51% | Pilgangoora Project E45/04630 Annual Report for the period 06/02/2017 - 05/02/2018 |
| A116600 | 2018 | Altura Lithium Operations Pty Ltd | Pilgangoora | 33% | Pilgangoora – Annual Report C134_2011, 01 May 2017 to 30 April 2018 |
| A116830 | 2018 | Kairos Minerals Limited | Mount York | 50% | Mt York Annual Report C101/2017 For the Period 1 March 2017 to 28 February 2018, P45/02988, P45/02989, P45/029 |
| A117065 | 2018 | Pilbara Minerals Limited | Pilgangoora | 2.3% | C123/2002 Combined Annual Exploration Report, Pilgangoora Lithium-Tantalum Project for the period 24/04/2017 - |
| A118250 | 2018 | Kairos Minerals Limited | Mount York | <1% | Mount York P45/02998 Annual Report For the Period 4 May 2017 to 3 May 2018 |
| A114103 | 2017 | Pilbara Minerals Limited | Pilgangoora | 4.2% | Combined Annual Exploration Report, Pilgangoora Lithium-Tantalum Project For the Period 24 April 2016 to 23 Ap |
| A114170 | 2017 | Kairos Minerals Limited | Mount York | <1% | P45/2998 - Mount York Project Annual Technical Report for the period 04/05/2016 - 03/05/2017 |
| A114171 | 2017 | Kairos Minerals Limited | Mount York | 100% | Mount York P45/2995 – Annual Technical Report for the period 04/05/2016 - 03/05/2017 |
| A114172 | 2017 | Kairos Minerals Limited | Mount York | 100% | Mount York P45/2988 – Annual Technical Report For the Period 4 May 2016 to 3 May 2017 |
| A114173 | 2017 | Kairos Minerals Limited | Mount York | 100% | Mount York P45/2997 – Annual Technical Report For the Period 4 May 2016 to 3 May 2017 |
| A114174 | 2017 | Kairos Minerals Limited | Mount York | 100% | Mount York P45/2993 – Annual Technical Report for the period 04/05/2016 - 03/05/2017 |
| A114175 | 2017 | Kairos Minerals Limited | Mount York | 100% | P45/2992 – Annual Technical Report For the Period 4 May 2016 to 3 May 2017 |
| A115251 | 2017 | Atlas Iron Limited | Abydos | 14% | Final Surrender Report for E45/2899-I Abydos Project for the period 21 April 2007 to 20 April 2017 |
| A112767 | 2017 | Pilbara Minerals Limited | Lynas Find | 4.1% | Combined Annual Mineral Exploration Report C64/2016 for the Lynas Find Lithium Project C64/2016 for the period |
| A114041 | 2017 | Altura Lithium Operations Pty Ltd | Pilgangoora | 33% | C134/2011 Pilgangoora Project Combined Annual Report for the period 1 February 2016 to 30 April 2017, E45/0228 |
| A108766 | 2016 | Altura Exploration Pty Ltd | Pilgangoora | <1% | Exploration Licence 45/2287 and Prospecting Licence 45/2758 Combined Annual Report for the period 1st February |
| A108899 | 2016 | Altura Exploration Pty Ltd | Pilgangoora | 45% | Pilgangoora Exploration Licence 45/2363 Annual Report 1st May 2015 to 30th April 2016 |
| A109927 | 2016 | Dakota Minerals Limited | Lynas Find | <1% | Exploration Annual Report E45/3648 Lynas Find for the period 07/09/2015 to 06/09/2016 |
| A109405 | 2016 | Pilbara Minerals Ltd | Pilgangoora | 4.6% | Annual Mineral Exploration Report, Pilgangoora Project for the period 24 April 2015 to 23 April 2016. Combined |
| A108902 | 2016 | Altura Exploration Pty Ltd | Pilgangoora | 100% | Pilgangoora Exploration Licence 45/3488 Annual Report for the period 11th January 2015 - 10th January 2016 |
| A109653 | 2016 | Atlas Iron Limited | Abydos | 1.2% | ABYDOS PROJECT C40/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending |
| A105304 | 2015 | Fmg Pilbara Pty Ltd | Glacier Valley | 1.5% | Glacier Valley Project, Partial Surrender Report for the period 13/02/2012 to 19/12/2014, E45/2855. |
| A105312 | 2015 | Fmg Pilbara Pty Ltd | Turner River 5 | <1% | Final Surrender Mineral Exploration Report E45/2853 Turner River 5 for the period 13 February 2012 to 19 Decem |
| A105322 | 2015 | Fortescue Metals Group Ltd | Glacier Valley - Pinpin River 1 | 54% | Partial Surrender Mineral Exploration Report: E45/2854 (Pinpin River 1) Glacier Valley Project for the period |
| A105555 | 2015 | Altura Exploration Pty Ltd | Pilgangoora | <1% | Exploration Licence 45/2287 and Prospecting Licence 45/2758 Combined Annual Report for the period 1st February |
| A105939 | 2015 | Atlas Iron Ltd | Abydos | 9% | Abydos Project C40/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending |
| A106614 | 2015 | Fortescue Metals Group Ltd | Glacier Valley | 14% | C120/2008 Glacier Valley Final Surrender Report for the period 13/02/2012 to 11/05/2015 |
| A104729 | 2015 | Altura Exploration Pty Ltd | Pilgangoora | 100% | Pilgangoora Project E45/3488 Annual Report for the period 11/01/2014 - 10/01/2015 |
| A105066 | 2015 | Fortescue Metals Group Ltd | Glacier Valley | 11% | Combined Annual Report for the Period 1 December 2013 to 30 November 2014, C120/2008, Glacier Valley Project E |
| A106348 | 2015 | Pilbara Minerals Ltd | Pilgangoora | 4.6% | Pilgangoora Project, WA Annual Group Report C123/2002 24 April 2014 – 23 April 2015, [E45/2232, E45/2241, M45/ |
| A107316 | 2015 | Asgard Metals Pty Ltd | McPhee's - Pilgangoora | <1% | ANNUAL REPORT For the Period 6 September 2014 to 5 September 2015 MCPHEE'S - PILGANGOORA Mineral Exploration A |
| A101524 | 2014 | Fortescue Metals Group Ltd | Glacier Valley | 7.8% | Combined Report for the Period 1st December 2012 to 30th November 2013, C120/2008 Glacier Valley |
| A101798 | 2014 | Lithex Resources Ltd | Pilgangoora | <1% | Final Relinquishment Report E 45/3373 Pilgangoora For the Period 16 February 2010 to 7 February 2014. |
| A101850 | 2014 | Altura Exploration Pty Ltd | Pilgangoora | <1% | Pilgangoora Project, Annual Report for the period 01/02/2013 to 31/01/2014, e45/2287; P45/2758. [C134/2011] |
| A102322 | 2014 | Trafford Resources Ltd | Lynas Find | 22% | Combined Annual Mineral Exploration Report C348/2011, Lynas Find Project, for the period 01/04/2013 to 31/03/2 |
| A102356 | 2014 | Atlas Iron Ltd; Altura Mining Ltd | Abydos | 9.4% | Abydos Project, Annual Report for the period 01/05/2013 to 30/04/2014, E45/2308,2362-2363, 2728,2899, 3298, 33 |
| A103820 | 2014 | Asgard Metals Pty Ltd | McPhees | <1% | McPhees Project, Annual Report for the period 06/09/2013 to 05/09/2014, E45/3648. |
| A99558 | 2013 | Ascot Resources Ltd | McPhees | <1% | Mineral Exploration Annual Tenement Report E45/3648 McPhees Gold Project for the period 06/09/12 - 05/09/13 |
| A96750 | 2013 | Fortescue Metals Group Ltd | Glacier Valley | 9.1% | Glacier Valley Combined Report (Iron Bridge Project) C120/2008 Annual Report for the period 1st December 2011 |
| A98065 | 2013 | Altura Exploration Pty Ltd | Pilgangoor | 45% | Pilgangoor Project, Annual Report for the period 1st May 2012 to 30th April 2013, E45/2363. [C40/2007] |
| A98263 | 2013 | Global Advance Metals Pty Ltd | Pilgangoora | 4.6% | Pilgangoora Project, Annual Report for the period 24th April 2012 to 23rd April 2013, E45/2232 & 2241; M45/78, |
| A96559 | 2013 | Altura Exploration Pty Ltd | Pilgangoora | 100% | Exploration Licence 45/3488 Annual Report for the period 11th January 2012 to 10th January 2013 |
| A97778 | 2013 | Atlas Iron Ltd | Abydos | 14% | Abydos Project, Partial Surrender Report for the period 21/04/2007 to 20/04/2013, E45/2899. [C40/2007] |
| A97801 | 2013 | Altura Exploration Pty Ltd | Pilgangoora | <1% | Pilgangoora Project, Annual Report for the period 1st February 2012 to 31st January 2013, E45/2287; P45/2758. |
| A98064 | 2013 | Atlas Iron Ltd | Abydos | 8.8% | Abydos Project, Annual Report for the period ending 30th April 2013, E45/2308, 2362-2363, 2471, 2728, 2899, 32 |
| A98197 | 2013 | Lithex Resources Ltd | Pilgangoora | <1% | Pilgangoora Project, Annual Report for the period 1st March 2012 to 28th February 2013, E45/3373 & P45/2599. [ |
| A98484 | 2013 | Trafford Resources Ltd | Lynas Find | 22% | Combined Annual Mineral Exploration Report C348/2011, Lynas Find Project, for the period 01/04/2011 to 31/03/2 |
| A92951 | 2012 | Altura Mining Ltd | Pilgangoora | 100% | Pilgangoora E45/3488 Exploration Licence 45/3488 Annual Report 2012, 11th January 2011 - 10th January 2012 |
| A94018 | 2012 | Atlas Iron Ltd | Abydos | 6.4% | ABYDOS PROJECT C40/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period Ending |
| A93197 | 2012 | Fortescue Metals Group Ltd | Glacier Valley - Iron Bridge | <1% | Glacier Valley Annual Report for the period 1st December 2010 to 30th November 2011, E45/2510-1, E45/2535-1, a |
| A93481 | 2012 | Altura Mining Ltd | Pilgangoora | <1% | Exploration Licence 45/2287 and Prospecting Licence 45/2758 Combined Annual Report for the period 1st February |
| A93821 | 2012 | Lithex Resources Ltd | Pilgangoora | <1% | Combined Annual Report E 45/3373 & P45/2599 Pilgangoora for the period 1 March 2011 – 29 February 2012, C345/2 |
| A93939 | 2012 | Trafford Resources Ltd | Lynas Find | 22% | Combined Annual Mineral Exploration Report C348/2011, Lynas Find Project, for the period 01/04/2011 to 31/03/2 |
| A93980 | 2012 | Global Advance Metals Pty Ltd | Pilgangoora | 4.6% | Annual Report for the period 24th April 2011 to 23rd April 2012, Pilgangoora Project, C123/2002, E45/2232, E45 |
| A95262 | 2012 | Epic Resources Limited | McPhees | <1% | E45/3648 Annual Report for McPhees Gold Project for the period 01/09/11 to 31/08/12 |
| A90379 | 2011 | Global Advanced Metals Pty Ltd | Pilgangoora | 4.4% | Pilgangoora Project, Annual Report for the period 24th April 2010 to 23rd April 2011, E45/2232, E45/2241, E45/ |
| A90380 | 2011 | Atlas Iron Ltd | Abydos - Pilgangoora | 4.6% | Abydos - Pilgangoora Project, Annual Report for the period ending 23rd April 2011, E45/2232, E45/ 2241; M45/78 |
| A90513 | 2011 | Atlas Iron Ltd | Abydos | 7.1% | Abydos Project, Annual Report for the period ending 30th April 2011,E45/2362, 2363, 2404, 2471, 2728, 2765, 28 |
| A92146 | 2011 | Trafford Resources Ltd | Lynas Find | <1% | Lynas Find Project P45/2629, Annual Technical Report for the period 21/11/2008 to 21/11/2009 |
| A89460 | 2011 | Fortescue Metals Group Ltd | Glacier Valley | <1% | Annual report for the period 1st December 2009 to 30th November 2010, Glacier Valley Project, E45/3084, E45/2 |
| A90293 | 2011 | Lithex Resources Ltd | Pilgangoora | <1% | Annual Exploration Report E 45/3373 Pilgangoora For the Period Ending 15 February 2011, (Shaw River). |
| A90329 | 2011 | Trafford Resources Ltd | Lynas Find | 11% | Lynas Find Project, Annual Report for the period 13/02/2010 to 12/02/2011, E45/2375. (C207/2006) |
| A90488 | 2011 | Altura Exploration Pty Ltd | Pilgangoora | <1% | Pilgangoora Project, Annual Report for the period 20th April 2010 to 19th April 2011, E45/2287. |
| A92147 | 2010 | Trafford Resources Ltd | Lynas Find | <1% | Lynas Find Project P45/2629 Annual technical Report on exploration for the period 21/11/2009 to 21/11/2010 |
| A92145 | 2010 | Trafford Resources Ltd | Lynas Find | 100% | Lynas Find Project P45/2628 Annual Technical Report on Exploration for the period 21/11/2009 to 21/11/2010 |
| A87232 | 2010 | Trafford Resources Ltd | Lynas | 11% | Lynas Find Project Exploration Licence E45/2375 Annual Technical Report on Exploration for the period 13/02/20 |
| A87472 | 2010 | Atlas Iron Ltd | Abydos | 8.4% | Annual Report to the Department of Mines and Petroleum for the period 01/05/2009 to 30/04/2010 |
| A85855 | 2010 | Fortescue Metals Group Ltd | Glacier Valley | <1% | Annual report for the period 1 December 2008 to 30 November 2009, Glacier Valley Project, E45/3084, E45/2510 & |
| A86991 | 2010 | Altura Mining Ltd | Pilgangoora | <1% | Exploration Licence 45/2287 Annual Report 2010, Report Period: 20th April 2009 to 19th April 2010 |
| A87091 | 2010 | Talison Minerals Pty Ltd | Pilgangoora | 4.4% | Annual Report for the period 24th April 2009 to 23rd April 2010, Pilgangoora Project, C123/2002 |
| A87231 | 2010 | Trafford Resources Ltd | Lynas Find | 11% | Lynas Find Project Exploration Licence E45/2375 4th Year Partial Surrender Report of Hamersley Range 852 W & |
| A80926 | 2009 | Montezuma Mining Company Ltd | Pilgangoora | 11% | Annual Report on E45/2375, Pilgangoora Project, for the Period 13 February 2008 to 12 February 2009 |
| A80932 | 2009 | Fortescue Metals Group Ltd | Glacier Valley | <1% | Annual report for the period 8 August 2007 to 30 November 2008, Glacier Valley Project, E45/3084, E45/2510 & E |
| A81935 | 2009 | Montezuma Mining Company Ltd | Pilgangoora | 11% | Partial Surrender Report on E45/2375, Pilgangoora Project, For the Period 13 February 2006 to 12 February 2009 |
| A82526 | 2009 | Australian Tantalum Ltd | Pilgangoora | <1% | Annual Report For Exploration Lease E45/2287 for the period 20th April 2008 TO 19th April 2009 |
| A82658 | 2009 | Atlas Iron Ltd; Shaw River Resources Ltd | Abydos | 8.4% | Annual Report to the Department of Mines and Petroleum for the period 01/05/2008 to 30/04/2009 Tenements: E45 |
| A92144 | 2009 | Trafford Resources Ltd | Lynas Find | 100% | Lynas Find Project P45/2628 annual technical report on exploration for the period 21/11/2008 to 21/11/2009 |
| A77983 | 2008 | Montezuma Mining Company Ltd | Pilgangoora | 11% | Annual Report on E45/2375, Pilgangoora Project for the Period 13 Feb 2007 to 12 Feb 2008 |
| A78016 | 2008 | Australian Tantalum Ltd | Pilgangoora | <1% | ANNUAL REPORT FOR Exploration Lease E45/2287 FOR THE PERIOD 20th April 2007 TO 19th April 2008 Report Number : |
| A78704 | 2008 | Talison Minerals Ltd | Pilgangoora | 4.4% | PILGANGOORA PROJECT ANNUAL REPORT FOR THE PERIOD 24th April 2007 to 23rd April 2008 TENEMENT: C123/2002 GROUP, |
| A78725 | 2008 | Atlas Iron Ltd | Abydos | 8.4% | Annual Report to the Department of Industry and Resources Abydos for the period 01/05/07 to 30/05/08, TENEMENT |
| A80482 | 2008 | Trafford Resources Ltd | LYNAS FIND | 44% | LYNAS FIND PROJECT, PROSPECTING LICENCES P45/2557 – P45/2560 & P45/2562 – P45/2567, ANNUAL TECHNICAL REPORT ON |
| A82597 | 2008 | Atlas Iron Ltd | Abydos | 2.8% | Abydos Project C123/2002, E45/2232, E45/2241 and E45/2251Annual for the period 24/04/2008 to 23/04/2009 |
| A75309 | 2007 | Haddington Resources Ltd | Pilgangoora | <1% | Annual Report for Exploration Lease E45/2287, For the Period 20th April 2006 TO 19th April 2007. (Report No.E4 |
| A75311 | 2007 | Sons Of Gwalia Ltd | Pilgangoora | 11% | Pilgangoora Project, Annual Report for the period 11th September 2005 to 10th September 2006, M45/511. |
| A75373 | 2007 | Atlas Iron Ltd | Abydos | 6.4% | Annual Report for the Period 01/05/06 to 30/04/07 Tenements:E45/2362,E45/2363,E45/2404,E45/2471,E45/2594, E45/ |
| A75697 | 2007 | Sons Of Gwalia Ltd | Pilgangoora | 4.6% | Pilgangoora Project, Annual Report for the period 24th April 2006 to 23rd April 2007, E45/2241, M45/78, M45/33 |
| A76745 | 2007 | Trafford Resources Ltd | Lynas Find | 44% | LYNAS FIND PROJECT EXPLORATION LICENCES P45/2557 - P45/2560 & P45/2562 - P45/2567 ANNUAL TECHNICAL REPORT ON E |
| A74746 | 2007 | Sons Of Gwalia Ltd | Pilgangoora | 3% | Pilgangoora Project E45/2232, Annual Report for the Period 17 Nov 2005 to 16 Nov 2006. SOG Report No.2232-2006 |
| A74812 | 2007 | Montezuma Mining Company Ltd | Pilgangoora | 11% | Annual Report on E45/2375, Pilgangoora Project, For the Period 13 February 2006 to 12 February 2007 |
| A76752 | 2007 | Talison Pty Ltd | Pilgangoora | 11% | Pilgangoora Project, Annual Report for the period 11th September 2006 to 10th September 2007, M45/511. |
| A71916 | 2006 | Sons Of Gwalia Ltd | Pilgangoora | 4.6% | Pilgangoora Project, Annual Report for the period 24 April 2004 to 23 April 2005, E45/2241,M45/78,M45/333, Com |
| A73283 | 2006 | Sons Of Gwalia Ltd | Pilgangoora | 4.6% | Pilgangoora Project E45/2241,M45/78,333, Annual Report for the Period 24 April 2005 to 23 April 2006, Combined |
| A73865 | 2006 | Trafford Resources Ltd | Lynas Find | 44% | Lynas Find Project P45/2557-2560,2562-2567, Annual Technical Report on Exploration for the Period 14/10/2005 t |
| A68663 | 2004 | Sons Of Gwalia Ltd | Pilgangoora | 2.9% | Annual Report for the period 24/04/2003-23/04/2004 Pilgangoora Project(C123/2002), E45/2241, E45/2242 |
| A66675 | 2003 | Lynas Gold Nl | Lynas Find | 7.3% | Surrender Report May 2003 Lynas Find Project C264/1993 for the tenements M45/281-2, 523-4, P45/2229, 2338, 235 |
| A67020 | 2003 | Sons Of Gwalia Ltd | Pilgangoora | 2.9% | Pilgangoora Project, Annual Report for the period 24 April 2002 to 23 April 2003, C123/2002, E45/2241-2242. S |
| A67056 | 2003 | Sons Of Gwalia Ltd | Pilgangoora | 4.7% | Pilgangoora Project, Partial Surrender Report for the period 24 April 2002 to 24 June 2003, E45/2241. SOG Rep |
| A67065 | 2003 | Sons Of Gwalia Ltd | Pilgangoora | <1% | Pilgangoora Project, Surrender Report for the period14 February 2003 to 28 May 2003, E45/2307. SOG Report No. |
| A63518 | 2001 | De Beers Australia Exploration Ltd | Carlindi | 15% | Annual Report for Exploration Licences 45/2195 - 45/2200. |
| A57800 | 1999 | Sipa Resources Ltd | Panorama | 5.2% | SurrenderReport E45/825,1040,1207,1288,1290,1291,1351,1384,1423,1438,1478,1479,1564,1575,1592,1593,1646, 2029 |
| A54854 | 1998 | Lynas Gold Nl | Lynas Find | 21% | Lynas Find Project Annual Report For The Tenemj!nts M45/278, 281, 282, 355, 356, 464, 511, 523 - 525, P45/233 |
| A55428 | 1998 | Lynas Gold Nl | Pilgan | <1% | Pilgan Project, Annual Report M45/39, 77, 78, 300, 323, 324, 333, 334, 335 and 397 for period 25th February 19 |
| A55500 | 1998 | Lynas Gold Nl | Panorama / Lynas East | 10% | Lynas East JV Annual Report for the Tenements E45/1207, 1288, 1290, 1423, & 1438 for the period 1st January 19 |
| A49963 | 1997 | Lynas Gold Nl | Lynas Find | 21% | Lynas Find Project Annual report for the tenements M45/278 M45/281 M45/282 M45/355 M45/356 M45/464 M45/511 M45 |
| A53154 | 1997 | Lynas Gold Nl | Lynas Find | 76% | Lynas Find Project, Annual Report for the period 02/10/1996 to 01/10/1997, E45/1283. |
| A53743 | 1997 | Sipa Resources Ltd | Panorama | 17% | Dept of Minerals and Energy E45/1288 &1290 Partial Surrender Report Pincunah Exploration Area, Panorama Proje |
| A50546 | 1997 | Lynas Gold Nl | Lynas East | 10% | Lynas East (JV) Project, Annual Report for the Tenements E45/1207, 1288, 1290, 1423 & 1438 for the period 1st |
| A50712 | 1997 | Lynas Gold Nl | Lynas Find | 6.2% | Lynas Find Project ,Annual report for the tenements E45/1616 15th February 1996 to 14th February 1997. |
| A50883 | 1997 | Lynas Gold Nl | Lynas Find | <1% | Lynas Find Project, (Pilgan Joint Venture) Annual Report M45/39, 77,78,300, 323, 324, 333, 334, 335, & 397 for |
| A49588 | 1996 | Lynas Gold Nl | Lynas Find | 76% | Lynas Find Project E45/1283 Annual Report |
| A47225 | 1996 | Lynas Gold Nl | Lynas East | 10% | Lynas East Gold Exploration Project, Annual Report 1995, Tenements E45/1288, 1290, 1423, 1438 AND 1207. |
| A47226 | 1996 | Sipa Resources Ltd | Panorama | 10% | Panorama Project, Annual Report Overing the Period 1 January 1995 to 31 December 1995, Tenements E45/1207, 128 |
| A47404 | 1996 | Lynas Gold Nl | Lynas Find | 26% | Annual report for 1995 for Tenements M45/278 M45/281 M45/282 M45/355 M45/356 M45/464 M45/511 M45/523 M45/524 M |
| A48123 | 1996 | Lynas Gold Nl | Lynas Find | 1.5% | Lynas Find Project ,Exploration Licence E45/1577 Annual report for the period 02/06/1995 to 01/06/96 |
| A48323 | 1996 | Lynas Gold Nl | Lynas Find | 76% | Lynas Find Project, Annual Report for the period 02/10/1994 to 02/10/1995, E45/1283. |
| A43237 | 1995 | Lynas Gold Nl | Lynas Find | 33% | Lynas Find Project, Annual Report M45/278, 282, 355, 356, 464, 523, 524, & 525, December 1994. |
| A45049 | 1995 | Sipa Resources Ltd | Panorama / Pincunah | 11% | Panorama / Pincunah Project, 1994 Annual Report on the Pincunah Exploration Area, Panorama Project (covering t |
| A44305 | 1995 | Sipa Exploration Nl | McDonalds | 100% | McDonalds Project, 1994 Annual Report P45/2228 for the period ending 17th December 1994. |
| A47224 | 1995 | Lynas Gold Nl | Lynas Find | 100% | Lynas Find Project, Old Faithful, Annual Report 1995. |
| A41344 | 1994 | Sipa Resources Ltd | Panorama - Pincunah | 11% | Panorama - Pincunah Project, Annual Report for the period 27th November 1992 to 31st December 1993, E45/971, 1 |
| A43107 | 1994 | Lynas Gold Nl | Lynas Find | 76% | Lynas Find Project,Annual Report E45/1283 for period 01/12/1993 to 01/12/1994. |
| A38897 | 1993 | Lynas Gold Nl | Pilbara Gold | 43% | R Report for the period 03/93 Pilbara Gold Project M45/278,280-282,511,523-525 |
| A39176 | 1993 | Sipa Resources Ltd | Panorama - Pincunah | 16% | Panorama - Pincunah Project, Annual Report for the period 27th November 1991 to 26th November 1992, E45/971,12 |
| A39949 | 1993 | Mim Exploration Pty Ltd | McPhees Cairn | 100% | McPhees Cairn Project, Annual Report for the period to 17th December 1993, P45/2228. |
| A38526 | 1993 | Mim Exploration Pty Ltd | McPhees Cairn | 100% | McPhees Cairn Project, 1992 Annual Report, June 1993, P45/2228. |
| A39844 | 1993 | Lynas Gold Nl | Lynas Find | 76% | Lynas Find Project, Annual report for the period 01/01/1993 to 31/12/1993, E45/1238. |
| A34837 | 1992 | Mim Exploration Pty Ltd | McPhee's Hill | 7.7% | McPhee's Hill Project, Annual Report for year ending December 1991, P45/1462 ( Now MLA 45/526), M45/501. |
| A37339 | 1992 | Lynas Gold Nl | Lynas Find | 61% | Report for the period 01/03/92 - 01/06/92 Lynas Find Project M45/278,281-282,511,523-525, P45/2229, E4 5/1283 |
| A36474 | 1992 | Mim Exploration Pty Ltd | McPhees Cairn | 100% | McPhees Cairn Project,1991 Annual Report, June 1992, M45/280. |
| A37185 | 1992 | Mim Exploration Pty Ltd | McPhee's Hill | 8.8% | McPhee's Hill (JV) Project, Annual Report for the period to October 1992, M45/501 & M45/526. |
| A37340 | 1992 | Lynas Gold Nl | Lynas Find | 61% | LYNAS FIND, PILBARA, W .A. INTERIM REPORT FOR THE PERIOD I JULY - OCTOBER, 1992 I VOLUME I (M45/278, 281-282 |
| A34835 | 1991 | Mim Exploration Pty Ltd | Mali | 100% | Mali Project, Annual Report for the period 16/06/1990 to 15/06/1991, P45/1916. |
| A33048 | 1991 | Carpentaria Exp Co Pty Ltd | McPhees Cairn | 100% | McPhees Cairn Project, 1990 Annual Report, February 1991, M45/280. |
| A34418 | 1991 | Lynas Gold Nl | Lynas Find | 39% | Lynas Find Project, Non-statutory Report:Exploration Report, February 1991, M45/278,281 & 282; P45/1412-1413, |
| A31704 | 1990 | Pilgan Mining Pty Ltd | Pilgangoora | <1% | Pilgangoora Project, Annual Report, October 1990, Combined Reporting No: CR 123/2002. ( Pilgangoora Tantalite |
| A31602 | 1990 | Lynas Gold Nl | Lynas Find | 55% | Lynas Find Project, Final Surrender Report, July 1990, E45/967. |
| A31777 | 1990 | Carpentaria Exp Co Pty Ltd | Mali | 100% | Mali Project, Non-statutory Report: Surrender Report on the work conducted by Carpentaria Exploration Co Pty L |
| A31961 | 1990 | Carpentaria Exp Co Pty Ltd | Pilgan Project | 1.3% | Pilgan Project, Final Surrender Report for the period March 1989 to October 1990, M45/77,78,324,333-335 & 397. |
| A32391 | 1990 | Carpentaria Exp Co Pty Ltd | McPhee's Hill | 8.8% | McPhee's Hill (JV) Project, Annual Report to December 1990, P45/1462, M45/501. |
| A30417 | 1990 | Carpentaria Exp Co Pty Ltd | McPhees Cairn | 100% | McPhees Cairn Project, Non-statutory Report:Report on the work conducted by Carpentaria Exploration Company Lt |
| A31018 | 1990 | Lynas Gold Nl | McPhee's Patch South | 47% | Exploration Report on Reverse Circulation Percussion Drilling at McPhee's Patch South, Mining lease M45/282 an |
| A31491 | 1990 | Lynas Gold Nl | Iron Stirrup | 100% | Non-statutory Report:R Report for 1989; M45/278) Pre-feasibility Study for a Gold Processing Plant for the Iro |
| A31776 | 1990 | Carpentaria Exp Co Pty Ltd | Mali | 100% | Mali Project, 1989/1990 Annual Report, October 1990, |
| A27169 | 1989 | Carpentaria Exp Co Pty Ltd | Green Well | 57% | Green Well, E45/606, Progress Report to February 1989. |
| A27293 | 1989 | Lynas Gold Nl | Pommy Well | 100% | Final Report, Exploration Licence 45/820, Pommy Well. |
| A27571 | 1989 | Carpentaria Exp Co Pty Ltd | Pilgan | 1.3% | Pilgan Project, Annual Report for the period ending 28/02/1989, M45/77-78, 324, 333-335 & 397. [C123/2002] |
| A29685 | 1989 | Lynas Gold Nl | Lynas Find | 39% | Lynas Find Project,Annual Report for the period 01/01/1989 to 31/12/1989, M45/278,281 & 282 ; P45/1412, P45/1 |
| A36497 | 1989 | Carlindi Mining Corp Nl | Lalla Rookh | 100% | [ Lalla Rookh Gold Exploration, Non-statutory report, M45/461, P45/1036 ] |
| A27823 | 1989 | Lynas Gold Nl | Lynas Find | 25% | Lynas Find Project, Annual report 1988 on M45/278, M45/281, M45/282, P45/1412, P45/1413, P45/1481, P45/1482, |
| A28243 | 1989 | Pilgan Mining Pty Ltd | Pilgangoora | <1% | Development Proposal, Pilgangoora, March 1989. |
| A28919 | 1989 | Lynas Gold Nl | Pilgangoora - Lynas Find | 31% | Non-statutory Report : Regional Assessment Pilgangoora District Central Pilbara WA (1989) M45/54, M45/278, M45 |
| A29865 | 1989 | Lynas Gold Nl | Lynas Find - Iron Stirrup | 61% | Lynas Find -Iron Stirrup Project, Non-statutory Report: Insitu Gold Resource Estimation at the Iron Stirrup Pr |
| A23913 | 1988 | Lynas Gold Nl | Lynas Find | 72% | Lynas Find Project, -1987 Annual Report . P45/193-194, 241-242, 278, 449-451, 632. M45/54 , February 1988. |
| A27312 | 1988 | Lynas Gold Nl | Pilgangoora | 14% | Non-statutoryReport on Stream Sediment Sampling in Pilgangoora Area, East Pilbara District, W.A. P45/1412 and |
| A27249 | 1988 | Lynas Gold Nl | Pilgangoora | 12% | Non-statutory Report ; Stream Sediment Sampling. Pilgangoora Area East Pilbara District W.A. 12/1988 P45/148 |
| A19763 | 1987 | Clackline Refractories Ltd | Lynas Find | 48% | Non-statutory Report: Report on Geochemical Exploration at the Lynas Find Project Report for P45/449 to P45/45 |
| A17099 | 1986 | Pancontinental Mining Ltd | Pilgangoora | <1% | Annual report Pilgangoora E45/361 and M45/646 (1985) Pancontinental Mining Ltd |
| A18530 | 1986 | Clackline Refractories Ltd | McPhee's Cairn | 91% | Annual Report on PL45/188 McPhee's Cairn Project, Lynas Find Gold` Prospect Western Australia (1986) |
| A18659 | 1986 | Clackline Refractories Ltd | Lynas Find | 98% | Lynas Find Project, Annual Report for the period 01/11/1985 to 01/08/1986, M45/54; P45/241 & 242.[Iron Stirrup |
| A18529 | 1985 | Clackline Refractories Ltd | Lynas Find | 74% | Lynas Find Project, Non-statutory Report, December 1985 PL45/188 PL45/193 PL45/194 PL45/241 PL45/242 PL45/278 |
| A13108 | 1983 | Metana Minerals Nl | Pincunah | 1.1% | Pincunah Project, Final Surrender Report, August 1983, P45/37-43; E45/38. |
| A19207 | 1983 | Pancontinental Mining Ltd | Pilgangoora - Paynes Find - Yinnietharra | <1% | An evaluation of the rare-metal potential of pegmatites at the Pilgangoora, Paynes Find, Yinnietharra, Wodgina |
| A11368 | 1982 | International Nickel Aust Ltd | McPhees | 100% | McPhees Project, Non- Statutory Report : Annual Report for the period 01/01/1982 to 31/12/1982, TR70/8275-8260 |
| A10303 | 1981 | Amax Iron Ore Corporation | McPhees Patch | 53% | McPhees Patch Project, Final Surrender Report, September 1981, GML45/1576-78 & MC45/9498. |
| A5570 | 1975 | Esso Exploration Aust Inc | McPhee | 54% | Annual report for period ending March 1975, McPhee Claims, MC45/7251 ... 45/7698-7702 [Plates 7-30 see A5571] |
| A5571 | 1975 | Esso Exploration Aust Inc | McPhee | 54% | Annual report [non-statutory] for period ending March 1975, McPhee Claims, MC45/7251 ... 45/7702 [Plates 7-30, |
| A5561 | 1975 | Esso Australia Ltd | Chinnamon Creek | 27% | Chinnamon Creek, Annual report [non-statutory] for period ending 16th March 1975, Temporary Reserve 5723H [ TR |
| A5637 | 1975 | Esso Australia Ltd | Chinnamon Creek | 1.6% | Chinnamon Creek Claims, Annual report for Period ending March 1975, MC45/6922 ... 45/7048 |
| A5195 | 1974 | Esso Australia Ltd | Chinnamon Creek | 27% | TR70/5723, Chinnamon Creek Project, Quarterly report [non-statutory] for the period ending August 16th 1974 |
| A4517 | 1974 | Esso Australia Ltd | Chinnamon Creek | 27% | Chinnamon Creek Project, Annual Report for the period ending 16th March 1974, TR70/5723H. |
| A5476 | 1974 | Esso Australia Ltd | Chinnamon Creek | 27% | Temporary Reserve 5723H [ TR70/5723 ], Chinnamon Creek, Quarterly report [non-statutory] for period ending 16t |
| A3663 | 1973 | Consolidated Gold Fields Aust Ltd | Pilgangoora | 57% | Pilgangoora (JV) Project, Final Surrender Report, March 1973, TR70/4931H; MC45/4974, 6527-6547. |
| A3664 | 1973 | Consolidated Gold Fields Aust Ltd | Pilgangoora | 57% | Pilgangoora Project, Final Surrender Report, (Appendix), March 1973, TR70/4931H; MC45/4974, 6527-6547. |
| A893 | 1971 | Mcintyre Mines (Aust) Pty Ltd | Pilgangoora | 58% | Pilgangoora Project, Annual (Progress) Report for the period ending 31/12/1970, ( Field Season) TR70/4931H. |
| A894 | 1971 | Mcintyre Mines (Aust) Pty Ltd | Pilgangoora | 58% | Pilgangoora Project, Non-statutory Report: Plans to accompany A893, for the period ending 31/12/1970, TR70/49 |
| A892 | 1970 | Mcintyre Mines Pty Ltd | Pilgangoora | 58% | Pilgangoora Project, Annual Report for the year ending 31/12/1969, TR70/4931H. |
| A3205 | 1970 | Pickands Mather & Co Int | Pilgangoora -Valley of Gossans | 2% | Pilgangoora -Valley of Gossans Project, Non-statutory Report: Report on the Diamond Drilling Programme for jue |
| A3204 | 1969 | Pickands Mather & Co Int | Valley of Gossans - Pilgangoora | 2% | Valley of Gossans - Pilgangoora Project, Non-statutory Report: Interim Exploration Report, August 1969, MC5/13 |
| A40993 | 1753 | Lynas Gold Nl | Lynas Find | 26% | Annual report for the period 01/93-12/93 Lynas Find Project M45/278 M45/281-282 M45/355-356 M45/464 M45/511 M4 |
| A102445 | 1753 | Global Advance Metals Pty Ltd | Pilgangoora | 4.6% | Annual Report for the period 24th April 2013 to 23rd April 2014, Pilgangoora Project, C123/2002 |
| A136148 | Pilbara Minerals Limited | pXRD analysis GSWA - PLSEIS001 | 1.6% | pXRD analysis GSWA - PLSEIS001 | |
| A149380 | Terra Petrophysics Pty Ltd | <1% | Core Library Sampling Of Drillholes C3DD024, PLSEIS001 And KDD002 For Petrophysics |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over L 45/453 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold L 45/453? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.