M 37/531
M 37/531 is a live mining lease in the Shire of Leonora, Western Australia, held by Newmont Yandal Operations Pty Ltd and Genesis Minerals (Leonora) Pty Ltd (part of Genesis Minerals Limited). Granted on 12 Nov 1999 for 21 years (renewed), it expires on 11 Nov 2041. The ground is covered by 98 historical WAMEX reports.
Register summary
- Holders
- Newmont Yandal Operations Pty Ltd, Genesis Minerals (Leonora) Pty Ltd
- Part of
- Genesis Minerals Limited (ASX:GMD) as at 2026-06-30
- Local government
- Shire of Leonora
- Application received
- 5 May 1995
- Commenced
- 12 Nov 1999
- Expiry
- 11 Nov 2041
- Term
- 21 Years (Renewed)
The full record on M 37/531
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 5 changes of holder
- The full record: 28 years of expenditure, 47 conditions and 4 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (16 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A147947 | 2025 | Ozz Resources Limited | Leonora | 5.1% | Partial Surrender Report for Exploration Licence E37/1355 Leonora Project for the period 8 February 2019 to 20 |
| A135098 | 2023 | Fortescue Metals Group Ltd | Tarmoola | 11% | Tarmoola C39/2020 Combined Final Surrender Reportperiod ending 27/03/2023. E 37/1379,E 37/1380,E 37/1381 |
| A134471 | 2023 | Fmg Resources Pty Ltd | Tarmoola | 11% | C39/2020 (Tarmoola) Annual Mineral Exploration Report for the period ending 06/02/2023. E 37/1380,E 37/1381,E |
| A130122 | 2022 | Fortescue Metals Group Ltd | Tarmoola | 11% | Tarmoola Annual C39/2020 for the period ending 06/02/2022. |
| A126676 | 2021 | Fmg Resources Pty Ltd | Tarmoola | 11% | Tarmoola Project Annual Mineral Exploration Report [C39/2020] for the period ending 06/02/2021 |
93 more reports
| A123220 | 2020 | Round Oak Jaguar Pty Ltd; Round Oak Jaguar Project Pty Ltd | Teutonic Bore Project | 1% | Combined Annual Report 2019 Teutonic Bore Project C/157/2002 for the period 1 January 2019 to 31 December 2019 |
| A125691 | 2020 | St Barbara Limited | Gwalia | 2.3% | Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2019 to 30 September |
| A122153 | 2019 | St Barbara Limited | Gwalia | 2.1% | Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2018 to 30 September |
| A120854 | 2019 | Sammy Resources Pty Ltd | Teutonic Bore | 12% | Final Surrender Report E37/01037 Teutonic Bore Project for the period 23 July 2010 to 19 July 2019 |
| A119556 | 2019 | Round Oak Jaguar Project Pty Ltd; Round Oak Jaguar Pty Ltd | Teutonic Bore | 1% | C157/2002 Combined Annual Report for Teutonic Bore Project for the period 1 January 2018 to 31 December 2018 |
| A121326 | 2019 | Anglo Australian Resources Nl | Leonora | 3.5% | Annual Report for C196/2010 'Leonora' Project for the period 2 August 2018 to 1 August 2019, E37/01287, E37/01 |
| A115994 | 2018 | Independence Group Nl | Teutonic Bore | 1% | Combined Annual Report C157/2002 Teutonic Bore Project for the period from 1st January 2017 to 31st December 2 |
| A117767 | 2018 | Kopore Metals Limited | TEUTONIC | 12% | ANNUAL EXPLORATION REPORT TEUTONIC PROJECT E37/1037, 23 JULY 2017 - 22 JULY 2018 |
| A118601 | 2018 | St Barbara Limited | Gwalia | 2.1% | Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2017 to 30 September |
| A112037 | 2017 | Independence Group Nl | Teutonic Bore | 1% | Combined Annual Report on C157/2002 Teutonic Bore Project for the period 1 January 2016 to 31 December 2016 |
| A114524 | 2017 | Metallum Limited | Teutonic | 12% | Annual Mineral Exploration Report Teutonic Project E37/01037 for the period 23 July 2016 to 22 July 2017 |
| A115512 | 2017 | St Barbara Limited | Gwalia | 2.1% | Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2016 to 30 September |
| A108571 | 2016 | Metallum Ltd | Teutonic | 12% | Metallum Ltd, Final Drilling Report, Mustang Prospect, Teutonic Project, E37/1037 (Round 10) |
| A109886 | 2016 | Metallum Limited | Teutonic | 12% | Annual Exploration Report - Teutonic Project E37/01037 For the Period 23 July 2015 to 22 July 2016 |
| A110551 | 2016 | St Barbara Limited | Gwalia | 2.1% | Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2015 to 30 September |
| A107737 | 2016 | Independence Group Nl | Teutonic Bore | 1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2015 to 31 December 2015 |
| A110324 | 2016 | Anglo Australian Resources Nl | Leonora | 3.1% | LEONORA PROJECT E37/1047 PARTIAL SURRENDER REPORT FOR THE PERIOD 02/08/2010 TO 01/08/2016 |
| A105028 | 2015 | Independence Group Nl | Teutonic Bore | 1.2% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2014 to 31 December 2014, |
| A107603 | 2015 | St Barbara Limited | Gwalia | 1.9% | Gwalia Project C55/2004 Combined Annual Report for the Period 1 October 2014 to 30 September 2015 |
| A106676 | 2015 | Metallum Ltd | Teutonic | 12% | Annual Exploration Report Teutonic Project E37/1037 for the period 23rd July 2014 to 22nd July 2015 |
| A101281 | 2014 | Independence Group Nl | Teutonic Bore | 1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2013 to 31 December 2013, |
| A103291 | 2014 | Metallum Ltd | Teutonic | 12% | Annual Exploration Report Teutonic Project E37/1037 for the period 23nd July 2013 to 22st July 2014 |
| A103690 | 2014 | Anglo Australian Resources Nl | Leonora | 3.1% | Leonora Project E37/1047 Final Report Co-funded Government – Industry Diamond Drilling Program DAG2013/0020757 |
| A103827 | 2014 | Anglo Australian Resources Nl | Leonora | 2.3% | Leonora Project, Annual Report for the period 02/08/2013 to 01/08/2014, E37/1047, 1056, 1114 & 1115; P37/8355- |
| A104225 | 2014 | St Barbara Ltd | Gwalia | 3.8% | Annual Mineral Exploration Report - DMP Combined Reporting Group C55/2004 (Gwalia) Reporting Period 1 October |
| A97747 | 2013 | Independence Group Nl | Teutonic Bore | 1% | Combined Annual Report on C157/2002, Teutonic Bore Project, for the period 1 January 2012 to 31 December 2012, |
| A100342 | 2013 | St Barbara Ltd | Gwalia | 3.8% | Annual Mineral Exploration Report - DMP Combined Reporting Group: C55/2004 Gwalia Project Reporting Period: 1 |
| A98608 | 2013 | Independence Group Nl | Teutonic Bore | 1% | Teutonic Bore Project, Annual Report for the period 1st January 2012 to 31st December 2012, E37/258........E37 |
| A99133 | 2013 | Mining Group Ltd | Teutonic | 12% | Annual Exploration Report Teutonic Project E37/1037 for the period 23nd July 2013 to 22st July 2013 |
| A100009 | 2013 | Anglo Australian Resources Nl | Leonora | 2.4% | Leonora Project (C196/2010) E37/1047, 37/1056, E37/1114 and 37/1115 Combined Annual Report for the Period 2 Au |
| A96105 | 2012 | St Barbara Ltd | Gwalia | 1.9% | Gwalia Project, Annual Report for the period 1st October 2011 to 30th September 2012, E37/896, 918-919; M37/17 |
| A93519 | 2012 | Jabiru Metals Ltd | Teutonic Bore | 1% | Teutonic Bore Project Combined Annual Report C157/2002 for the period 1st January 2011 to 31st December 2011 |
| A94674 | 2012 | Mining Group Ltd | Teutonic | 12% | Annual Exploration Report Teutonic Project E37/1037 for the period 23nd July 2011 to 22st July 2012 |
| A95473 | 2012 | Anglo Australian Resources Nl | Leonora | 2.4% | Leonora Project, Annual Report for the period 02/08/2011 to 01/08/2012, E37/1047 & 1056 & 1114-1115. [C196/201 |
| A89039 | 2011 | St Barbara Ltd | Gwalia | 1.5% | Gwalia Project C55/2004 Annual Report for the Period 1 October 2009 to 30 September 2010 |
| A91750 | 2011 | Anglo Australian Resources Nl | Leonora | 2.5% | Combined Annual Report for the Period 2 Aug 10 to 1 Aug 11, Leonora Project – C196/2010 |
| A92197 | 2011 | St Barbara Mines Ltd | Gwalia | 1.7% | Gwalia Project Annual Report for the Period 1 October 2010 to 30 September 2011 (C55/2004) |
| A91039 | 2011 | Mining Group Ltd | Teutonic | 12% | Annual Exploration Report, Teutonic Project E37/1037 for the period 23nd July 2010 to 22st July 2011 |
| A86682 | 2010 | Hawthorn Resources Limited | Mount George | <1% | Exploration Licence E37/536 Mt George Final Surrender Report for the period 16 November 2007 to 1 February 201 |
| A84149 | 2009 | Teck Australia Pty Ltd | Pumping Station JV | 3.6% | Final Surrender Report – E37/792, Pumping Station JV Project, 30th November 2005 to 4th June 2009 |
| A85286 | 2009 | St Barbara Ltd | Gwalia | 1.6% | Gwalia Project C55/2004, Annual Report for the Period 1 October 2008 to 30 September 2009, E37/789, E37/918-91 |
| A81895 | 2009 | Hawthorn Resources Limited | Mt George | <1% | E37/536 – Mt George ANNUAL REPORT FOR THE PERIOD 16 November 2007 TO 15 November 2008 |
| A85015 | 2009 | St Barbara Ltd | Argus | 7.2% | Partial Surrender Report for the period 2 September 2005 to 1 September 2009 |
| A76878 | 2008 | St Barbara Ltd | Gwalia | 3.4% | Gwalia project, Annual report for the period 1 October 2006 - 30 September 2007 (C55/2004) |
| A73969 | 2007 | St Barbara Ltd | Gwalia | 3.6% | Gwalia Project, Annual Report for the Period 1 October 2005 to 30 september 2006, Combined Reporting No. C55/2 |
| A74606 | 2007 | Teck Cominco Australia Pty Ltd | Braemore | 3.6% | Annual Report E37/792 Braemore Project 30th November 2005-29th November 2006 |
| A71746 | 2006 | St Barbara Mines Ltd | Harbour Lights / Gwalia | 3.5% | Gwalia Project, Annual Report for the period 1 October 2004 - 30 September 2005, Combined Reporting No. C055/2 |
| A69841 | 2005 | Sons Of Gwalia Ltd | Gwalia | 4.7% | Annual report for the period 01/07/03 - 30/09/04 Gwalia Project, C55/2004, E37/269, M37/17, M37/25, M37/46, M3 |
| A68325 | 2004 | Sons Of Gwalia Ltd | Gwalia | 9.2% | GSWA Gwalia Project Expiry Report for C162/1997 E37/223 Repo rt No. 0265-2004-01 |
| A66851 | 2003 | Sons Of Gwalia Ltd | Sandy Soak | 8.4% | Sandy Soak (JV) Project,Annual Report for the period 1 January 2002 to 31 December 85,531,223 |
| A66886 | 2003 | Sons Of Gwalia Ltd | Argus | <1% | Argus Project, Surrender Report for E37/416, 2 May 2000 to 4 March 2003ect Group C113/1999:E37/416 Report No.0 |
| A67733 | 2003 | Sons Of Gwalia Ltd | Sandy Soak | 8.4% | Sandy Soak JV Project, Annual Report for the period 01/01/2003- 31/12/2003 C162/1997, M37/485, M37/531, E37/2 |
| A64936 | 2002 | Sons Of Gwalia Ltd | Argus | <1% | 2001/02 Annual Report For Period 01/04/01 to 31/03/02 Group Reporting No. C113/1999 E37/415, E37/416, E37/557, |
| A65588 | 2002 | Sons Of Gwalia Ltd | Irwin Well | <1% | Irwin Well Project Annual Report For The Period 27 October 2001 - 26 October 2002. (E37/239, M37/491) Group C1 |
| A61953 | 2001 | Sons Of Gwalia Ltd | Sandy Soak | 8.4% | Sandy Soak JV Project, Annual Report for the period 1 January 2000 - 31 December 2000,E37/223, M37/485, M37/53 |
| A63380 | 2001 | Pacmin Mining Corporation Ltd | Argus | <1% | 2000/01 Annual Report Argus Project Area E37/344, E37/415, E37/416, E37/557, E37/558, M37/338, M37/398, M37/39 |
| A61111 | 2000 | Sons Of Gwalia Ltd | Sandy Soak | 8.4% | Sandy Soak JV Project, Annual Report for the Period 01/01/1999 to 31/12/1999, E37/223, M37/485, M37/531. |
| A61596 | 2000 | Sons Of Gwalia Ltd | Irwin Well | <1% | Irwin Well Project Annual Report for the period 27 October 1999 - 26 October 2000, (E37/239, E37/377. M37/491) |
| A57128 | 1999 | Golden State Resources Nl | Mertondale | <1% | Leonora (Dodger Well) Project E37/243, E37/335 and P37/4278 to 4284 inclusive, Annual Report for the Period 27 |
| A58880 | 1999 | Sons Of Gwalia Ltd | Sandy Soak | 8.4% | Sandy Soak JV Project, Annual report for the period 1 January 1998 - 31 December 1998, (E37/223,P37/3799-3803, |
| A53419 | 1998 | Tarmoola Australia Pty Ltd | Mount Newman | <1% | Mount Newman Project, Annual Exploration Report E37/235, 293, 244, 245, M37/458-460, P37/3995, 5010 etc. 30/09 |
| A53849 | 1998 | Tarmoola Australia Pty Ltd | Mount Newman | <1% | Mount Newman Project - Annual Exploration Report E37/235, 293, 344, 345, M37/458-460, P37/3995, 5010 etc. 30/0 |
| A54127 | 1998 | Golden State Resources Nl | Leonora/ Pepper | <1% | Leonora Project ("Pepper Prospect") E37/335 Third Year Partial Surrender Report (Ref M8082/1). |
| A54339 | 1998 | Sons Of Gwalia Ltd | Sandy Soak | 8.1% | Sandy Soak J.V. Project Annual Report, 01/01/97 - 31/12/97 E37/223, P37/3799-3803 |
| A55549 | 1998 | Golden State Resources Nl | Leonora / "Dodger Well" | <1% | Leonora Project ("Dodger Well') E37/243, 335, and P37/4278 to 4284 inclusive, Annual Report (Ref M8082/1) for |
| A50159 | 1997 | Mt Edon Gold Mines Aust Ltd | Mount Newman | <1% | Mount Newman Project E37/235 E37/293 E37/344 E37/345 M37/458 to M37/460 P37/3995 P37/5010 to P37/5015 P37/5114 |
| A50363 | 1997 | Sons Of Gwalia Ltd | Sandy Soak | 8.4% | Leonora Region Sandy Soak Annual report for the period 1 January 1996 to 31 December 1996 Tenementts E37/223 P |
| A53230 | 1997 | Sons Of Gwalia Ltd | Irwin Well | <1% | Irwin Well Project Annual Report for the period 27/10/1996 to 26/10/1997 (E38/239, E37/377) |
| A53306 | 1997 | Golden State Resources Nl | Leonora ("Dodger Welll") | <1% | Leonora Project ("Dodger Well") E37/243, 335, and P37/4278 to 4284 inclusive Annual Report ( Ref M8082/1) for |
| A49799 | 1996 | Sons Of Gwalia Ltd | Irwin Well | <1% | Irwin Well Project, Annual Report for the period 27/10 /1995 to 26/10/1996 (E37/239, E37/377) |
| A47444 | 1996 | Sons Of Gwalia Ltd | Sandy Soak | 8.4% | Leonora Region Sandy Soak Annual report for the period 1 January 1995 to 31 December 1995 Tenements E37/223 P3 |
| A46313 | 1995 | Sons Of Gwalia Ltd | Irwin Well | <1% | Irwin Well Project, Annual Report for the period 27/10 /94 to 26/10/1995 (E38/239, E37/377, M37/491) |
| A43692 | 1995 | Mt Edon Gold Mines Nl | Tarmoola | <1% | Summary of exploration Tarmoola exploration areas Argus, Mount Davis, Mount Newman & Kurrajong Prospects, Moun |
| A43865 | 1995 | Hunter Resources Ltd | Sandy Soak | 8.4% | Leonora region Sandy Soak annual report for the period 1st January 1994 to 31st December 1994 |
| A44752 | 1995 | North Ltd | Pepper | <1% | Pepper Project, Annual Report for Exploration Licence E37/335 (Pepper) for the year ending 25/03/1995.(Leonora |
| A46346 | 1995 | Sons Of Gwalia Ltd | Sandy Soak | 9.2% | Sandy Soak. Report on portion of E37/223.Surrendered 15/05/95 |
| A46488 | 1995 | Golden State Resources Nl | Leonora | <1% | Leonora ("Dodger Well") Project, Annual Report E37/243, E37/335 & P37/4278-4284 inclusive for the period 27th |
| A49771 | 1995 | Golden State Resources Nl | Leonora | <1% | Leonora Project ("Dodger Well:) E37/243, 335, 4278 to 4284 inclusive Annual Report for the Period to 27 Octobe |
| A40506 | 1994 | Sons Of Gwalia Ltd | Sandy Soak | 8.4% | Annual Report for the period 13/01/93-12/01/94 Sandy Soak Project E37/223 |
| A43328 | 1994 | Sons Of Gwalia Ltd | Irwin Well | <1% | Irwin Well Project, Annual Report for the period 27/10 /1993 to 26/10/1994 (E37/239) |
| A38465 | 1993 | Sons Of Gwalia Ltd | Irwin Well | <1% | Irwin Well Project Annual Report for the period 27/10/1991 to 26/10/1992 (E37/239) |
| A39899 | 1993 | Mt Edon Gold Mines Nl | Tarmoola | <1% | Annual report for the period 11/92-11/93 Tarmoola Project |
| A35164 | 1992 | Hunter Resources Ltd | Pig Well | 8.5% | Annual Report for the Period 31/07/90 - 01/08/91 Pig Well Project Area Leonora District (E37/223, P37/3723 to |
| A36882 | 1992 | Hunter Resources Ltd | Dodger | 9.2% | Dodger Project, Partial Surrender Report,January 1992, E37/223. (Part of the Pig Well Area). |
| A10299 | 1981 | Seltrust Mining Corp Pty Ltd | Teutonic Bore | <1% | Teutonic Bore Project, Non-statutory Report: Report for the period 1st January 1979 to 31st December 1980, MC3 |
| A21875 | 1978 | Australian Selection Pty Ltd | Teutonic Bore | <1% | Teutonic Bore (JV) Project, Non-statutory Report: Progress Report for the period ending 31/12/1978, MC37/4648- |
| A7295 | 1977 | Australian Selection Pty Ltd | Teutonic Bore | <1% | Teutonic Bore (JV) Project, Non-statutory Report: Progress Report to 30th September 1977, (Vol 1), MC37/4648-4 |
| A4657 | 1974 | Asarco Australia Ltd | Mount Davis East | 17% | Mt Davis East Project, Non-statutory Report: Brief Exploration Report for the period ending 12/10/1973, MC37/4 |
| A3097 | 1972 | Western Mining Corporation Ltd | Kurrajong - Mount Davis | 8.6% | Kurrajong - Mount Davis Project, Annual Report for the year ending 30th June 1972, MC37/675-676, 678-684. |
| A1874 | 1971 | Western Mining Corporation Ltd | Tarmoola | 3.3% | Tarmoola Project, Annual Report for the period for the year ending 30th June 1971, MC37/528-532,536-539, 541-5 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A38649 | 1753 | Hunter Resources Ltd | Dodger - Sandy Soak | 9.2% | Annual report for the period 01/01/92-31/12/93 Sandy Soak Project E37/223 [Dodger] |
| A81260 | 1753 | St Barbara Ltd | GWALIA | 2.2% | GWALIA PROJECT, ANNUAL REPORT FOR THE PERIOD 1 OCTOBER 2007 – 30 SEPTEMBER 2008, C55/2004 E37/269, E37/789, E3 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 37/531 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 37/531? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.