M 74/85-I
M 74/85-I is a live mining lease in the Shire of Ravensthorpe, Western Australia, held by Aml (Ravensthorpe) Pty Ltd (part of Antares Metals Limited). Granted on 19 Aug 1993 for 21 years (renewed), it expires on 18 Aug 2035. The ground is covered by 193 historical WAMEX reports.
Register summary
- Holder
- Aml (Ravensthorpe) Pty Ltd
- Part of
- Antares Metals Limited (ASX:AM5) as at 2025-06-30
- Local government
- Shire of Ravensthorpe
- Application received
- 9 Apr 1992
- Commenced
- 19 Aug 1993
- Expiry
- 18 Aug 2035
- Term
- 21 Years (Renewed)
The full record on M 74/85-I
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares, and all 5 changes of holder
- The full record: 35 years of expenditure, 46 conditions and 19 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (28 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A143834 | 2024 | Dmc Mining Ltd | Ravensthorpe Nickel Project | 3.5% | Ravensthorpe Nickel Project E74/669 Annual Technical Report for the period ending 21/04/2024 |
| A135642 | 2023 | Dmc Mining Ltd | Ravensthorpe Nickel | 3.5% | E74/669 Annual Technical Report Ravensthorpe Nickel Project for the period ending 21/04/2023. |
| A130998 | 2022 | Dmc Mining Ltd | Ravensthorpe | 3.5% | Ravensthorpe Nickel Project E74/669 Annual Technical Report for the period ending 21/04/2022 |
| A124745 | 2020 | Ravensthorpe Nickel Operations Pty Ltd | Ravensthorpe Nickel Operation | <1% | Ravensthorpe Nickel Operation Annual Report C61/1999 for the period 7 May 2019 to 6 May 2020 |
| A122680 | 2020 | Aml (Ravensthorpe) Pty Ltd | Carlingup | 34% | Carlingup Project Annual Report 2019 |
188 more reports
| A122772 | 2020 | Ach Minerals Pty Ltd | Ravensthorpe Gold-Copper | <1% | Combined Annual Report C115/1996 for Ravensthorpe Gold Project for the period 1 January 2019 to 31 December 2 |
| A118996 | 2019 | Aml (Ravensthorpe) Pty Ltd | Carlingup | 34% | Carlingup Project C150/2012 Annual Report for the period 1 January 2018 to 31 December 2018, M74/00082, M74/00 |
| A119222 | 2019 | Ach Minerals Pty Ltd | Ravensthorpe | <1% | Combined Annual Report for Ravensthorpe Gold Project C115/1996 for the period 1 January 2018 to 31 December 20 |
| A120748 | 2019 | Ravensthorpe Nickel Operations Pty Ltd | Ravensthorpe | <1% | Ravensthorpe Nickel Operation C61/1999 Annual Report for the period 07/05/2018 to 06/05/2019 |
| A122133 | 2019 | Watts-Butler, D.E. | Bandalup | <1% | Annual Report for the period 28th September 2018 – 27th September 2019 Bandalup Magnesite Project Combined Rep |
| A117602 | 2018 | Ravensthorpe Nickel Operations Pty Ltd | Ravensthorpe | <1% | Ravensthorpe Nickel Operations, E74/546, M74/108, M74/114 - M74/116, M74/123 - M74/125, M74/142 - M74/145, M74 |
| A116016 | 2018 | Ach Minerals Pty Ltd | Ravensthorpe | <1% | Combined Annual Report for Ravensthorpe Gold Project C115/1996 for the period For the Period 1 January 2017 to |
| A116260 | 2018 | Aml (Ravensthorpe) Pty Ltd | Carlingup | 34% | Carlingup Project Annual Report C150/2012 for the period 1 January 2017 to 31 December 2017, M74/00082, M74/00 |
| A118353 | 2018 | Butler Rjt | Bandalup | <1% | Annual Report for the period 28 September 2017 – 27 September 2018 Bandalup Magnesite Project M74/110, M74/131 |
| A112120 | 2017 | Aml (Ravensthorpe) Pty Ltd | Carlingup | 34% | Carlingup Project C150/2012 Annual Report for the period 01/01/2016 to 31/12/2016, M74/00082, M74/00084, M74/0 |
| A112157 | 2017 | Ach Minerals Pty Ltd | Ravensthorpe | <1% | Ravensthorpe Gold-Copper Project C115/1996 Annual Report for the period 01/01/2016 to 31/12/2016, E74/00245... |
| A114164 | 2017 | Ravensthorpe Nickel Operations Pty Ltd | Raensthorpe | 1.3% | Raensthorpe Project P74/335 Relinquishment Report for the period 23/12/2009 - 22/06/2017 |
| A114323 | 2017 | Ravensthorpe Nickel Operations Pty Ltd | Ravensthorpe | <1% | Ravensthorpe Nickel Operations, E74/546, M74/108, M74/114 - M74/116, M74/123 - M74/125, M74/142 - M74/145, M74 |
| A115537 | 2017 | Butler Rjt | Bandalup | <1% | Annual Report for the period 28th September 2016 – 27th September 2017 Bandalup Magnesite Project Combined Rep |
| A108502 | 2016 | Silver Lake Resources Limited | Phillips River - Great Southern | <1% | Annual Report For the Period 1 January 2015 to 31 December 2015 PHILLIPS RIVER (GREAT SOUTHERN) PROJECT |
| A108324 | 2016 | Alpha Fine Chemicals Limited | Carlingup | 18% | Carlingup Project Annual Report Report Period: 1 January 2015 to 31 December 2015 |
| A110389 | 2016 | Butler R J | Bandalup | <1% | Annual Report for the period 28th September 2014 – 27th September 2015 Bandalup Magnesite Project Combined Rep |
| A109449 | 2016 | Fqm Australia Nickel Pty Ltd | Ravensthorpe | <1% | Ravensthorpe Nickel Operations, E74/546, M74/108, M74/114 - M74/116, M74/123 - M74/125, M74/142 - M74/145, M74 |
| A109470 | 2016 | Alpha Fine Chemicals Limited | Carlingup | 11% | Final Report E74/439 Carlingup Project for the period 01/07/2010 to 30/06/2016 |
| A104979 | 2015 | Australasian Mining Ltd | Carlingup | 18% | Carlingup Project Annual Exploration Report 2014 C150/2012 E74/439, E74/530, M74/82, M74/84, M74/85, M74/106 f |
| A105521 | 2015 | Silver Lake Resources Ltd | Phillips River - Great Southern | <1% | Phillips River (Great Southern) C115/1996 Annual Report for the period 1 Jan 2014 to 31 Dec 2014, E74/245....P |
| A106727 | 2015 | Ravensthorpe Nickel Op Pty Ltd | Ravensthorpe | <1% | Ravensthorpe Nickel Operation C61/1999, E74/546, M74/108, M74/114 - M74/116, M74/123 - M74/125, M74/142 - M74/ |
| A107386 | 2015 | Butler R J | Bandalup | <1% | Annual Report for the period 28th September 2014 – 27th September 2015 Bandalup Magnesite Project Combined Rep |
| A101297 | 2014 | Australasian Mining Ltd | Jerdacuttup | 18% | Jerdacuttup Project (C150/2012) Annual Exploration Report 2013 for the period 1 January 2013 – 31 December 201 |
| A101425 | 2014 | Silverlake Resources Ltd | Phillips River - Great Southern | <1% | Phillips River (Great Southern) C115/1996 Great Southern Annual Report for the period 1 Jan 2013 to 31 Dec 201 |
| A102598 | 2014 | Butler R | Bandalup | 1.4% | Surrender Report on Exploration Licence 74/150, Phillips River Mineral Field, Western Australia for the period |
| A105090 | 2014 | Butler R J | Bandalup | 1.4% | Annual Combined Mineral Exploration Report (C127/2012) for the Period 27 November 2013 to 26 November 2014, Ba |
| A102666 | 2014 | Ravensthorpe Nickel Operations Pty Ltd | Ravensthorpe | <1% | Ravensthorpe Nickel Operation 2013/2014 Annual Report for the period 07/05/2013 to 06/05/2014 C61/1999, E74/54 |
| A97560 | 2013 | Australasian Mining Ltd | Nindilbillup | <1% | NINDILBILLUP LATERITIC NICKEL-COBALT PROJECT ANNUAL REPORT 2013 M74/104 & M 74/107 C99/2005 27th February 2012 |
| A98721 | 2013 | Ravensthorpe Nickel Operations Pty Ltd | Ravensthorpe | <1% | Ravensthorpe Nickel Operation 2012/13 Annual Report for the period 07/05/12 to 06/05/13, C61/1999, E74/307, E |
| A96970 | 2013 | Australasian Mining Ltd | Jerdacuttup | 19% | Jerdacuttup Project, Annual Report for theperiod 1st January 2012 to 31st December 2012, E74/439; M74/82, 84, |
| A101001 | 2013 | Butler R J | Bandalup | 1.4% | Bandalup Project, Annual Report for the period 27/11/2012 to 26/11/2013, M74/110 & 132; E74/150; P74/221-223. |
| A92831 | 2012 | Traka Resources Ltd | Ravensthorpe | 2% | Ravensthorpe Project, Annual Report for the period 1st January 2011 to 31st December 2011, E74/378-379 & 439; |
| A95808 | 2012 | Butler R | Bandalup | 1.4% | Annual Combined Mineral Exploration Report (C127/2012) for the Period 27 November 2011 to 26 November 2012, Ba |
| A93460 | 2012 | Phillips River Mining Ltd | Rav8 | <1% | Annual Mineral Exploration Report for the Rav8 Project M74/13 for the period 6 March 2011 to 5 March 2012 |
| A94573 | 2012 | Ravensthorpe Nickel Operations Pty Ltd | Ravensthorpe | <1% | Ravensthorpe Nickel Operation 2011/12 annual report for the period 7/5/11 to 6/5/12 Group Reporting No. C61/19 |
| A93414 | 2012 | Phanerozoic Energy Pty Ltd | Nindilbillup | <1% | Nindilbillup Supergene (‘Lateritic’) Nickel-Cobalt Project Annual Report for the period 27th February 2011 to |
| A90127 | 2011 | Phanerozoic Energy Pty Ltd | Nindibillup | <1% | Nindibillup Project, Annual Report for the period 27th February 2010 to 26th February 2011, M74/104 & 107. (C9 |
| A90490 | 2011 | Tectonic Resources Nl | Rav8 | <1% | ANNUAL MINERAL EXPLORATION REPORT FOR THE RAV8 PROJECT For the period 06.03.2010 to 05.03.2011 M74/13 |
| A91545 | 2011 | Traka Resources Ltd | Ravensthorpe | 50% | Co-Funded Government – Industry Drilling Program of the Ravensthorpe Nickel Project Diamond Drilling Program 2 |
| A89327 | 2011 | Traka Resources Ltd | Ravensthorpe | 2.3% | Ravensthorpe Project C36/2003 Annual Exploration Report 2010, 1 January 2010 – 31 December 2010 |
| A91869 | 2011 | Butler R | Bandalup | 1.4% | Annual Report for the Period 2 November 2010 to 1 November 2011, Bandalup Magnesite Project, Exploration Lice |
| A90756 | 2011 | Ravensthorpe Nickel Operations Pty Ltd | Ravensthorpe | <1% | Ravensthorpe Nickel Operation C61/1999, Annual Report for the period 07/05/10 to 06/05/11 |
| A87172 | 2010 | Tectonic Resources Nl | Rav8 | <1% | Annual Mineral Exploration Report for the RAV8 Project For the period 06.03.2009 to 05.03.2010 M74/13 |
| A86605 | 2010 | Phanerozoic Energy Pty Ltd | Nindilbillup | 3.7% | Nindilbillup Supergene ("Lateritic") Nickel-Cobalt Project, Annual Report for the period from 27th February 20 |
| A85817 | 2010 | Butler R | Bandalup Magnesite | 1.4% | Annual Report for the period 2 November 2008 to 1 November 2009, Bandalup Magnesite Project |
| A86126 | 2010 | Traka Resources Ltd | Ravensthorpe | 1.6% | Annual Exploration Report, 1/01/2009-31/12/2009, Ravensthorpe Project, C36/2003. |
| A87268 | 2010 | Ravensthorpe Nickel Op Pty Ltd | Ravensthorpe | 3% | Ravensthorpe Nickel Operation Combined Annual Mineral Exploration Report C61/1999, 7th May 2009 – 06 May 2010, |
| A89156 | 2010 | Butler R | Bandalup | 1.4% | Annual Report for the Period 2 November 2009 to 1 November 2010, Bandalup Magnesite Project Exploration Licenc |
| A81883 | 2009 | Phanerozoic Energy Pty Ltd | NINDILBILLUP | 3.7% | NINDILBILLUP, SUPERGENE (‘LATERITIC’) NICKEL-COBALT PROJECT, ANNUAL REPORT for the period 27th February 2008 t |
| A78234 | 2009 | Phanerozoic Energy Pty Ltd | NINDILBILLUP | 3.7% | NINDILBILLUP SUPERGENE ('LATERITIC') NICKEL-COBALT PROJECT ANNUAL REPORT FOR THE PERIOD TO 26TH FEB 2008 FOR E |
| A81304 | 2009 | Traka Resources Ltd | Ravensthorpe | 1.5% | Ravensthorpe Project Surrender Report 2008, E74/144 and E74/209 |
| A81542 | 2009 | Traka Resources Ltd | Ravensthorpe | 2.3% | ANNUAL EXPLORATION REPORT 1/01/2008 – 31/12/2008, Ravensthorpe Project C36/2003, 1 January 2008 – 31 December |
| A81332 | 2009 | Butler R | Bandalup | 1.4% | Bandalup Magnesite Project, Annual Mineral Exploration Report, For the Period ending 1 November 2008, Explorat |
| A82738 | 2009 | Ravensthorpe Nickel Operations Pty Ltd | Ravensthorpe | 3.2% | Ravensthorpe Nickel Operation Combined Annual Mineral Exploration Report C61/1999, M74/108, 114, 115, 116, 123 |
| A78182 | 2008 | Bhp Billiton Nickel West Pty Ltd | Ravensthorpe | 3.7% | Ravensthorpe Nickel Project, Partial Surrender Report for the period 05/03/2004 - 04/03/2008, E74/212. [C61/1 |
| A77887 | 2008 | Traka Resources Ltd | Ravensthorpe | 1.5% | ANNUAL EXPLORATION REPORT 1/01/2007 - 31/12/2007 Ravensthorpe Project C36/2003, E74/73 ... E74/379, M74/82-85, |
| A78414 | 2008 | Tectonic Resources Nl | THE RAV8 | <1% | Project Reporting Status No: RAV8 Annual Report for The Rav8 Project For the period 6.3.07 to 5.3.08 M74/13 Re |
| A78723 | 2008 | Bhp Billiton Nickel West Pty Ltd | Ravensthorpe Nickel | 2.7% | Ravensthorpe Nickel Operation Combined Annual Technical Report (C61/1999) M74/108, 114, 115, 116, 123, 142, 14 |
| A74843 | 2007 | Billiton Nickel (Ravensthorpe) Pty Ltd | Ravensthorpe | 3.7% | Ravensthorpe Project, Partial Surrender Report for the period 05/03/2004 to 04/03/2007, E74/212. |
| A74896 | 2007 | Phanerozoic Energy Pty Ltd | Nindilbillup | 3.7% | Nindilbillup Supergene ('Lateritic') Nickel-Cobalt Project Annual Report for the period 26th February 2007 for |
| A74846 | 2007 | Tectonic Resources Nl | RAV8 | <1% | Annual Report for the Rav8 Project For the period 6/3/06 to 5/3/07, M74/13 Report No.RAV8_2006 |
| A75566 | 2007 | Ravensthorpe Nickel Operations Pty Ltd | Ravensthorpe | 2.7% | Ravensthorpe Nickel Combined Annual Mineral Exploration Report (C61/1999) M74/108,114,115,116,123,142,143,144, |
| A76841 | 2007 | Mr Butler R | Bandalup | 1.4% | ANNUAL MINERAL EXPLORATION REPORT FOR THE PERIOD 2 NOVEMBER 2006 to 1 NOVEMBER 2007 EXPLORATION LICENCE 74/150 |
| A74363 | 2007 | Traka Resources Ltd | Kundip/Ravensthorpe | 1.6% | Annual Exploration Report 01/01/2006- 31/12/2006 Ravensthorpe Project (C36/2003), E74/73, E74/144.....,M74/82 |
| A71559 | 2006 | Mr Butler R | Bandalup | 1.4% | Annual mineral exploration report for the period 2 November 2004 to 1 November 2005,Exploration licence 74/150 |
| A71866 | 2006 | Traka Resources Ltd | Ravensthorpe | 1.6% | Annual exploration report 1/01/2005 to 31/12/2005, Ravensthorpe Project C36/2003, E74/73, E74/144, E74/152, E7 |
| A72497 | 2006 | Ravensthorpe Nickel Operations Pty Ltd | Kundip/ Ravensthorpe | 2.7% | Ravensthorpe Nickel Project, Combined Annual Technical Report (C61/1999), M74/108, M74/114..........E74/212 an |
| A74273 | 2006 | Mr Butler R | Bandalup | 1.4% | Annual Report for the Period 2 November 2005 to 1 November 2006, Bandalup Magnesite Project E74/150, (Ravensth |
| A72711 | 2006 | Phanerozoic Energy Pty Ltd | Nindilbillup | 3.7% | Nindilbillup (Supergene(Lateritic) Nickel-Cobalt) Project, 2005 Progress & Project Status Report for E74/73,10 |
| A72894 | 2006 | Tectonic Resources Nl | Rav 8 | <1% | Annual Report for the Rav8 Project M74/13, For the Period 06/03/05 to 05/03/06, (Tectonic Report No. RAV8_2006 |
| A73172 | 2006 | Ravensthorpe Nickel Operations Pty Ltd | Kundip/Ravensthorpe | 4.5% | Ravensthorpe Nickel Project, Partial Surrender Report E70/204, For the Period 24/02/1997 to 23/02/2006. |
| A70154 | 2005 | Traka Resources Ltd | Ravensthorpe | 1.6% | Annual report for the period 01/01/04 - 31/12/04 Ravensthorpe Project, C36/2003, E74/73, E74/144, E74/152, E74 |
| A70373 | 2005 | Traka Resources Ltd | Ravensthorpe | 2% | Partial Surrender Report 24/01/97 - 30/03/05, E74/209, E74/219, Ravensthorpe Project, C36/2003, (Ravensthorp |
| A70572 | 2005 | Phanerozoic Energy Pty Ltd | Nindilbillup Beach | 3.7% | Nindilbillup Beach Project, Ravensthorpe, E74/73, M74/104, Annual Geological Report for the year to 26 Februar |
| A70643 | 2005 | Ravensthorpe Nickel Operations Pty Ltd | Ravensthorpe | 2.7% | Ravensthorpe Nickel Project, Combined annual technical report C61/1999, for the period 07/05/04 - 06/05/05 E7 |
| A68158 | 2004 | Loongana Lime Pty Ltd | Bandalup | 1.4% | Bandalup Project, Annual Report E74/150 for period November 2002 to November 2003. |
| A68440 | 2004 | Traka Resources Ltd | Ravensthorpe | 1.6% | Annual Report for the period 01/01/2003-31/12/2003 Ravensthorpe Project (C36/2003), E74/73, E74/144, E74/152, |
| A68679 | 2004 | Bhp Billiton Minerals Pty Ltd | Ravensthorpe | 4% | Combined Annual Report for the period 07/05/2003-06/05/2004 Ravensthorpe Nickel Project (C61/1999), M74/108, M |
| A68691 | 2004 | Mr Lipple Sl | Ravensthorpe | <1% | Ravensthorpe Project ML74/104 Geological report for the year to 29th January 2004 |
| A66411 | 2003 | Ravensthorpe Nickel Operations Pty Ltd | Ravensthorpe | 4.5% | Annual Technical Report for the period 24/02/2002 to 23/02/2003 Ravensthorpe Nickel Project E74/204 Report No |
| A67046 | 2003 | Ravensthorpe Nickel Operations Pty Ltd | Ravensthorpe | <1% | Annual Technical Report E74/208 for the period 19/06/02 to 18/06/03 Ravensthorpe Nickel Project Ref: ATR 2003 |
| A65914 | 2003 | Loongana Lime Pty Ltd | Bandalup | 1.4% | Annual Technical Report Exploration Licence 74/150. Bandalup for the period 2nd November 2001 to 1st November |
| A64440 | 2002 | Greenstone Resources Nl | Ravensthorpe | <1% | Annual Report For Mining Lease M74/104, Ravensthorpe for the period to 29 January 2002. |
| A64543 | 2002 | Ravensthorpe Nickel Operations Pty Ltd | Ravensthorpe | 4.5% | Ravensthorpe Nickel Project Annual Technical Report E74/204 For The Period 24/02/2001 to 23/02/2002. RNP-REP-4 |
| A64548 | 2002 | Greenstone Resources Nl | Ravensthorpe | <1% | Annual Report For Mining Lease M74/104, Ravensthorpe For The Period To 29 January 2003. |
| A65017 | 2002 | Tectonic Resources Nl | RAV8 | <1% | 2001 Annual Report on the Mining Lease M74/13 (Rav 8) Annual Report for the Period 27th March 2001 to 26th Mar |
| A65291 | 2002 | Ravensthorpe Nickel Operations Pty Ltd | Ravensthorpe | <1% | Annual Technical Report E74/208 For The Period 19/06/2001 to 18/06/2002 Ref: ATR 2002 74-208 |
| A65541 | 2002 | Greenstone Resources Nl | Ravensthorpe | <1% | Combined Annual Report On Exploration For Period Ended 23 January 2002 E74/209, E74/243 Ravensthorpe Regional |
| A65751 | 2002 | Qni Exploration And Development Pty Ltd | Mount Short | 10% | Mount Short Project Combined Annual Report C91/2001. Exploration Conducted On Mining Leases M74/82, M74/84 And |
| A62499 | 2001 | Tectonic Resources Ltd | RAV8 | <1% | 2000 Annual Report On The Mining Lease M74/13 (RAV 8) Annual Report for the Period 27th March 2000 to 26th Mar |
| A62562 | 2001 | Greenstone Resources Nl | Ravensthorpe Black Shale | <1% | Ravensthorpe Black Shale Project Western Australia E74/209 and 74/243 Annual Report Period 24 January 2000 - 2 |
| A62650 | 2001 | Ravensthorpe Nickel Operations Pty Ltd | Ravensthorpe | 3.7% | Annual Technical Report E74/73 (M74/108 Pending) For the Period 27/02/2000 to 26/02/2001.Shoemaker-Levy Minera |
| A62836 | 2001 | Greenstone Resources Nl | Ravensthorpe | 38% | Ravensthorpe Nickel Project Combined Annual Report C480/1996 Exploration Conducted On Mining Leases 74/82, 83, |
| A62837 | 2001 | Greenstone Resources Nl | Ravensthorpe | 38% | Ravensthorpe Nickel Project Combined Annual Report C480/1996 Exploration Conducted on Mining Leases 74/82, 83, |
| A63748 | 2001 | Loongana Lime Pty Ltd | Bandalup | 1.4% | Annual Report for the period 2nd November 2000 to 1st November 2001 exploration licence 74/150 Bandalup, Miner |
| A60140 | 2000 | Anaconda Nickel Ltd | Bandalup | 4.5% | Technical Report 763 Ravensthorpe Project, E74/204 Third Annual Technical Report for the period 24/02/1999 to |
| A60200 | 2000 | Tectonic Resources Ltd | Rav 8 | <1% | 1999 Annual Report on the Mining Lease M74/13 RAV 8 Period 01/03/1999 to 01/03/2000 |
| A60235 | 2000 | Homestake Gold Of Australia Ltd | Ravensthorpe | <1% | Project 6176 Project 6176 Ravensthorpe Regional Project E74/209 and 74/243 Annual Report Period 24/01/1999 to |
| A61002 | 2000 | Comet Resources Nl | Ravensthorpe | 3.7% | Ravensthorpe Nickel Project E74/73 (Application M74/108) Shoemaker-Levy Resource Estimation Report. Period Jan |
| A61134 | 2000 | Elw Group | Nindilbillup | <1% | Annual Report on Nindilbillup Nickeliferous Laterite Project 1999-2000. M74/104 and MLA 74/107. ELW Group. |
| A61510 | 2000 | Loongana Lime Pty Ltd | Bandalup | 1.4% | Annual Report for the Period 2 November 1999 to 1 November 2000 E74/150, Bandalup, Mineral Field: Phillips Riv |
| A59494 | 1999 | Mr Butler Rjt | Bandalup | 1.4% | Bandalup, E74/150, Annual Report 02 November 1998 to 01 November 1999. |
| A57371 | 1999 | Anaconda Nickel Ltd | Ravensthorpe | 4.5% | Ravensthorpe Project - E74/204 24/02/98 - 23/02/99 |
| A57831 | 1999 | Comet Resources Nl | Kundip - Ravensthorpe | 3.7% | Ravensthorpe Nickel Project, 12/1997-12/1998 Shoemaker-Levy Resource Estimation Report E74/73 |
| A57844 | 1999 | Homestake Gold Of Australia Ltd | Kundip | 2.3% | Annual Report - Kundip Project, W.A. Exploratin Lease: 74/209 24/01/98 - 23/01/99 Technical Report: 789 |
| A57953 | 1999 | Tectonic Resources Ltd | Rav 8 | <1% | 1998 Annual Report on Mining Lease M74/13 (RAV 8) |
| A61133 | 1999 | Mr Lipple Sl | Ravensthorpe | 3.7% | Technical Report ELW 1299 Ravensthorpe Nickel Project Joint Venture orientation metallurgical testwork to demo |
| A56799 | 1998 | Greenstone Resources Nl | Ravensthorpe | 2.9% | Ravensthorpe Project - Combined Annual Report 19/10/97-18/10/98 E74/73, 132, E72/144, M74/82-86 |
| A56692 | 1998 | Mr Butler Rjt | Bandalup | 1.4% | Bandalup E74/150 Annual Report 02/11/97 - 01/11/98 |
| A54304 | 1998 | Homestake Gold Of Australia Ltd | Bandalup | 2.3% | Annual Report, Exploration conducted on the Bandalup Project, Western Australia, Exploration Licence E74/209 |
| A54525 | 1998 | Yilgarn Nickel Pty Ltd | Bandalup | 4.5% | Bandalup Prospect, E74/204 Phillips River Mineral Field, Ravensthorpe W.A. 24/02/97 - 23/02/98 |
| A54746 | 1998 | Greenstone Resources Nl | Ravensthorpe | <1% | Ravensthorpe Project, Annual Report M74/104 30/01/97 - 29/01/98 |
| A54787 | 1998 | Tectonic Resources Ltd | Rav 8 | <1% | 1997 Annual Report, Mining Lease: M74/13 (Rav 8) 03/1997 - 03/1998 |
| A50510 | 1997 | Wmc Resources Ltd | Ravensthorpe | <1% | Annual Technical Report on Mining Lease M74/13 Ravensthorpe Joint Venture for the period 6 March 1996 to 5 Mar |
| A50592 | 1997 | Greenstone Resources Nl | Ravensthorpe | 3.7% | Ravensthorpe Sulphide Nickel Project (EL74/73) Annual report for the period 27 February 1996 to 26 February 19 |
| A53735 | 1997 | Mr Butler Rjt | Bandalup | 1.4% | Annual progress report Exploration Licence 74/150 Phillips River Mineral Field for the period 02/11/96-01/11/9 |
| A54579 | 1997 | Greenstone Resources Nl | Ravensthorpe | 2.9% | Ravensthorpe Project, 19/10/1996 - 19/10/1997 E74/73, 132, 144, M74/82-86 |
| A48995 | 1996 | Cra Exploration Pty Ltd | Bandalup Hill | <1% | Bandalup Hill Project, Final Surrender Report for period ending 17th April 1996, E74/178 & 179. |
| A48571 | 1996 | Kundip Mines Nl | Bandalup | 3.3% | Annual report on the operations on E74/72 Bandalup Laterite Nickel Project for the period 27th February 1995 t |
| A49767 | 1996 | Mr Butler Rjt | Bandalup | 1.4% | Annual Progress Report Exploration Licence E74/150 Phillips River Mineral Field for the period 2 November 1995 |
| A49785 | 1996 | Wmc Resources Ltd | Ravensthorpe | <1% | Annual Technical Report on Mining Lease M74/13 Ravensthorpe Joint Venture for the period 6 March 1995 to 5 Mar |
| A49293 | 1996 | Greenstone Resources Nl | Ravensthorpe | 33% | M74/82 M74/83 M74/84 M74/85 M74/86 Ravensthorpe Project Annual report for the period 14/08/1995 to 19/08/1996 |
| A46537 | 1995 | Mr Butler Rjt | Bandalup | 1.4% | Partial Surrender Report for the period 02/11/92-02/11/95 Phillips River Project E74/150 |
| A46538 | 1995 | Mr Butler Rjt | Bandalup | 1.4% | Annual Progress Report Exploration Licence E74/150 Phillips River Mineral Field for the period 2nd November 19 |
| A42564 | 1994 | Outokumpu Exp Aust Pty Ltd | Ravensthorpe | 53% | Ravensthorpe Nickel Project Mining Lease M74/83 M74/84 and M74/85 Annual report for the period 19th August 199 |
| A40234 | 1994 | Nero Exploration Pty Ltd | Bandalup | 1.4% | Annual report for the period 02/11/92-01/11/93 Bandalup Project E74/150 |
| A42565 | 1994 | Outokumpu Exp Aust Pty Ltd | Ravensthorpe nickel | <1% | Ravensthorpe Nickel Project Mining Lease M74/82 Annual report for the period 19th August 1993 to 18th August 1 |
| A42566 | 1994 | Outokumpu Exp Aust Pty Ltd | Ravensthorpe nickel | 3.7% | Ravensthorpe Nickel Project Exploration Licence E74/73 and Prospecting Licence P74/166 Progress report for the |
| A38600 | 1993 | Outokumpu Exp Aust Pty Ltd | Bandalup | 3.7% | Report on exploration activities carried out in the area of compulsory fourth year relinquishment of 50% of E7 |
| A38601 | 1993 | Outokumpu Exp Aust Pty Ltd | Ravensthorpe | 3.7% | Annual report for the period 27/02/92-26/02/93 Ravensthorpe Project E74/73 |
| A39447 | 1993 | Outokumpu Exp Aust Pty Ltd | Ravensthorpe | <1% | Annual Report for the period 19/08/92-18/08/93 Ravensthorpe Project M74/82 |
| A35717 | 1992 | Outokumpu Exp Aust Pty Ltd | Ravensthorpe | 2.6% | E74/55; M74/75 & 76, Ravensthorpe Project, Annual Report for the year ending 24 March 1992. |
| A36354 | 1992 | Kundip Mines Nl | Bandalup | 3.3% | 1989 - 1992 Progress Report Bandalup Lateritic Nickel Project E74/72-E74/73 Kundip Mines NL |
| A37575 | 1992 | Sjerp & Associates Pty Ltd | Bulong/Bandalup | 1.4% | Annual Report for the Period 01/12/91 - 01/12/92 Bulong/Bandalup Project M25/79, E74/150 |
| A34627 | 1991 | Outokumpu Exp Aust Pty Ltd | Bandalup | 4.4% | Bandalup Project, Annual Report for the year ending 5th October 1991, E74/57. |
| A34262 | 1991 | Western Mining Corporation Ltd | Ravensthorpe (RAV8) | <1% | Technical report: KGTO23 Annual report on Ravensthorpe JV Prospect 8 Lease M74/13 06/03/88 to 05/03/91 Wester |
| A29824 | 1989 | Consolidated Mining & Finance Ltd | Boyup Creek | 2.6% | Boyup Creek Project, Non-statutory Report: E74/55 Progress Report , August 1989. |
| A27151 | 1989 | Dr Locsei J | Boyup Creek | 2.6% | E74/55 , Boyup Creek Project, Annual Report for the period 25/03/88-24/03/89. |
| A25129 | 1988 | Dalrymple Resources Nl | Ravensthorpe | 78% | Ravensthorpe, Final report, P74/111-112 |
| A25499 | 1988 | Chevron Exploration Corp | Bandalup | 4.4% | Annual report for E74/57 Bandalup. Year Ending 5 October 1988. Chevron Exploration Corporation. |
| A22108 | 1988 | Chevron Exploration Corp | Bandalup | 4.4% | Annual report on E74/57 'Bandalup' Year ended 5th October 1987 |
| A23555 | 1988 | Dr Locsei J | Boyup Creek | 2.6% | Annual Report for the period 25/03/87-24/03/88, Boyup Creek Project, E74/55. |
| A20464 | 1987 | Western Mining Corporation Ltd | Ravensthorpe (RAV8) | <1% | Annual report Ravensthorpe Joint Venture Number Eight Prospect (M74/13, 1987) |
| A20979 | 1987 | Dr Locsei J | Boyup Creek | 2.6% | Boyup Creek Project, Tenement E74/55. Annual report for the year ending 25 March 1987 |
| A19041 | 1986 | Norseman Gold Mines Nl | Kundip | <1% | Kundip Mines (Ravensthorpe, Western Australia) Ore Reserve and Resource Potential (1986, M74/9 M74/10 M74/14 M |
| A17172 | 1985 | Norseman Gold Mines Nl | Bandalup | <1% | Bandalup Project, Non-statutory Report: Report on Magnesite Mining Operations, July 1985, M74/9-10; MC74/76-77 |
| A11273 | 1982 | Western Mining Corporation Ltd | Ravensthorpe | 2.1% | Ravensthorpe Project, Annual Report for the period 01/01/1978 to 08/12/1981, MC74/218-219, 221,240-242, 244-24 |
| A9562 | 1981 | Western Mining Corporation Ltd | Bandalup | 4.8% | Bandalup (JV) Project, Non-statutory Report: Terminal Report for the period 1st January 1978 to 6th November 1 |
| A7907 | 1978 | Western Mining Corporation Ltd | Ravensthorpe | 2.9% | Ravensthorpe (JV) Project, Annual Report for the period 01/07/1976 to 31/12/1977, (Driling Data), MC70/1665-16 |
| A7875 | 1978 | Western Mining Corporation Ltd | Bandalup | 4.4% | Bandalup (JV) Project, Annual Report for the period 1st July 1976 to 31st December 1977, MC74/511-512, 618-621 |
| A7904 | 1978 | Western Mining Corporation Ltd | Ravensthorpe | 2.9% | Ravensthorpe (JV) Project, Annual Report for the period 1st July 1976 to 31st December 1977, MC74/187-191, 193 |
| A6547 | 1976 | Western Mining Corporation Limited | Ravensthorpe | 2.1% | Ravensthorpe Project, Annual Report for the period 01/08/1974 to 29/06/1976, MC74/187-269............1665-1675 |
| A4826 | 1974 | Pickands Mather & Co Int | Ravensthorpe | <1% | Ravensthorpe Project, Non-statutory Report: Exploration Report, Prospect No 8, ( Part 1), 1971-1974 DDH Logs R |
| A4827 | 1974 | Pickands Mather & Co Int | Ravensthorpe | <1% | Ravensthorpe Project, Non-statutory Report: Exploration Report, Prospect No 8, (Part 2)1973-1974 Percussion , |
| A4829 | 1974 | Pickands Mather & Co Int | Ravensthorpe | <1% | Ravensthorpe Project, Non-statutory Report: Exploration Report, Prospect No 8 East, 1973 DDH Logs & Assays, Pe |
| A4922 | 1974 | Pickands Mather & Co Int | Ravensthorpe | 3% | Ravensthorpe Project, Non-statutory Report: Final Drillng Programme , Prospect No 3, A H B Area, March 1974, M |
| A4954 | 1974 | Pickands Mather & Co Internat | Ravensthorpe | <1% | Supplementary report [non-statutory] on the applied potential survey of Area 8, Near Ravensthorpe, [ M74/13 ] |
| A4975 | 1974 | Pickands Mather & Co Internat | Ravensthorpe | 3% | Ravensthorpe project, Non-statutory Report:Plans for Prospects No. 1 Extended, No. 4 & No. 5, Atherton - Hoski |
| A7221 | 1974 | Pickands Mather & Co Int | Ravensthorpe - Bandalup | 2.3% | Ravensthorpe - Bandalup Project, Non-statutory Report:Analysis Report Sheets & Air Drill Logs, to May 1974,MC |
| A7222 | 1974 | Pickands Mather & Co Int | Ravensthorpe- Bandalup | 2.3% | Ravensthorpe- Bandalup Project, Non-statutory Report: Anaysis Report Sheets & Air Drill Logs, May & June 1974 |
| A7223 | 1974 | Pickands Mather & Co Int | Ravensthorpe - Bandalup | 2.3% | Ravensthorpe - Bandalup Project, Non-statutory Report: Analysis Report Sheets & Air Drill Logs to October 197 |
| A4924 | 1974 | Pickands Mather & Co Int | Ravensthorpe | 3% | Ravensthorpe Project, Non-statutory Report: A Report on A H B Area, Prospect No 3, February 1974, MC74/218-21 |
| A4925 | 1974 | Pickands Mather & Co Int | Ravensthorpe | 3% | Ravensthorpe Project, Non-statutory Report: Interim Report , A.H.B. Prospect 10 South, January 1974, MC74/218- |
| A7224 | 1974 | Pickands Mather & Co Int | Ravensthorpe -Bandalup | 2.3% | Ravensthorpe -Bandalup Project, Non-statutory Report: Analysis Report Sheets , Diamond Drill Records & Air Dri |
| A4949 | 1974 | Pickands Mather & Co Int | Ravensthorpe | 3% | Ravensthorpe Poject, Non-statutory Report: A Report on the A.H.B. Drilling Programme, Prospects 10 South, 16 & |
| A4966 | 1974 | Pickands Mather & Co Internat | Ravensthorpe | <1% | Report [non-statutory] on geophysical investigation of Area 8, Ravensthorpe, [ M74/13 ] |
| A7227 | 1974 | Pickands Mather & Co Int | Ravensthorpe - Bandalup South | 2.3% | Ravensthorpe - Bandalup South Project, Non-statutory Report: Analysis Report Sheets & Air Drill Logs, to May 1 |
| A7228 | 1974 | Pickands Mather & Co Int | Ravensthorpe - Bandalup South | 2.3% | Ravensthorpe - Bandalup South Project, Non-statutory Report: Analysis Report Sheets , Air Drill Logs & Assay S |
| A7225 | 1974 | Pickands Mather & Co Int | Ravensthorpe- Bandaup South | 2.3% | Ravensthorpe- Bandalup South Project, Non-statutory Report: Analytical Results & Drilling Data to November 197 |
| A13758 | 1973 | Bhp Minerals Pty Ltd | Ravensthorpe | <1% | Ravensthorpe Project, Non-statutory Report: Geological Report, August 1973, MC74/157. |
| A4927 | 1973 | Pickands Mather & Co Int | Ravensthorpe | 3% | Ravensthorpe Project, Non-statutory Report: A Report on Prospect No 16, April 1973, MC74/218-219......MC74/814 |
| A4928 | 1973 | Pickands Mather & Co Int | Ravensthorpe | 3% | Ravensthorpe Project, Non-statutory Report: Report on Drilling Programme , Area B-Prospect B1, March - April 1 |
| A4958 | 1973 | Pickands Mather & Co Internat | Ravensthorpe | 3% | Ravensthorpe Project, Non-statutory Report:Copper, Chromium, Zinc, Nickel & Copper/Nickel Soil Sampling , Ath |
| A4972 | 1973 | Pickands Mather & Co Internat | Ravensthorpe | 3% | Ravensthorpe Prospect, Non-statutory Report : Report on Prospect No. 17, May 1973, MC74/218-219, 221, 240-242, |
| A4931 | 1972 | Pickands Mather & Co Int | Ravensthorpe | 3% | Ravensthorpe Project, Non-statutory Report: Interim Report on Atherton -Hoskins- Boyup Area, Sheets 8,9,10 & 1 |
| A20926 | 1972 | Norseman Gold Mines Nl | Ravensthorpe | <1% | Report on assessment of reserves of recoverable magnesite in the Ravensthorpe Magnesite Depoits [non-statutory |
| A4926 | 1972 | Pickands Mather & Co Int | Ravensthorpe | 5.5% | Ravensthorpe Project, Non-statutory Report: a Report on A. H. B. - Carlingup Area, October 1972, MC74/248-30 |
| A4930 | 1972 | Pickands Mather & Co Int | Ravensthorpe | 3% | Ravensthorpe Project, Non-statutory Report: Report on Drillling Programme , Atherton-Hoskins-Boyup Creek Area, |
| A4073 | 1971 | Broken Hill Pty Co Ltd | Ravensthorpe | 29% | Ravensthorpe Project, Non-statutory Report: An Evaluation of Ravensthorpe Magnesite Sample, April 1971, MC74/7 |
| A1932 | 1962 | Broken Hill Pty Co Ltd | Ravensthorpe | 8% | Ravensthorpe Project, Non-statutory Report:Prospecting and Testing of the Magnesite Deposits at Ravensthorpe, |
| A13753 | 1962 | Bhp Minerals Pty Ltd | Ravensthorpe | 7.5% | Ravensthorpe Project, Non-statutory Report; Memo's, Letters & Reports for the period ending 13/06/1962, TR70/1 |
| A13754 | 1962 | Bhp Minerals Pty Ltd | Ravensthorpe | 7.5% | Ravensthorpe Project, Non-statutory Report:Petrological Report on Specimens WA905-WA908, Ravensthorpe Area, Ma |
| A13755 | 1962 | Bhp Minerals Pty Ltd | Ravensthorpe | 7.5% | Ravensthorpe Project, Non-statutory Report: Petrological Report: Specimens fron the Ravensthopre Area, August |
| A1562 | 1961 | Basic Materials Co Pty Ltd | Ravensthorpe | <1% | Ravensthorpe Project, Non-statutory Report: Report on the Magnesite Deposits of the Ravensthorpe Area, W. A., |
| A4891 | 1753 | Pickands Mather & Co Int | Ravensthorpe | <1% | Ravensthorpe |
| A7217 | 1753 | Pickands Mather & Co Int | Ravensthorpe | <1% | Ravensthorpe |
| A82535 | 1753 | Mincor Resources Nl | RAV8 | <1% | RAV8, M74/013, Annual Technical Report For the Period 7 March 2008 to 6 March 2009 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 74/85-I into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 74/85-I? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.