E 38/3914
Register summary
- Holder
- Gold Alpha Investments Pty Ltd
- Local government
- Shire of Laverton
- Application received
- 11 Oct 2023
- Commenced
- 13 Mar 2026
- Expiry
- 12 Mar 2031
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A132799 | 2022 | Lodestar Minerals Ltd | Jubilee Well | 98% | Annual Report for E38/3054 Jubilee Well for the period ending 12/09/2022 |
| A126029 | 2021 | Gsm Mining Company Pty Ltd | E38/2888 | <1% | Compulsory Partial Surrender (40%) of Exploration Licence E38/2888 For the Period 23 January 2015 to 22 Januar |
| A128857 | 2021 | Lodestar Minerals Ltd | Jubilee Well | 98% | Annual Exploration Report Jubilee Well E38/03054 for the period ending 12/09/2021 |
| A122815 | 2020 | Anglogold Ashanti Australia Limited | Sunrise Dam | <1% | Sunrise Dam (C144/1995) Annual Report to the Department of Mines, Industry Regulation and Safety for the perio |
| A123791 | 2020 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period ending 31/3/2020 |
143 more reports
| A124711 | 2020 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168 Annual Report for the period ending 30/06/2020 |
| A124126 | 2020 | Anglogold Ashanti Australia Limited | Pink Lady | <1% | CO-FUNDED EIS REPORT, EIS Round 19 – Pink Lady, Sunrise Dam Gold Mine |
| A124132 | 2020 | Focus Minerals (Laverton) Pty Limited | Carey | <1% | Carey C88/2014 Annual Technical Report for the period ending 31/03/2020 |
| A125157 | 2020 | Anglogold Ashanti Australia Limited | Western Ramps | <1% | EIS Round 20 - Western Ramps (Final Report) |
| A120662 | 2019 | Focus Minerals (Laverton) Pty Limited | Carey | <1% | Carey project C88/2014 Annual Technical Report for the period 1 April 2018 to 31 March 2019, E 38/02872,P 38/0 |
| A120929 | 2019 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168/2001 Combined Annual Report For the Period 1 July 2018 to 30 June 2019, E38/01935, E38/03 |
| A119211 | 2019 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum for the Period 1 January 2018 to 3 |
| A119796 | 2019 | Oro Del Sur Pty Ltd | Laverton | 98% | E38/3054 Annual Technical Report for the period 13 September 2017 to 12 September 2018 |
| A120095 | 2019 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period 1 April 2018 to 31 March 201 |
| A120368 | 2019 | Anglogold Ashanti Australia Limited | Southern Shear - Sunrise Dam | <1% | EIS Southern Shear Zones – SDGM project (R#17) |
| A121151 | 2019 | Focus Minerals (Laverton) Pty Limited | Carey | <1% | Final Surrender Report for E38/2872 for the period 20 March 2014 to 25 July 2019 |
| A115940 | 2018 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3 |
| A116780 | 2018 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton C86/2002 Combined Annual technical Report for the period 01/04/2017 - 31/03/2018 |
| A117034 | 2018 | Focus Minerals (Laverton) Pty Limited | Carey | <1% | Carey C88/2014 Annual Technical Report for the period 01/04/2017 - 31/03/2018, E38/02872, P38/04099, P38/04100 |
| A117575 | 2018 | Gsm Mining Company Pty Ltd | Wallaby | <1% | WALLABY PROJECT COMBINED ANNUAL TECHNICAL REPORT, C168/2001, 01 JULY 2017 - 30 JUNE 2018 |
| A112079 | 2017 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016 |
| A114051 | 2017 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | CENTRAL LAVERTON PROJECT Combined Annual Technical Report (C86/2002) for the period 01 April 2016 – 31 March 2 |
| A114106 | 2017 | Focus Minerals (Laverton) Pty Limited | CAREY | <1% | Carey Project C88/2014 Combined Annual Report For the Period 1 April 2016 to 31 March 2017, E38/02872, E38/028 |
| A114580 | 2017 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168/2001 Combined Annual Technical Report for the period 1 July 2016 to 30 June 2017, E38/012 |
| A108112 | 2016 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/ |
| A109737 | 2016 | Gsm Mining Company Pty Ltd | Wallaby | <1% | WALLABY PROJECT COMBINED ANNUAL TECHNICAL REPORT (C168/2001) FOR THE PERIOD 01 JULY 2015 – 30 JUNE 2015 |
| A108971 | 2016 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | C86/2002 CENTRAL LAVERTON PROJECT COMBINED ANNUAL TECHNICAL REPORT FOR THE PERIOD 01/04/2015 TO 31/03/2016 |
| A109072 | 2016 | Focus Minerals (Laverton) Pty Limited | Carey | <1% | Carey Project C88/2014 Combined Annual Report for the period 01/04/2015 to 31/03/2016, E38/02872, E38/02873, P |
| A104898 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group | <1% | Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3 |
| A105466 | 2015 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 01/01/2014 - 31/12/2015, E38/2306.....P39/5063 |
| A105693 | 2015 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Combined Annual Technical Report for the period 01 April 2014 to 31 March 2015, C86/2002, E38 |
| A105986 | 2015 | Focus Minerals (Laverton) Pty Ltd | Carey | <1% | Carey Project C88/2014 Combined Annual Report for the period 1 April 2014 to 31 March 2015, E38/2872, P38/4099 |
| A106502 | 2015 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168/2001 Annual Report for the period 1 July 2014 to 30 June 2015, E38/01211, E38/01935, E39/ |
| A107077 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project E38/2297 (Empie) Surrender Report for the period 20/10/2010 to 01/09/2015 |
| A100990 | 2014 | Gsm Mining Company Pty Ltd | Barnicoat | <1% | Barnicoat Project, Annual Report for the period 01/01/2013 to 31/12/2013, M38/361-362, 483-484; E38/2029 & 203 |
| A101216 | 2014 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201 |
| A101830 | 2014 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 01 January 2013 to 31 December 2013, E38/2306, E39 |
| A102477 | 2014 | Focus Minerals Ltd | Mount Weld | 25% | Mt Weld E38/1652 Annual Report for the period 01/09/2013 to 31/03/2014 |
| A102837 | 2014 | Gsm Mining Company Pty Ltd | Barnicoat | <1% | Barnicoat Project, Final Surrender Report for the period 08/10/2008 to 29/04/2014, E38/2029 & 2035. [C388/1993 |
| A103028 | 2014 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project, Partial Surrender Report for the period 29/05/2008 to 28/05/2014, E38/1935; E39/1260. [C168/2 |
| A103165 | 2014 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project Combined Annual Technical Report (C168/2001) for the period 1 July 2013 to 30 June 2014, P38/3 |
| A97624 | 2013 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279; |
| A96870 | 2013 | Barrick (Granny Smith) Pty Ltd | Barnicoat | <1% | PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483, M38/484 E38/2029, E38/2035 P39/4806 ANNUAL REPORT Pe |
| A99045 | 2013 | Barrick (Australia Pacific) Ltd | Wallaby | <1% | Wallaby Project Annual Report for the period 1 July 2012 – 30 June 2013, P38/3666.......M38/1137 |
| A99227 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group | <1% | Sunrise Dam Group Surrender Report for E38/2220 for the period 16/07/2010 to 24/07/2013 |
| A100055 | 2013 | Focus Minerals (Laverton) Pty Ltd | Sunrise | 12% | Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545 |
| A96848 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995) |
| A92958 | 2012 | Rubicon Resources Ltd | Laverton | <1% | Laverton Project Combined Report C86/2010 E38/2221, 2222, 2224, 2267, 2304, 2306 Annual Report 1st Jan 2011 to |
| A95100 | 2012 | Torridon Exploration | Sunrise Dam | <1% | Sunrise Dam Project Combined Annual Exploration Report For The Year To 30th June 2012 C42/2011 For Tenements: |
| A92879 | 2012 | Barrick (Granny Smith) Pty Ltd | Barnicoat | <1% | Barnicoat Project, Annual Report for the period 1st January 2011 to 31st December 2011, M38/361-362, 483-484; |
| A92885 | 2012 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995). |
| A94717 | 2012 | Barrick (Granny Smith) Pty Ltd | Wallaby | <1% | PROJECT 8855 WALLABY PROJECT P38/3666, P39/4976 E38/1211, E38/1935, E39/1260 M38/560, M38/593, M38/690, M38/69 |
| A96046 | 2012 | White Cliff Minerals Limited | Sunrise West | <1% | Sunrise West Project P38/3883 - ANNUAL REPORT For the year ending 23rd August 2012 |
| A96196 | 2012 | Focus Minerals (Laverton) Pty Ltd | Sunrise | 12% | Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797 |
| A89526 | 2011 | Rubicon Resources Ltd | Laverton | <1% | Laverton Project Combined Report C86/2010 2010, Report Period: 1st January 2010 – 31 December 2010 |
| A89346 | 2011 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010 |
| A89375 | 2011 | Barrick (Granny Smith) Pty Ltd | Barnicoat | <1% | Project 8362 BARNICOAT PROJECT P39/4806 E38/2029, E38/2035 8/361, M38/362, M38/483, M38/484 Annual Report Peri |
| A90565 | 2011 | Crescent Gold Ltd | Childe Harold | 25% | Combined Annual Report on Exploration for the period 01/04/2010 to 31/03/2011; Childe Harold Project; C157/200 |
| A90714 | 2011 | Barrick (Granny Smith) Pty Ltd | Lake Carey | 2.4% | Project 8010 Lake Carey Project E38/1211 Partial Surrender Report, Period 30 October 2007 – 4 March 2011 techn |
| A91080 | 2011 | Barrick (Granny Smith) Pty Ltd | Wallaby | <1% | PROJECT 8855 WALLABY PROJECT ANNUAL REPORT Period 1 July 2010 – 30 June 2011 TECHNICAL REPORT No. 1437 GSWA Re |
| A91983 | 2011 | Cove Resources Limited | Sunrise Dam | <1% | Sunrise Dam Project C42/2011 Combined First Annual Report period ending 30 June 2011 for E38/2155, E38/2272 & |
| A85813 | 2010 | Barrick (Australia Pacific) Ltd | Barnicoat | <1% | Project 8362 Barnicoat Project P39/4806 E38/2029, E38/2035 M38/361, M38/362, M38/483, M38/484 Annual Report pe |
| A87437 | 2010 | Crescent Gold Ltd | Childe Harold | 25% | Combined Annual Report C133/2006 Ffor Leases E38/1652, 1ST April 2009 to 31st March 2010 |
| A87654 | 2010 | Barrick (Australia Pacific) Ltd | Lake Carey | <1% | Project 8010 Lake Carey Project E38/1211, E38/1935, E39/1260 P39/4976, Annual Report, Period 1 July 2009 – 30 |
| A88001 | 2010 | Barrick Gold Of Australia Ltd | LAKE CAREY | <1% | PROJECT 8010 LAKE CAREY PROJECT Darkstar drilling project 2009/A E39/1260 Department of Mines and Petroleum Co |
| A88423 | 2010 | Cazaly Resources Ltd | Sunrise Dam | <1% | Annual Report Sunrise Dam Project E38/2155 For the Period 14 August 2009 to 13 August 2010 |
| A81076 | 2009 | Anglogold Ashanti Australia Ltd | SUNRISE DAM GROUP | <1% | SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A84116 | 2009 | Barrick (Granny Smith) Pty Ltd | Lake Carey | <1% | LAKE CAREY PROJECT E38/1211, E38/1935, E39/1260, M38/675, M38/677 ANNUAL REPORT PERIOD 1 JUL 2008 – 30 JUN 200 |
| A82274 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | 25% | Childe Harold Project, Partial Surrender Report, E38/1652, blocks Kalgoorlie 749 p, u, y, z, and Kalgoorlie 75 |
| A82441 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | 25% | CHILDE HAROLD PROJECT Annual Report E38/1652 For the period 01/04/2008 to 31/03/2009, Group Reporting No. C157 |
| A77574 | 2008 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07 |
| A78425 | 2008 | Metex Resources Ltd | Childe Harold | 25% | CHILDE HAROLD PARTIAL SURRENDER REPORT E38/1652 blocks KALGOORLIE 0750 g,m,r,w; KALGOORLIE 0822 b,g,h,j,m,n, o |
| A78902 | 2008 | Jindalee Resources Ltd | Jubilee Well | <1% | Jubilee Well Project E38/1730 SURRENDER REPORT Report. Period 11/08/2006 - 12/06/2008 E38_1730_2008S |
| A79308 | 2008 | Barrick (Granny Smith) Pty Ltd | Lake Carey | <1% | Project 8010 Lake Carey Project E38/1211, E38/1935, E39/1260, M38/675, M38/677 Annual Report Period 1 July 200 |
| A74516 | 2007 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31 |
| A75232 | 2007 | Metex Resources Ltd | Childe Harold | 18% | Childe Harold Project, Annual Technical Report for the period 01/04/2006 - 31/03/2007, Group Reporting No C157 |
| A76087 | 2007 | Barrick Gold Of Australia Ltd | Lake Carey | <1% | Lake Carey Project E38/448, M38/675 & M38/677 Annual Report Period 1 July 2006 - 30 June 2007 TECHNICAL REPORT |
| A76156 | 2007 | Jindalee Resources Ltd | Burtville | <1% | Burtville Annual Report 2007 11/08/2006 to 11/08/2007 E38/1730 |
| A72825 | 2006 | Metex Resources Ltd | Childe Harold | 16% | W128 Childe Harold E38/1123,1529,1652,1658,P38/3211-3213, Annual Technical Report for the Period 01/04/2005 to |
| A72952 | 2006 | Crescent Gold Ltd | Jubilee Well | 49% | Surrender Report, Jubilee Well JV E38/523, Period 19 July 2005 to 18 July 2006, Surrendered 27 January 2006, ( |
| A73489 | 2006 | Barrick (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447-448,E39/387,389,M38/675,677, Annual Exploration Report for the Period 1 July 2005 t |
| A72951 | 2006 | Crescent Gold Ltd | Jubilee Well | 11% | Surrender Report, Jubilee Well JV E38/462, Period 21 January 2005 to 20 January 2006, Surrendered 27 January 2 |
| A70338 | 2005 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M |
| A70566 | 2005 | Anglogold Ashanti Australia Ltd | Laverton | 6.5% | Annual report for the period 01/01/04 - 31/12/04 Laverton Project, C164/2002, E38/199, 399, 420, 462, 523, E38 |
| A71318 | 2005 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project, E38/447,E38/448,E39/387,E39/389,M38/675, M38/677, Mount Margaret Mineral Field Western Aus |
| A68341 | 2004 | Sons Of Gwalia Ltd | Jubilee Well | 2.8% | Jubilee Well Project Surrender Report for the period 24 Febr uary 1993 to 5 February 2004 C345/1993 E38/449 Re |
| A69089 | 2004 | Placer Dome Asia Pacific Ltd | Lake Carey | <1% | Lake Carey Project, Annual exploration report for the period 1st July 2003 to 30th June 2004 |
| A71952 | 2004 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t |
| A68170 | 2004 | Anglogold Australasia Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/2003-31/12/2003, Sunrise Dam Project (C144/1995), M38/426, M38//427, M39/21 |
| A68195 | 2004 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 01/01/2003 to 31/12/2003 : P38/3083, E39/173, E39/325, E39 |
| A68313 | 2004 | Anglogold Australia Ltd | Laverton | 2.9% | Annual Report for the period 01/01/2003-31/12/2003 Laverton Project (C164/2002), E38/1010, E38/1015, E38/1066, |
| A66180 | 2003 | Anglogold Australia Ltd | Jubilee Well | 17% | Annual Report for the period 21 January 2002 to 20 January 2003 ,Jubilee Well JV Project,[C164/2002], E38/462, |
| A66523 | 2003 | Sons Of Gwalia Ltd | Jubilee Well | 2.8% | Annual Report for the period 24 February 2002 - 23 February 2003 Jubilee Well Project C50/1996: E38/449 |
| A66542 | 2003 | Anglogold Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project, , Annual Report for the period 1 January 2002 to 31 December 2002, M39/347-48, 357, 366, |
| A67737 | 2003 | Anglogold Australia Ltd | Jubilee Well | 17% | Jubilee Well JV, E38/462, E38/523, Partial Surrender Report for the period 21/01/1996- 12/11/2003. |
| A67248 | 2003 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Annual Exploration Report for the period 1 July 2002 to 30 June 2003 Lake Carey Project C401/1996: E38/447,448 |
| A65163 | 2002 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447, E38/448, E39/387, E39/389 & E39/483 M38/675, & M38/677 Verification report for the |
| A64307 | 2002 | Anglogold Australia Ltd | Jubilee Well | 17% | Annual Report for the period 21 January 2001 to 20 January 2002 Jubilee Well JV E38/462, E38/523 & E338/524. |
| A64488 | 2002 | Anglogold Australia Ltd | Sunrise Dam | <1% | Annual Report For The Period 1 January 2001 to 31 December 2001. Report No: WA 12052. Combined Report No: C144 |
| A62476 | 2001 | Sons Of Gwalia Ltd | Jubilee Well | 2.8% | Jubilee Well Project Annual Report For The Period 24 February 1999 - 23 February 2000 Tenement: E38/449. |
| A63512 | 2001 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447, E38/448, E39/387, E39/389 & E39/ 483, M38/677, M38/690, M38/691 & M38/692 Mount Ma |
| A60321 | 2000 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project, M39/347-348,357,366,373-376, M38/426, Annual Report for the Period 1/1/1999 to 31/12/1999 |
| A61259 | 2000 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project, E38/447,448,457,E39/389,483,M38/675,677, 690-692, Annual Report for the period ending 30t |
| A61954 | 2000 | Anglogold Australasia Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, M39/348, M39/357, M39/366, M39/373, M39/375, M39/376, M39/426 & M39/374 Verificat |
| A60182 | 2000 | Acacia Resources Ltd | Jubilee Well | 17% | Jubilee Well J.V; E38/462, E38/523 and E38/524; Annual report for the period 21/01/1999 to 20/01/2000 |
| A62054 | 2000 | Anglogold Australasia Ltd | Jubilee Well | 17% | Jubilee Well Project E38/462, E38/523 and E38/524 Verification Report, Annual Report for the period 21 January |
| A59288 | 1999 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447,448,457,387,389,483, Annual Report for the period ending 30/06/1999. |
| A57593 | 1999 | Acacia Resources Ltd | Jubilee Well | 17% | Acacia Resources Ltd Aurora Gold W.A Ltd Jubilee Well J.V E38/462,523.524 Annual Report For the Period 21/01/1 |
| A59057 | 1999 | Sons Of Gwalia Ltd | Jubilee Well | 2.8% | Jubilee Well JV Project (formerly Sunrise Dam JV Project) Annual report for the period 24/02/98-23/02/99, E38/ |
| A56263 | 1998 | Sons Of Gwalia Ltd | Sunrise Dam | 1.9% | Sunrise Dam JV Project Annual report for the period 24/02/97-23/02/98 E38/449 E39/421. |
| A53829 | 1998 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, 348, 357, 366, 373-376, M38/426 Annual Report - Period Ending: 31/12/1997 |
| A56250 | 1998 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 E39/483 Fifth Annual report on Exploration period e |
| A56808 | 1998 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project, Partial Surrender Report for theperiod 09/08/1992 to 11/11/1998, E38/448. |
| A57146 | 1998 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, 348, 366, 372, 374, 375, 376, M38/426 Annual Report for the period ending 31/12/9 |
| A52163 | 1997 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 E39/483 Mount Margaret Mineral Field Western Austra |
| A53166 | 1997 | Acacia Resources Ltd | Brumby Well | 17% | Jubilee Well J.V. E38/462, 523, 524 Laverton, North-Eastern Goldfields, Yilgarn W.A. Annual Report, 21/01/97 |
| A50186 | 1997 | Acacia Resources Ltd | Brumby Well | 17% | Jubilee Well Joint Venture E38/462 E38/523 and E38/524 Annual report for the period 21/01/96 to 20/01/97 Repor |
| A50393 | 1997 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347 M39/348 M39/357 M39/366 M39/373` M39/374 M39/375 M39/376 and M38/426 annual report |
| A51563 | 1997 | Sons Of Gwalia Ltd | Sunrise Dam | 1.9% | Sunrise Dam Joint Venture Annual report for the year ending 23rd February 1997 Tenements E38/449 E39/421. |
| A46846 | 1996 | Gasgoyne Gold Mines Nl | Sunrise Dam North | 1.9% | Sunrise Dam North E38/449 and Sunrise Dam West E39/421 Annual Report for the year to 23 February 1996 |
| A49079 | 1996 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 and E39/483 Mount Margaret Mineral Field Western A |
| A47061 | 1996 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project E39/174 E39/206 E39/263 E39/229 and P38/2587 Annual report for the period ending 31 Decemb |
| A47216 | 1996 | Aurora Gold Ltd | Brumby Well | 17% | H468 Brumby Well Project Western Australia Annual Technical Report for the period 21 January 1995 to 20 Januar |
| A44129 | 1995 | Gasgoyne Gold Mines Nl | Sunrise Dam North | 2.8% | Sunrise Dam North Project E38/449 Annual Report for the year to 23 February 1995 |
| A44189 | 1995 | Aurora Gold Ltd | Brumby Well | 17% | Annual Techincal Report Brumby Well Project Western Australia Exploraton Licences 38/462,38/523 and 38/524 For |
| A44303 | 1995 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Group, Annual Report for the period 1 January to 31st December 1994. E39/174, 206, 229, 263 and P3 |
| A45235 | 1995 | Placer Exploration Ltd | Lake Carey | <1% | The Lake Carey project E38/447, E38/448, E38/457, E39/387, E39/389, E39/400, P39/2797, P39/2798, P38/2799, P39 |
| A46533 | 1995 | Gasgoyne Gold Mines Nl | Sunrise Dam North east | 1.4% | Sunrise Dam North East P38/2590 to P38/2592 Annual report for the year ending 16 August 1995 |
| A40299 | 1994 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/93-31/12/93 Sunrise Dam Project E39/174,206,229,263 |
| A41168 | 1994 | Gasgoyne Gold Mines Nl | Sunrise Dam North | 2.8% | Annual Report for the Sunrise Dam North Prospect E38/449 ,for the period 01/02/1993 to 10/02/1994. |
| A41227 | 1994 | Aurora Gold Ltd | Brumby Well | 17% | Annual Technical Report Period: 21/01/93 to 21/01/94 Brumby Well Project E38/462, 38/523, 38/524 |
| A42133 | 1994 | Placer Exploration Ltd | Lake Carey | <1% | Annual Report for the period 01/07/93-30/06/94 Lake Carey Peroject E38/447-448,457 E39/387,389,400,2797-2801 |
| A39256 | 1993 | Placer Exploration Ltd | Island | <1% | Annual Report for the period 09/08/92-08/08/93 The Island Project E38/447-448 E39/387 P38/2433-2439 |
| A38820 | 1993 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/92-31/12/92 Sunrise Dam Project E39/174,206,229,263 |
| A35400 | 1992 | Poseidon Exploration Ltd | Mount Weld | 11% | Mount Weld Project, Annual Report for the year ending 31/12/1991, E38/163. |
| A36820 | 1992 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Sunrise Dam Project, Partial Surrender Report July 1992, . E39/174, 206, 229; Surrender Report E39/230. |
| A35603 | 1992 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report for 1 January 1991 to 31 December 1991 Sunrise Dam Project E39/174 E39/206 E39/229 E39/230 E39/2 |
| A32915 | 1991 | Poseidon Ltd | Mount Weld | 11% | Mt Weld Project, Annual Report for the year ending 31/12/1990, E38/163. |
| A33010 | 1991 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report for 30 June 1989 to 31 December 1990 Sunrise Dam Project E39/174 E39/206 E39/227 E39/229 E39/230 |
| A33396 | 1991 | Poseidon Ltd | Mount Weld | 11% | Mount Weld Project,1990 Partial Surrender Report, February 1991, E38/163. |
| A30632 | 1990 | Poseidon Ltd | Mount Weld | 11% | Annual report 1989. Mt. Weld Project. E38/163. Laverton Sh51-2 |
| A30847 | 1990 | Freeport Of Australia Inc | Mount Weld | 11% | Mt Weld Project, Annual report, 1988. E38/163 |
| A28729 | 1989 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report ending 30 June 1989, Sunrise Dam Project, E39/174, E39/206, E39/227, E39/229, E39/230, P39/215 |
| A14703 | 1985 | Golconda Minerals Nl | Hack Well | 4.2% | Hack Well Project, Final Surrender Report for the period ending 10/05/1985, E38/24. |
| A12968 | 1983 | Golconda Minerals Nl | Davis Well - Hack Well | 3.1% | Davis Well - Hack Well Project, Non-statutory Report: Geological Report, November 1983, E38/4, E38/24; P38/72- |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A85886 | 1753 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 5 years · 12 Mar 2031
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 38/3914 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 38/3914? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.