E 39/2513
E 39/2513 is a pending exploration licence in the Shire of Leonora, Western Australia, applied for by Anglogold Ashanti Australia Limited (part of AngloGold Ashanti). The application was received on 17 June 2024 and is awaiting a decision. The ground is covered by 187 historical WAMEX reports.
Register summary
- Holder
- Anglogold Ashanti Australia Limited
- Part of
- AngloGold Ashanti
- Local government
- Shire of Leonora, Shire of Laverton
- Application received
- 17 June 2024
The full record on E 39/2513
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Dealings, mortgages, caveats and transfer history
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A143701 | 2024 | Anglogold Ashanti Australia Limited | Kraken | <1% | Kraken E38/2345 Partial Surrender Report for the period 26 February 2010 to 17 May 2024 |
| A144249 | 2024 | Catalina Resources Ltd | Laverton | 77% | Final Report P38/4554 Laverton Project for the period ending 07/08/2024 |
| A144254 | 2024 | Catalina Resources Ltd | Laverton | 100% | Final Report P38/4555 Laverton Project for the period ending 7/8/2024 |
| A144256 | 2024 | Catalina Resources Ltd | Laverton | 100% | Final Report P38/4556 Laverton for the period 23/02/2023 to 07/08/2024 |
| A139166 | 2024 | Catalina Resources Ltd | Laverton | 77% | Annual Report P38/4554 Laverton for the period ending 22/02/2024 |
182 more reports
| A139163 | 2024 | Calalina Resources Ltd | Laverton | 100% | Annual Report P38/4555 Laverton Project for the period ending 22/02/2024 |
| A139165 | 2024 | Catalina Resources Ltd | Laverton | 100% | Annual Report P38/4556 Laverton for the period ending 22/02/2024 |
| A137208 | 2023 | Anglogold Ashanti Australia Limited | Kraken | <1% | Kraken Project (E39/1416) Partial Surrender Report to the Department of Mines, Industry Regulation and Safety |
| A136334 | 2023 | Dacian Gold Limited | Lake Carey | <1% | E38/3576 Final Surrender Report Lake Carey for the period ending 22/06/2023 |
| A132799 | 2022 | Lodestar Minerals Ltd | Jubilee Well | <1% | Annual Report for E38/3054 Jubilee Well for the period ending 12/09/2022 |
| A126296 | 2021 | Anglogold Ashanti Australia Limited | Kraken | <1% | Kraken Project (C146/2018) Partial Surrender Report to the Department of Mines, Industry Regulation and Safety |
| A126493 | 2021 | Gswa | <1% | Core Library Sampling K1127 | |
| A128857 | 2021 | Lodestar Minerals Ltd | Jubilee Well | <1% | Annual Exploration Report Jubilee Well E38/03054 for the period ending 12/09/2021 |
| A124953 | 2020 | Focus Minerals (Laverton) Pty Limited | Lake Carey | 93% | Lake Carey Regional Diamond Drilling (R20) |
| A122816 | 2020 | Anglogold Ashanti Australia Limited | Butcher Well | <1% | Butcher Well (C8/2016) Annual Group Report for the period ending 31/12/2019 |
| A125157 | 2020 | Anglogold Ashanti Australia Limited | Western Ramps | 1.3% | EIS Round 20 - Western Ramps (Final Report) |
| A122815 | 2020 | Anglogold Ashanti Australia Limited | Sunrise Dam | <1% | Sunrise Dam (C144/1995) Annual Report to the Department of Mines, Industry Regulation and Safety for the perio |
| A122827 | 2020 | Matsa Resources Limited | Red October | <1% | Red October Group Annual Report C173/2017 for the period ending 31/12/2019 |
| A124126 | 2020 | Anglogold Ashanti Australia Limited | Pink Lady | 1.3% | CO-FUNDED EIS REPORT, EIS Round 19 – Pink Lady, Sunrise Dam Gold Mine |
| A124132 | 2020 | Focus Minerals (Laverton) Pty Limited | Carey | 16% | Carey C88/2014 Annual Technical Report for the period ending 31/03/2020 |
| A124711 | 2020 | Gsm Mining Company Pty Ltd | Wallaby | 18% | Wallaby Project C168 Annual Report for the period ending 30/06/2020 |
| A122817 | 2020 | Anglogold Ashanti Australia Limited | Otway | <1% | Otway (C145/2018) Annual Group Report for the period ending 31/12/2019 |
| A122822 | 2020 | Anglogold Ashanti Australia Limited | Kraken | <1% | Kraken C146/2018 Annual Report to the Department of Mines, Industry Regulation and Safety for the period 01/01 |
| A119199 | 2019 | Anglogold Ashanti Australia Limited | Butcher Well | <1% | Butcher Well (C8/2016) Annual Report for the period 1 January 2018 to 31 December 2018 |
| A119201 | 2019 | Anglogold Ashanti Australia Limited | Otway | <1% | Otway Group (C145/2018) Annual Report for the period 1 January 2018 to 31 December 2018 |
| A119211 | 2019 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum for the Period 1 January 2018 to 3 |
| A119510 | 2019 | Matsa Resources Limited | Red October | <1% | Annual Report on Exploration Carried out over Red October Project (C173/2017) for period to 1st March 2019 |
| A119796 | 2019 | Oro Del Sur Pty Ltd | Laverton | <1% | E38/3054 Annual Technical Report for the period 13 September 2017 to 12 September 2018 |
| A120662 | 2019 | Focus Minerals (Laverton) Pty Limited | Carey | 15% | Carey project C88/2014 Annual Technical Report for the period 1 April 2018 to 31 March 2019, E 38/02872,P 38/0 |
| A120929 | 2019 | Gsm Mining Company Pty Ltd | Wallaby | 18% | Wallaby Project C168/2001 Combined Annual Report For the Period 1 July 2018 to 30 June 2019, E38/01935, E38/03 |
| A121151 | 2019 | Focus Minerals (Laverton) Pty Limited | Carey | <1% | Final Surrender Report for E38/2872 for the period 20 March 2014 to 25 July 2019 |
| A119207 | 2019 | Anglogold Ashanti Australia Limited | Kraken | <1% | Kraken (C146/2018) Annual Report for the period 1 January 2018 to 31 December 2018, E39/01416, E39/01738, E39/ |
| A120368 | 2019 | Anglogold Ashanti Australia Limited | Southern Shear - Sunrise Dam | 1.3% | EIS Southern Shear Zones – SDGM project (R#17) |
| A115551 | 2018 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project Final Surrender Report for P39/4976 for the period 24/07/2009-23/07/2017 |
| A115940 | 2018 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3 |
| A115966 | 2018 | Anglogold Ashanti Australia Limited | Butcher Well | <1% | Butcher Well (C8/2016) Group Report to the Department of Mines, Industry Regulation and Safety For the Period |
| A117034 | 2018 | Focus Minerals (Laverton) Pty Limited | Carey | 15% | Carey C88/2014 Annual Technical Report for the period 01/04/2017 - 31/03/2018, E38/02872, P38/04099, P38/04100 |
| A117575 | 2018 | Gsm Mining Company Pty Ltd | Wallaby | 20% | WALLABY PROJECT COMBINED ANNUAL TECHNICAL REPORT, C168/2001, 01 JULY 2017 - 30 JUNE 2018 |
| A118036 | 2018 | Matsa Resources Limited | Sunrise West | <1% | Sunrise West E39/1840 Annual Report for the period 1 September 2017 to 31 August 2018 |
| A114918 | 2017 | Matsa Gold Pty Ltd | Lake Carey | <1% | Lake Carey E39/1840 Annual Mineral Exploration Report For the Period 1 September 2016 to 31 August 2017 |
| A114580 | 2017 | Gsm Mining Company Pty Ltd | Wallaby | 20% | Wallaby Project C168/2001 Combined Annual Technical Report for the period 1 July 2016 to 30 June 2017, E38/012 |
| A110763 | 2017 | Matsa Gold Pty Ltd | Lake Carey | <1% | MATSA GOLD PTY LTD ANNUAL REPORT For the Period 1 September 2015 to 31 August 2016 E39/1840 |
| A112079 | 2017 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016 |
| A112355 | 2017 | Saracen Gold Mines Pty Ltd; Anglogold Ashanti Australia Limi | Butcher Well | <1% | Butcher Well Project (C8/2016) – Volume I Annual Report for the Period 1 January to 31 December 2016, E38/0312 |
| A114106 | 2017 | Focus Minerals (Laverton) Pty Limited | CAREY | 15% | Carey Project C88/2014 Combined Annual Report For the Period 1 April 2016 to 31 March 2017, E38/02872, E38/028 |
| A109072 | 2016 | Focus Minerals (Laverton) Pty Limited | Carey | 15% | Carey Project C88/2014 Combined Annual Report for the period 01/04/2015 to 31/03/2016, E38/02872, E38/02873, P |
| A109127 | 2016 | Anglogold Ashanti Australia Limited | Sunrise Dam | <1% | Partial Surrender Report for E38/2345, Sunrise Dam Project C144/1995, for the period 19/05/2010 to 27/04/2016 |
| A109737 | 2016 | Gsm Mining Company Pty Ltd | Wallaby | 20% | WALLABY PROJECT COMBINED ANNUAL TECHNICAL REPORT (C168/2001) FOR THE PERIOD 01 JULY 2015 – 30 JUNE 2015 |
| A108112 | 2016 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/ |
| A108161 | 2016 | Saracen Gold Mines Pty Ltd | Butcher Well - Mount Minnie- Mount Flore | <1% | VOL 1 - Butcher Well Project (C345/1993) Annual Report for the Period 1 January 2015 to the 31 December 2015, |
| A105466 | 2015 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 01/01/2014 - 31/12/2015, E38/2306.....P39/5063 |
| A105986 | 2015 | Focus Minerals (Laverton) Pty Ltd | Carey | 61% | Carey Project C88/2014 Combined Annual Report for the period 1 April 2014 to 31 March 2015, E38/2872, P38/4099 |
| A104859 | 2015 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Partial Surrender Report E39/1279 for the period 18/09/2008 to 17/09/2014 |
| A104898 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group | <1% | Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3 |
| A106502 | 2015 | Gsm Mining Company Pty Ltd | Wallaby | 21% | Wallaby Project C168/2001 Annual Report for the period 1 July 2014 to 30 June 2015, E38/01211, E38/01935, E39/ |
| A101216 | 2014 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201 |
| A101830 | 2014 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 01 January 2013 to 31 December 2013, E38/2306, E39 |
| A102477 | 2014 | Focus Minerals Ltd | Mount Weld | <1% | Mt Weld E38/1652 Annual Report for the period 01/09/2013 to 31/03/2014 |
| A103165 | 2014 | Gsm Mining Company Pty Ltd | Wallaby | 21% | Wallaby Project Combined Annual Technical Report (C168/2001) for the period 1 July 2013 to 30 June 2014, P38/3 |
| A103028 | 2014 | Gsm Mining Company Pty Ltd | Wallaby | 24% | Wallaby Project, Partial Surrender Report for the period 29/05/2008 to 28/05/2014, E38/1935; E39/1260. [C168/2 |
| A96848 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995) |
| A97624 | 2013 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279; |
| A100055 | 2013 | Focus Minerals (Laverton) Pty Ltd | Sunrise | <1% | Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545 |
| A99225 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Partial Surrender Report for E39/1416 for the period 12/08/2009 to 24/07/2013 |
| A99045 | 2013 | Barrick (Australia Pacific) Ltd | Wallaby | 21% | Wallaby Project Annual Report for the period 1 July 2012 – 30 June 2013, P38/3666.......M38/1137 |
| A100647 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Partial Surrender Report for Sunrise Dam E38/2345 for the period 19/05/2010 to 28/11/2013 |
| A92885 | 2012 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995). |
| A96048 | 2012 | White Cliff Minerals Limited | Sunrise West | 91% | Sunrise West Project P38/3885 - ANNUAL REPORT For the year ending 23rd August 2012 |
| A96049 | 2012 | White Cliff Minerals Limited | Sunrise West | 91% | Sunrise West Project, P38/3886 - ANNUAL REPORT For the year ending 23rd August 2012 |
| A96046 | 2012 | White Cliff Minerals Limited | Sunrise West | 100% | Sunrise West Project P38/3883 - ANNUAL REPORT For the year ending 23rd August 2012 |
| A96196 | 2012 | Focus Minerals (Laverton) Pty Ltd | Sunrise | <1% | Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797 |
| A92958 | 2012 | Rubicon Resources Ltd | Laverton | <1% | Laverton Project Combined Report C86/2010 E38/2221, 2222, 2224, 2267, 2304, 2306 Annual Report 1st Jan 2011 to |
| A93583 | 2012 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 1 January 2011 to 31 December 2011 |
| A94717 | 2012 | Barrick (Granny Smith) Pty Ltd | Wallaby | 21% | PROJECT 8855 WALLABY PROJECT P38/3666, P39/4976 E38/1211, E38/1935, E39/1260 M38/560, M38/593, M38/690, M38/69 |
| A96047 | 2012 | White Cliff Minerals Limited | Sunrise West | 100% | Sunrise West Project P38/3884 - ANNUAL REPORT For the year ending 23rd August 2012 |
| A89346 | 2011 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010 |
| A90714 | 2011 | Barrick (Granny Smith) Pty Ltd | Lake Carey | <1% | Project 8010 Lake Carey Project E38/1211 Partial Surrender Report, Period 30 October 2007 – 4 March 2011 techn |
| A89526 | 2011 | Rubicon Resources Ltd | Laverton | <1% | Laverton Project Combined Report C86/2010 2010, Report Period: 1st January 2010 – 31 December 2010 |
| A90565 | 2011 | Crescent Gold Ltd | Childe Harold | <1% | Combined Annual Report on Exploration for the period 01/04/2010 to 31/03/2011; Childe Harold Project; C157/200 |
| A91080 | 2011 | Barrick (Granny Smith) Pty Ltd | Wallaby | 21% | PROJECT 8855 WALLABY PROJECT ANNUAL REPORT Period 1 July 2010 – 30 June 2011 TECHNICAL REPORT No. 1437 GSWA Re |
| A89855 | 2011 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project Annual Report for the period 01 January 2010 to December 2010 |
| A87437 | 2010 | Crescent Gold Ltd | Childe Harold | <1% | Combined Annual Report C133/2006 Ffor Leases E38/1652, 1ST April 2009 to 31st March 2010 |
| A88001 | 2010 | Barrick Gold Of Australia Ltd | LAKE CAREY | 39% | PROJECT 8010 LAKE CAREY PROJECT Darkstar drilling project 2009/A E39/1260 Department of Mines and Petroleum Co |
| A86442 | 2010 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2009 TO 31 DECEMBER 2009 (C345/1993) |
| A87654 | 2010 | Barrick (Australia Pacific) Ltd | Lake Carey | 24% | Project 8010 Lake Carey Project E38/1211, E38/1935, E39/1260 P39/4976, Annual Report, Period 1 July 2009 – 30 |
| A81076 | 2009 | Anglogold Ashanti Australia Ltd | SUNRISE DAM GROUP | <1% | SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A82274 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | <1% | Childe Harold Project, Partial Surrender Report, E38/1652, blocks Kalgoorlie 749 p, u, y, z, and Kalgoorlie 75 |
| A82441 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | <1% | CHILDE HAROLD PROJECT Annual Report E38/1652 For the period 01/04/2008 to 31/03/2009, Group Reporting No. C157 |
| A84116 | 2009 | Barrick (Granny Smith) Pty Ltd | Lake Carey | 24% | LAKE CAREY PROJECT E38/1211, E38/1935, E39/1260, M38/675, M38/677 ANNUAL REPORT PERIOD 1 JUL 2008 – 30 JUN 200 |
| A84279 | 2009 | Jindalee Resources Limited | Pyke Hill | <1% | Pyke Hill Project E38/2119, SURRENDER REPORT Covering the period ended 2nd September 2009 |
| A77574 | 2008 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07 |
| A79308 | 2008 | Barrick (Granny Smith) Pty Ltd | Lake Carey | 21% | Project 8010 Lake Carey Project E38/1211, E38/1935, E39/1260, M38/675, M38/677 Annual Report Period 1 July 200 |
| A78034 | 2008 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2007 TO 31 DECEMBER 2007 CR GROUP: C345/1993 TENEMENTS: E38/1678 |
| A78425 | 2008 | Metex Resources Ltd | Childe Harold | <1% | CHILDE HAROLD PARTIAL SURRENDER REPORT E38/1652 blocks KALGOORLIE 0750 g,m,r,w; KALGOORLIE 0822 b,g,h,j,m,n, o |
| A75083 | 2007 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher'S Well Project, Annual Report, 01 January 2006 to 31 December 2006. (C345/1993) |
| A76087 | 2007 | Barrick Gold Of Australia Ltd | Lake Carey | 2.2% | Lake Carey Project E38/448, M38/675 & M38/677 Annual Report Period 1 July 2006 - 30 June 2007 TECHNICAL REPORT |
| A74516 | 2007 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31 |
| A75232 | 2007 | Metex Resources Ltd | Childe Harold | <1% | Childe Harold Project, Annual Technical Report for the period 01/04/2006 - 31/03/2007, Group Reporting No C157 |
| A72825 | 2006 | Metex Resources Ltd | Childe Harold | <1% | W128 Childe Harold E38/1123,1529,1652,1658,P38/3211-3213, Annual Technical Report for the Period 01/04/2005 to |
| A73489 | 2006 | Barrick (Granny Smith) Pty Ltd | Lake Carey | 15% | Lake Carey Project E38/447-448,E39/387,389,M38/675,677, Annual Exploration Report for the Period 1 July 2005 t |
| A69663 | 2005 | Sons Of Gwalia Ltd | Butcher Well | <1% | Annual report for the period 01/01/04 - 31/12/04 Butcher Well Project, C345/1993, P38/3083, P39/3939, E38/449 |
| A70338 | 2005 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M |
| A70845 | 2005 | Jindalee Resources Ltd | Lake Carey | <1% | Lake Carey Project E38/1212, Report for the period ending 23 March 2005, Mt Margaret mineral field (Laverton). |
| A71318 | 2005 | Placer (Granny Smith) Pty Ltd | Lake Carey | 15% | Lake Carey Project, E38/447,E38/448,E39/387,E39/389,M38/675, M38/677, Mount Margaret Mineral Field Western Aus |
| A68195 | 2004 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 01/01/2003 to 31/12/2003 : P38/3083, E39/173, E39/325, E39 |
| A68170 | 2004 | Anglogold Australasia Ltd | Sunrise Dam | 1% | Annual Report for the period 01/01/2003-31/12/2003, Sunrise Dam Project (C144/1995), M38/426, M38//427, M39/21 |
| A68341 | 2004 | Sons Of Gwalia Ltd | Jubilee Well | 17% | Jubilee Well Project Surrender Report for the period 24 Febr uary 1993 to 5 February 2004 C345/1993 E38/449 Re |
| A68999 | 2004 | Jindalee Resources Ltd | Lake Carey | <1% | Annual report for the period ending 23/03/2004 Lake Carey Project |
| A69089 | 2004 | Placer Dome Asia Pacific Ltd | Lake Carey | 15% | Lake Carey Project, Annual exploration report for the period 1st July 2003 to 30th June 2004 |
| A71952 | 2004 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t |
| A66523 | 2003 | Sons Of Gwalia Ltd | Jubilee Well | 17% | Annual Report for the period 24 February 2002 - 23 February 2003 Jubilee Well Project C50/1996: E38/449 |
| A66542 | 2003 | Anglogold Australia Ltd | Sunrise Dam | 1.5% | Sunrise Dam Project, , Annual Report for the period 1 January 2002 to 31 December 2002, M39/347-48, 357, 366, |
| A66956 | 2003 | Jindalee Resources Ltd | Lake Carey | <1% | Annual Report for the period ending 23 March 2003 E38/1212 Lake Carey Project Mt Margaret Mineral Field |
| A67248 | 2003 | Placer (Granny Smith) Pty Ltd | Lake Carey | 14% | Annual Exploration Report for the period 1 July 2002 to 30 June 2003 Lake Carey Project C401/1996: E38/447,448 |
| A66524 | 2003 | Sons Of Gwalia Ltd | Butcher Well | <1% | Annual Report for the period 1 January 2002 - 31 December 2002 Butcher Well C345/1993: E39/325, 328, 344, 423, |
| A67535 | 2003 | Sons Of Gwalia Ltd | Wilga Well West | <1% | Annual Report for the period 12 October 2002 to 11 October 2003 Wilga Well West JV Project E39/378 Report No. |
| A64488 | 2002 | Anglogold Australia Ltd | Sunrise Dam | 1.5% | Annual Report For The Period 1 January 2001 to 31 December 2001. Report No: WA 12052. Combined Report No: C144 |
| A65163 | 2002 | Placer (Granny Smith) Pty Ltd | Lake Carey | 14% | Lake Carey Project E38/447, E38/448, E39/387, E39/389 & E39/483 M38/675, & M38/677 Verification report for the |
| A65765 | 2002 | Jindalee Resources Ltd | Lake Carey | <1% | Lake Carey Project E38/1212. Annual Report For The Period Ending 23 March 2002. |
| A64070 | 2002 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 1st January 2001 to 31st December 2001, E39/325, 328, 344, |
| A65497 | 2002 | Sons Of Gwalia Ltd | Wilga Well West | <1% | Wilga Well West JV Annual Report For The Period 12/10/01 - 11/10/02 Tenement: E39/378. Report No. 0451-2002-01 |
| A62476 | 2001 | Sons Of Gwalia Ltd | Jubilee Well | 17% | Jubilee Well Project Annual Report For The Period 24 February 1999 - 23 February 2000 Tenement: E38/449. |
| A62683 | 2001 | Horizon Mining Nl | Lake Carey | <1% | Lake Carey Project E38/1212 Annual Report For The Period Ending 23rd March 2001 Mt Margaret Mineral Field Geol |
| A63512 | 2001 | Placer (Granny Smith) Pty Ltd | Lake Carey | 13% | Lake Carey Project E38/447, E38/448, E39/387, E39/389 & E39/ 483, M38/677, M38/690, M38/691 & M38/692 Mount Ma |
| A62854 | 2001 | Sons Of Gwalia Ltd | Camelback / Butcher Well / Linden | <1% | Butcher Well Annual Report For The Period 1 January 2000 - 31 December 2000. Tenements E39/173, E39/325, E39/3 |
| A63625 | 2001 | Sons Of Gwalia Ltd | Wilga Well West | <1% | Wilga Well West JV Annual Report for the period 12/10/00-11/ 10/01 tenement E39/378. |
| A60349 | 2000 | Sons Of Gwalia Ltd | Wilga Well West | <1% | Wilga Well West JV, Annual Report for the Period 12/10/1998 to 11/10/1999, E39/378. |
| A61790 | 2000 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Annual Report for the Period 01/01/1999 to 31/12/1999. E39/173,325,328,344,384,423,475,532, M39/1 |
| A60321 | 2000 | Acacia Resources Ltd | Sunrise Dam | 1.5% | Sunrise Dam Project, M39/347-348,357,366,373-376, M38/426, Annual Report for the Period 1/1/1999 to 31/12/1999 |
| A61259 | 2000 | Placer (Granny Smith) Pty Ltd | Lake Carey | 13% | Lake Carey Project, E38/447,448,457,E39/389,483,M38/675,677, 690-692, Annual Report for the period ending 30t |
| A61954 | 2000 | Anglogold Australasia Ltd | Sunrise Dam | 1.5% | Sunrise Dam Project M39/347, M39/348, M39/357, M39/366, M39/373, M39/375, M39/376, M39/426 & M39/374 Verificat |
| A57548 | 1999 | Sons Of Gwalia Ltd | Wilga Well West | <1% | Wilga Well West JV Annual Report For 12/10/97 - 11/10/98 E39/378 |
| A58497 | 1999 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well JV - 01/01/98 - 31/12/98 M39/118-120, 165-166, 230-232 E39/173, 281, 325, 328, 344, 384, 423, 475 |
| A59057 | 1999 | Sons Of Gwalia Ltd | Jubilee Well | 17% | Jubilee Well JV Project (formerly Sunrise Dam JV Project) Annual report for the period 24/02/98-23/02/99, E38/ |
| A59288 | 1999 | Placer (Granny Smith) Pty Ltd | Lake Carey | 13% | Lake Carey Project E38/447,448,457,387,389,483, Annual Report for the period ending 30/06/1999. |
| A54584 | 1998 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well Project Combined Annual Technical Report For period 01/01/97-31/12/97 Ref:C345/93 Tenements E39/1 |
| A53829 | 1998 | Acacia Resources Ltd | Sunrise Dam | 1.5% | Sunrise Dam Project M39/347, 348, 357, 366, 373-376, M38/426 Annual Report - Period Ending: 31/12/1997 |
| A56250 | 1998 | Placer (Granny Smith) Pty Ltd | Lake Carey | 13% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 E39/483 Fifth Annual report on Exploration period e |
| A56263 | 1998 | Sons Of Gwalia Ltd | Sunrise Dam | 12% | Sunrise Dam JV Project Annual report for the period 24/02/97-23/02/98 E38/449 E39/421. |
| A56808 | 1998 | Placer (Granny Smith) Pty Ltd | Lake Carey | 2.4% | Lake Carey Project, Partial Surrender Report for theperiod 09/08/1992 to 11/11/1998, E38/448. |
| A57146 | 1998 | Acacia Resources Ltd | Sunrise Dam | 1.5% | Sunrise Dam Project M39/347, 348, 366, 372, 374, 375, 376, M38/426 Annual Report for the period ending 31/12/9 |
| A50393 | 1997 | Acacia Resources Ltd | Sunrise Dam | 1.5% | Sunrise Dam Project M39/347 M39/348 M39/357 M39/366 M39/373` M39/374 M39/375 M39/376 and M38/426 annual report |
| A51563 | 1997 | Sons Of Gwalia Ltd | Sunrise Dam | 12% | Sunrise Dam Joint Venture Annual report for the year ending 23rd February 1997 Tenements E38/449 E39/421. |
| A50531 | 1997 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project Combined Annual Technical Report for period 1st January 1996 to 31st December 1996 Teneme |
| A52163 | 1997 | Placer (Granny Smith) Pty Ltd | Lake Carey | 13% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 E39/483 Mount Margaret Mineral Field Western Austra |
| A46521 | 1996 | Gasgoyne Gold Mines Nl | Wilga Well West | <1% | Wilga Well West Joint Venture E39/378 Annual report for the year ending 11 October 1995 |
| A46846 | 1996 | Gasgoyne Gold Mines Nl | Sunrise Dam North | 12% | Sunrise Dam North E38/449 and Sunrise Dam West E39/421 Annual Report for the year to 23 February 1996 |
| A49079 | 1996 | Placer (Granny Smith) Pty Ltd | Lake Carey | 13% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 and E39/483 Mount Margaret Mineral Field Western A |
| A47061 | 1996 | Acacia Resources Ltd | Sunrise Dam | 1.5% | Sunrise Dam Project E39/174 E39/206 E39/263 E39/229 and P38/2587 Annual report for the period ending 31 Decemb |
| A47727 | 1996 | Sons Of Gwalia Ltd | Camelback-Butcher Well | <1% | Butcher Well Gold Project Combined Annual Technical Report for period 1st January 1995 to 31st December 1995 R |
| A43353 | 1995 | Gasgoyne Gold Mines Nl | Sunrise-Wilga | <1% | Sunrise-Wilga projects Wilga West - E39/378 Annual report for the year to 11th October 1994 |
| A44129 | 1995 | Gasgoyne Gold Mines Nl | Sunrise Dam North | 17% | Sunrise Dam North Project E38/449 Annual Report for the year to 23 February 1995 |
| A44303 | 1995 | Acacia Resources Ltd | Sunrise Dam | 1.5% | Sunrise Dam Group, Annual Report for the period 1 January to 31st December 1994. E39/174, 206, 229, 263 and P3 |
| A45235 | 1995 | Placer Exploration Ltd | Lake Carey | 14% | The Lake Carey project E38/447, E38/448, E38/457, E39/387, E39/389, E39/400, P39/2797, P39/2798, P38/2799, P39 |
| A43925 | 1995 | Mount Burgess Mining Nl | Butcher Well | <1% | Butcher Well Project, Combined Annual Report E39/173, 281, 323, 325, 328 & 344, M39/118-120, 165-166, 230-232 |
| A40299 | 1994 | Billiton Australia Pty Ltd | Sunrise Dam | 1.5% | Annual Report for the period 01/01/93-31/12/93 Sunrise Dam Project E39/174,206,229,263 |
| A42133 | 1994 | Placer Exploration Ltd | Lake Carey | 14% | Annual Report for the period 01/07/93-30/06/94 Lake Carey Peroject E38/447-448,457 E39/387,389,400,2797-2801 |
| A41168 | 1994 | Gasgoyne Gold Mines Nl | Sunrise Dam North | 17% | Annual Report for the Sunrise Dam North Prospect E38/449 ,for the period 01/02/1993 to 10/02/1994. |
| A40601 | 1994 | Mount Burgess Mining Nl | Camelback, Butcher Well, Linden | <1% | Butcher Well Project, Annual report for period 1 January 1993 to 31 December 1993, C345/93 |
| A39256 | 1993 | Placer Exploration Ltd | Island | 21% | Annual Report for the period 09/08/92-08/08/93 The Island Project E38/447-448 E39/387 P38/2433-2439 |
| A38820 | 1993 | Billiton Australia Pty Ltd | Sunrise Dam | 1.5% | Annual Report for the period 01/01/92-31/12/92 Sunrise Dam Project E39/174,206,229,263 |
| A36331 | 1992 | Billiton Australia Pty Ltd | Soak Well | 2.2% | Soak Well Project,Partial Surrender Report,May 1992, E39/174 & E39/227. |
| A36820 | 1992 | Billiton Australia Pty Ltd | Sunrise Dam | 1.6% | Sunrise Dam Project, Partial Surrender Report July 1992, . E39/174, 206, 229; Surrender Report E39/230. |
| A35603 | 1992 | Billiton Australia Pty Ltd | Sunrise Dam | 1.5% | Annual report for 1 January 1991 to 31 December 1991 Sunrise Dam Project E39/174 E39/206 E39/229 E39/230 E39/2 |
| A33010 | 1991 | Billiton Australia Pty Ltd | Sunrise Dam | 1.5% | Annual report for 30 June 1989 to 31 December 1990 Sunrise Dam Project E39/174 E39/206 E39/227 E39/229 E39/230 |
| A35174 | 1991 | Newcrest Mining Ltd | Sunrise Dam | 2.2% | Final Report from Soak Well Joint Venture from February 1991 to May 1991. E39/174 and E39/227. Billeton Austr |
| A33196 | 1991 | Billiton Australia Pty Ltd | Freshwater Swamp | 2.2% | Freshwater Swamp Project,Partial Surrender Report, 21st March 1991, E39/174. |
| A28729 | 1989 | Billiton Australia Pty Ltd | Sunrise Dam | 1.6% | Annual report ending 30 June 1989, Sunrise Dam Project, E39/174, E39/206, E39/227, E39/229, E39/230, P39/215 |
| A3932 | 1973 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Final Report for the period 1st July 1972 to 30th June 1973, TR70/37 |
| A2782 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1971, TR70/3730 & 5279H. |
| A2829 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1972, TR70/3730H. |
| A3618 | 1972 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Miscellaneous Maps (1-20), for the period ending 31/12/1972, TR70/3 |
| A941 | 1971 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1970, TR70/3730H & 5279H. |
| A2584 | 1970 | Mines Administration Pty Ltd | Lake Carey - Sunrise Dam | 36% | Non-statutory Report on Lake Carey - Sunrise Dam Block of Mineral Claims MC 2159 - 2170, MC 2260-2265, MC 2440 |
| A271 | 1970 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the period ending 30th June 1969, TR70/3730H. |
| A60588 | 1970 | Mines Administration Pty Ltd | Lake Carey / Sunrise Dam | 36% | Report on Lake Carey - Sunrise Dan Block of Mineral Claims MC39/2159 to MC39/2170, MC39/2260 to MC39/2265, MC3 |
| A1121 | 1969 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report:;Volume 1: Report on the Induced Polarization & Resistivity Survey on |
| A1122 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Appendix 2:Annual Report, June 30th 1969, TR70/3730H; Report on the |
| A1123 | 1969 | International Nickel Southern Exp Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Annual Report for the period ending 30th June 1969, TR70/3730H. A Re |
| A269 | 1968 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the year ending 30th June 1968, TR70/3730H. |
| A270 | 1968 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Non-statutory Report: Report on the Induced Polarisation & Resistivity Survey on the Deep |
| A268 | 1967 | International Nickel Aust Ltd | Lake Carey | <1% | Lake Carey Project, Annual Report for the year ending 30th June 1967, TR70/3730H. |
| A50044 | 1753 | Sons Of Gwalia Ltd | Wilga Well West | <1% | Wilga Well West Joint Venture Annual report for the year ending 11th October 1996 Tenement E39/378 Report No.0 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A81890 | 1753 | Saracen Gold Mines Pty Ltd | BUTCHER WELL | <1% | BUTCHER WELL PROJECT (C345/1993), ANNUAL REPORT – 01 JANUARY 2008 TO 31 DECEMBER 2008, E38/1678, E39/173, E39/ |
| A85886 | 1753 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A94604 | 1753 | Saracen Gold Mines Pty Ltd | Lake Carey | <1% | Lake Carey Project. Royalties for Regions - Exploration Incentive Scheme. Report for the period 01/02/2011 to |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 39/2513 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 39/2513? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-09. Compiled by NextMaps. Verify against primary sources before reliance.