E 77/3376
Register summary
- Holder
- Mining Equities Pty Ltd
- Local government
- Shire of Yilgarn
- Application received
- 12 Jan 2026
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A154777 | 2026 | Yilgarn Iron Investmemts Pty Ltd | Parker Range | <1% | Final Surrender Report For E77/2615 Parker Range for the period ending 10/03/2026. |
| A148799 | 2025 | Mineral Resources Ltd; Yilgarn Iron Pty Ltd | Parker Range | <1% | Parker Range E77/02615 Annual Report for the period ending 10/3/2025 |
| A150718 | 2025 | Golden Horse Minerals Limited | E77/2149 | <1% | Partial Surrender Report for E77/2149 for the period ending 23/09/2025. |
| A143323 | 2024 | Riversgold (Australia) Pty Ltd | Bullfinch | 59% | Marvel Loch E77/2418 Partial Surrender Report for the period ending 30/04/2024. |
| A143378 | 2024 | Riversgold Pty Ltd | Bullfinch | 59% | Bullfinch E77/2418 Annual Technical Report for the period ending 30/04/2024 |
245 more reports with detail
| A139374 | 2024 | Riversgold Pty Ltd | Bull Finch | 59% | Annual Report for Bullfinch E77/2418 for the period ending 30/04/2023 |
| A142912 | 2024 | Yilgarn Iron Pty Ltd | Split Rocks | <1% | Annual Report E77/2615 - Parker Range for the Period 11/3/2023 to 10/3/2024 |
| A135231 | 2023 | Yilgarn Iron Pty Ltd | Split Rocks | <1% | Annual Report E77/2615 Split Rocks for the Period 11/3/2022 to 10/3/2023 |
| A136290 | 2023 | Xantippe Sx Pty Ltd. | E77/2367 | <1% | E77/2367 Partial Surrender Report for the period 5/7/2017 to 04/07/2023 |
| A131660 | 2022 | Mining Equities Pty Ltd | Dalmore | 59% | Annual Report for the Dalmore Project (E77/2418) from 1/5/2021 to 31/4/2022 |
| A125868 | 2021 | Parnell S | East Edwards | <1% | Annual Report for the East Edwards Project (E77/2404) from 7/6/2019 to 8/6/2020 |
| A126279 | 2021 | Parnell S | Edwards | <1% | Annual Report for the East Edwards Project (E77/2404) from 7/6/2019 to 8/6/2020 |
| A126666 | 2021 | Tianye Sxo Gold Mining Pty Ltd | Cockatoo Granite | <1% | Cockatoo Granite E 77/2209 Partial Surrender Report for the period ending 29/12/2020 |
| A128773 | 2021 | Ev Metals Australia Pty Limited | Dalmore | 59% | Dalmore Annual Tenement Report E 77/02418 for the period 1 May 2020 to 30 April 2021. |
| A124022 | 2020 | Minjar Gold Pty Ltd | Edwards Find | <1% | Edwards Find C216/2017 Annual Report for the period ending 29/02/2020 |
| A125078 | 2020 | Barto Gold Mining Pty Ltd | Southern Cross North | 3.4% | Combined Technical Report C160/2006 Southern Cross North for the period ending 30/06/2020 |
| A124599 | 2020 | Bullfinch Metals | Dalmore | 59% | Annual Report for the Dalmore Project (E77/2418) from 1/5/2019 to 30/4/2020 |
| A125682 | 2020 | Xantippe Resources Limited | "Ghoorlie" | <1% | Annual report Ghoorlie project C177/2017 for the period 1 August 2019 to 31 July 2020 |
| A125491 | 2020 | Bullseye Mining Limited | Southern Cross | <1% | C44/2017 Southern Cross Project Annual Report for the period ending 31/08/2020 |
| A120452 | 2019 | Bullfinch Metals | Dalmore | 59% | Annual Report For the Dalmore Project (E77/2418) from 1/5/2018 to 30/4/2019 |
| A120420 | 2019 | Minjar Gold Pty Ltd | Edwards Find | <1% | Edwards Find C216/2017 Annual Report for the period 1 March 2018 to 28 February 2019, M77/00160, M77/00265, M7 |
| A121301 | 2019 | Minjar Gold Pty Ltd; Tianye Sxo Gold Mining Pty Ltd | Southern Cross North | 2.8% | Combined Mineral Exploration Report C160/2006 Southern Cross North Project for the period 1 July 2018 to 30 Ju |
| A121550 | 2019 | Parnell S | East Edwards | <1% | Annual Report for the East Edwards Project (E77/2404) from 7/6/2018 to 8/6/2019 |
| A122094 | 2019 | Bullseye Mining Limited | Southern Cross | <1% | C44/2017 Southern Cross Project Annual Report for the period 1 September 2018 to 31 August 2019 |
| A116867 | 2018 | Tianye Sxo Gold Mining Pty Ltd; Minjar Gold Pty Ltd | Edwards Find | <1% | Edwards Find C216/2017 Annual Report for the period 1 March 2017 to 28 February 2018, M77/00160, E77/01793, E7 |
| A117500 | 2018 | Minjar Gold Pty Ltd | Southern Cross North | 2.7% | 2018 C160/2006 Annual Report Southern Cross North, 01 July 2017 - 30 June 2018 |
| A117770 | 2018 | Duketon Consolidated Pty Ltd | Marvel Loch North | <1% | Marvel Loch North E77/2367 Annual Report for the period 05/07/2017 to 04/07/2018 |
| A118398 | 2018 | Bullseye Mining Limited | Southern Cross | <1% | C44/2017 Southern Cross Project for the period 01/09/2017 - 31/08/2018 |
| A112094 | 2017 | Hanking Gold Mining Pty Ltd | Edwards Find | <1% | Edwards Find Project Exploration Licence 77/2209 Annual Report for the period 29/12/2015 to 28/12/2016 |
| A112600 | 2017 | Bullseye Mining Limited | Marvel Loch North | <1% | Marvel Loch North E77/2149 Annual Report for the period 11 March 2016 to 10 March 2017 |
| A114588 | 2017 | Tianye Sxo Gold Mining Pty Ltd; Minjar Gold Pty Ltd | Southern Cross Operations | 3.1% | Combined Annual Report C160/2006 Southern Cross Operations for the period 1 July 2016 to 30 June 2017 |
| A115283 | 2017 | Bullseye Mining Limited | Southern Cross | <1% | Southern Cross Project C44/2017 Annual Report for the period 1 September 2016 to 31 August 2017, P77/04015, E7 |
| A115339 | 2017 | Hanking Gold Mining Pty Ltd | Southern Cross | <1% | Exploration Licence 77/2209 Southern Cross Project Annual Report for the period 29 December 2014 to 28 Decembe |
| A108767 | 2016 | Bullseye Mining Limited | Marvel Loch North | <1% | Annual Report Marvel Loch North E77/2149 Reporting Period 11th March 2015 – 10th March 2016 |
| A109727 | 2016 | Hanking Gold Mining Pty Ltd | Southern Cross North | 3.1% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2015 to 30 June 2016 |
| A106441 | 2015 | Bullseye Mining Limited | Marvel Loch North | <1% | Annual Report Marvel Loch North E77/2149 Reporting Period: 11th March 2014 – 10th March 2015 |
| A106588 | 2015 | Hanking Gold Mining Pty Ltd | Southern Cross North | 8.6% | Southern Cross North Project C160/2006 Annual Report for the period 01/07/2014 - 30/06/2015 |
| A100943 | 2014 | Southern Cross Goldfields Ltd | Mount Rankin | 51% | Mt Rankin Project, Annual Report for the period 24/10/2012 to 23/10/2013, E77/1289. |
| A100809 | 2014 | Southern Cross Goldfields Ltd | Battle - Glendower | 11% | Battle - Glendower Project, Annual Report for the period 01/11/2012 to 31/10/2013, M77/166, 1025 & 1044; P77/3 |
| A101675 | 2014 | Urban Minerals Pty Ltd | Jaccoletti | 100% | Jaccoletti Project Annual Report (Combined Report Group C83/2013) P77/4108, P77/4109, P77/4110 and E77/2016. 1 |
| A102953 | 2014 | Southern Cross Goldfields Ltd | Battle Glendower | 15% | Battle Glendower Project, Final Surrender Report for the period 15/12/2011 to 23/07/2014, P77/4112-4113, 4124- |
| A102986 | 2014 | Southern Cross Goldfields Ltd | Blackbournes | <1% | Blackbournes Project, Annual Report for the period 1st May 2013 to 30/04/2014, E771233, 1599, 1726, 1837; M77/ |
| A103443 | 2014 | Cazaly Resources Ltd | Parker Range | 38% | Annual Report E77/2068 Parker Range Project For the Period 17th July 2013 to 30th June 2014 |
| A103822 | 2014 | Southern Cross Goldfields Ltd | Blackbournes | <1% | EXPLORATION LICENCE E77/1726 Yilgarn Mineral Field Final Surrender Report for the period 21 September 2010 to |
| A96712 | 2013 | Urban Minerals Pty Ltd | Jaccoletti | 100% | Jaccoletti Project Annual Report Prospecting Licence P77/4108 for the period 16 December 2011 – 15 December 20 |
| A96713 | 2013 | Urban Minerals Pty Ltd | Jaccoletti | 100% | Jaccoletti Project Annual Report Prospecting Licence P77/4109 for the period 16 December 2011 – 15 December 20 |
| A96714 | 2013 | Ucabs Pty Ltd | Jaccoletti | 100% | Jaccoletti Project Verification Report Prospecting Licence P77/4110 16 December 2011 – 15 December 2012 |
| A96583 | 2013 | Southern Cross Goldfields Ltd | Mount Franklin | 51% | Mt Rankin E77/1289 Yilgarn Mineral Field Annual Report for the period 24 October 2011 to 23 October 2012 |
| A97851 | 2013 | Urban Minerals Pty Ltd | Jaccoletti | 100% | Jaccoletti Project, Annual Report for the period 20th February 2012 to 19th February 2013, P77/2016. |
| A98572 | 2013 | Southern Cross Goldfields Ltd | Blackbournes | 2% | Combined annual report for the Blackbournes Project, C127/2009 (E77/1233, E77/1599, E77/1726, E77/1837, M77/94 |
| A92663 | 2012 | Southern Cross Goldfields Ltd | Battler - Glendower | 11% | Battler - Glendower Project combined annual report for the period 1 November 2010 to 31 October 2011, M77/166 |
| A94706 | 2012 | Southern Cross Goldfields Ltd | Blackbournes | 2% | Combined annual report for the Blackbournes Project, C127/2009 (E77/1233, E77/1599, E77/1726, E77/1837, M77/94 |
| A92665 | 2012 | Southern Cross Goldfields Ltd | Battler–Glendower | 23% | Surrender report for the Battler–Glendower Project, P77/3523–6 (C103/2003), Yilgarn Mineral Field, for the per |
| A94612 | 2012 | St Barbara Ltd | Southern Cross North | 5% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2011 to 30 June 2012, E77/1379......P77/385 |
| A95847 | 2012 | Inca Minerals Ltd | Southern Cross | 2% | Southern Cross Project E77/1898 Annual report for the period ending 02 October 2012 |
| A89102 | 2011 | Renaissance Minerals Ltd | Marvel Loch | 51% | Marvel Loch, Annual Report E77/1289 Marvel Loch for the period 24 October 2009 to 23 October 2010 |
| A89224 | 2011 | Renaissance Minerals Ltd | Marvel Loch | 51% | Marvel Loch, Partial Surrender Report for E77/1289, 24 October 2007 to 23 October 2010 |
| A91166 | 2011 | St Barbara Ltd | Southern Cross North | 1.6% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2010 to 30 June 2011 |
| A91354 | 2011 | Southern Cross Goldfields Ltd | Blackbournes | <1% | Blackbournes Project Combined Annual Report for the Period 1/05/2010 to 30/04/2011, C127/2009, E77/1233, E77/1 |
| A92101 | 2011 | Renaissance Minerals Ltd | Marvel Loch | 51% | Partial Surrender Report for E77/1289 24 October 2007 to 23 October 2011 |
| A92169 | 2011 | Renaissance Minerals Ltd | Marvel Loch | 51% | 2011 Annual Report for E77/1289, 24 October 2010 to 23 October 2011 |
| A85624 | 2010 | Gryphon Minerals Ltd | Marvel Loch | 51% | Marvel Loch, Annual Report for the period 24 October 2008 to 23 October 2009 |
| A87644 | 2010 | St Barbara Ltd | Southern Cross North | 1.4% | Southern Cross North C160/2006 Annual Report for the Period 1 July 2009 to 30 June 2010 |
| A88404 | 2010 | Temby Minerals Pty Ltd | FORRESTANIA | 85% | ANNUAL MINERAL EXPLORATION REPORT P77/3446 FORRESTANIA PROJECT For the Period 4 October 2009 to 3 October 2010 |
| A88968 | 2010 | Southern Cross Goldfields Ltd | Battler - Glendower | 11% | BATTLER-GLENDOWER PROJECT M77/166, M77/1025, M77/1044, P77/3523-P77/3526, P77/3645-3648 COMBINED ANNUAL REPORT |
| A82552 | 2009 | Dynasty Metals Australia Ltd | Southern Cross | 100% | Annual Report P 77/3536 Southern Cross for the Period Ending 21/02/2009 |
| A82555 | 2009 | Dynasty Metals Australia Ltd | Southern Cross | 100% | Annual Report P 77/3534 Southern Cross for the Period Ending 21/02/2009 |
| A82556 | 2009 | Dynasty Metals Australia Ltd | Sothern Cross | 14% | Annual Report P 77/3533 Southern Cross for the Period Ending 21/02/2009 |
| A81044 | 2009 | Gryphon Minerals Ltd | Marvel Loch | 51% | Marvel Loch, Annual Report for the period 24 October 2007 to 23 October 2008 |
| A82554 | 2009 | Dynasty Metals Australia Ltd | Southern Cross | 100% | Annual Report P 77/3535 Southern Cross for the Period Ending 21/02/2009 |
| A82638 | 2009 | Gryphon Minerals Ltd | Mt Rankin “Battler” | <1% | E77/1447 Mt Rankin “Battler” Annual Report for the period 13th May 2008 to 12th May 2009 |
| A82775 | 2009 | Gryphon Minerals Ltd | Mt Rankin (Battler) | <1% | Mt Rankin “Battler” Project E77/1447 Annual Report for the period 13th May 2008 to 12th May 2009 |
| A84313 | 2009 | Gryphon Minerals Ltd | Mt Rankin (Battler) | <1% | E77/1447 “Battler” Surrender Report, Period: 13th May 2008 to 8th July 2009 |
| A84537 | 2009 | St Barbara Ltd | Southern Cross North | 1.4% | Southern Cross North Project, Annual Report for the Period 1 July 2008 to 30 June 2009, C160/2006, E77/1090, E |
| A80710 | 2008 | Southern Cross Goldfields Ltd | BATTLER-GLENDOWER | 11% | BATTLER-GLENDOWER PROJECT M77/166, M77/1025, M77/1044, P77/3523-3524, P77/3525, P77/3526, P77/3645-3648, COMBI |
| A80258 | 2008 | Clara Resources Pty Ltd | Forrestania | 85% | ANNUAL REPORT For the Period 4th October 2007 – 3rd October 2008 On PL77/3446 Forrestania Au/Ni Project |
| A74054 | 2007 | Dominion Mining Ltd | Wockallary and Tamarin | 8.6% | Southern Cross (C177/2006) Group Annual Report, Wockallary E77/1152, Tamarin E77/1156, From 1 October 2005 to |
| A76602 | 2007 | Dominion Mining Ltd | Wockallary | 17% | SURRENDER REPORT E77/1152 'WOCKALLARY' From 23 February 2004 to 20 September 2007 |
| A76795 | 2007 | Dominion Mining Ltd | Tamarin | <1% | SOUTHERN CROSS SURRENDER REPORT 'TAMARIN' From 21 September 2006 to 30 November 2007 |
| A75239 | 2007 | Dominion Mining Ltd | Wockallary | 17% | Partial Surrender Report E77/1152 'Wockallary' From 23 February 2004 to 22 February 2007 Yilgarn Mineral Field |
| A75920 | 2007 | St Barbara Ltd | Southern Cross North | <1% | Southern Cross North Project, Annual Report for the period 1 July 2006 - 30 June 2007, E77/462......M77/17.... |
| A71907 | 2006 | St Barbara Mines Ltd | Yilgarn Star | 1.2% | Yilgarn Star Project, Annual Report for the period 1 January 2005 to 31 December 2005, C188/1994, E77/486..... |
| A72816 | 2006 | St Barbara Mines Ltd | Marvel Loch | 9.4% | Marvel Loch Project, Annual Report for the Period 1 May 2005 to 30 April 2006, Combined Reporting No. C99/2003 |
| A73564 | 2006 | St Barbara Ltd | Jupiter | <1% | Jupiter Project, Annual Report for the Period 16 September 2005 to 15 September 2006, E77/714, M77/86, M77/133 |
| A70240 | 2005 | Sons Of Gwalia Ltd | Yilgarn Star | 1.2% | Yilgarn Star Project, Annual report for the period 01/01/04 - 31/12/04,C188/1994, E77/486, E77/1090, M77/31, M |
| A70717 | 2005 | Dominion Mining Ltd | Wockallary | 17% | Annual report E77/1152, Wockallary, From 23 February 2004 to 22 February 2005 (Southern Cross). |
| A70789 | 2005 | St Barbara Mines Ltd | Marvel Loch | 9.4% | Marvel Loch Project, Annual Report for the period 1st May 2004 to 30th April 2005, M77/7-8, 10, 26, 112-114, 2 |
| A71385 | 2005 | St Barbara Mines Ltd | Edwards Find | <1% | Edwards Find Project, Annual report for the period 16 August 2004 - 15 August 2005, (Tenements M77/160,M77/265 |
| A71370 | 2005 | St Barbara Mines Ltd | Jupiter | <1% | Jupiter Project, Annual Report for the period 16th September 2004 to 15th September 2005, (Combined Reporting |
| A67994 | 2004 | Sons Of Gwalia Ltd | May Queen | 23% | May Queen Project, Annual Report for the period 12 April 2003 to 16 September 2003, C66/1998:M77/106, M77/554, |
| A68101 | 2004 | Sons Of Gwalia Ltd | Jaccoletti | 17% | Jaccoletti Project, Annual Report M77/112, M77/358, M77/598 for the period 17 December 2002 to 16 December 200 |
| A68694 | 2004 | Independence Group Nl | Tamarin | 53% | Annual report for the period 16/04/2003-15/04/2004 Tamarin Project E77/1108 |
| A68769 | 2004 | Sons Of Gwalia Ltd | Marvel Loch | 9.4% | Annual report for the period 01/05/2003-30/04/2004 Marvel loch Operations Project(099/2003), M77/7-8, M77/10, |
| A68962 | 2004 | Sons Of Gwalia Ltd | May Queen | 73% | Surrender report for the period 18/01/1993-17/06/2004 May Queen Project M77/571 |
| A69166 | 2004 | Sons Of Gwalia Ltd | Edwards Find | <1% | Annual report for the period 16/08/2003-15/08/2004 Edwards Find Project(C344/1996), M77/160, M77/265, M77/266 |
| A69473 | 2004 | Sons Of Gwalia Ltd | Jupiter | 1.6% | Annual report for the period 16/09/03 - 15/09/04 Jupiter Project,C002/2004, M77/86, M77/133, M77/159, M77/175 |
| A67993 | 2004 | Sons Of Gwalia Ltd | Glendower | 4% | Annual Report for the period 22/03/2003- 16/09/2003 Glendower Project (C338/1996), M77/408, M77/564, P77/2912- |
| A68104 | 2004 | Sons Of Gwalia Ltd | Mary Lena | 3.5% | Mary Lena Project, Annual ReportM77/555, M77/668, P77/2922 for the period 22 December 2002 to 21 December 200 |
| A68255 | 2004 | Sons Of Gwalia Ltd | Yilgarn Star | 1.3% | Yilgarn Star Project,Annual Report for period 01/01/2003 to 31/12/2003 :E77/480, E77/486, M77/31, M77/72, M77/ |
| A65802 | 2003 | Sons Of Gwalia Ltd | Sandalwood | 5.8% | Sandalwood Project ,Annual Report for the period 1 January 2001 - 27 May 2002. M77/672, P77/2878-2905, 3104. [ |
| A65908 | 2003 | Sons Of Gwalia Ltd | Jaccoletti | 17% | Annual Report for the period 17 December 2001-16 December 2002 Jaccoletti Project, M77/112, M77/358, M77/598. |
| A65911 | 2003 | Sons Of Gwalia Ltd | Mary Lena | 3.5% | Mary Lena Project, Annual Report for the period 22/12/01-21/12/02. [C195/1996] M77/555, M77/668, P77/2922 . |
| A66663 | 2003 | Sons Of Gwalia Ltd | May Queen | 23% | May Queen Project, Annual Report for the period 12 April 2001-11 April 2003, C66/1998: M77/106, 554, 571, 732 |
| A66664 | 2003 | Sons Of Gwalia Ltd | Glendower | 4% | Glendower Project, Annual Report for the period 21 March 2002 - 20 March 2003, [C338/1996], M77/408, 564, P77/ |
| A67111 | 2003 | Sons Of Gwalia Ltd | Sandalwood | <1% | Sandalwood Project, Surrender Report for the period 1st October 1992 to 4th July 2003, P77/2878-2892,2894-2899 |
| A67193 | 2003 | Sons Of Gwalia Ltd | Starfinch | 93% | Surrender Report for the period 28 May 1992 to 30 July 2003 Starfinch Project [C243/1995] P77/2854, M77/644 . |
| A67194 | 2003 | Sons Of Gwalia Ltd | Jaccoletti | 85% | Jaccoletti Project, Surrender Report for the period 6 July 1989 to 4 July 2003, M77/358.[C250/1996] |
| A67375 | 2003 | Sons Of Gwalia Ltd | Starfinch | 21% | Starfinch Project, Annual Report for the period 1 August 2002 to 31 July 2003, M77/525,644,2854, [C243/1995] |
| A67571 | 2003 | Sons Of Gwalia Ltd | May Queen | 40% | May Queen Project , Annual Report for the period 12th April 2000 to 11th April 2001, M77/571 & 732. [C66/1998] |
| A67610 | 2003 | Sons Of Gwalia Ltd | May Queen | 11% | Surrender Report for C66/1998 Tenements Surrendered on 24 July 2003. May Queen Project M77/106,P77/2920-2921,P |
| A66944 | 2003 | Sons Of Gwalia Ltd | May Queen | 62% | Surrender Report for C66/1998 Tenement Surrendered on 14 January 2003 May Queen Project M77/781 Report No. 034 |
| A67008 | 2003 | Sons Of Gwalia Ltd | Gatherers | 55% | Gatherers Project, Surrender Report for C390/1995 for the period 23 June 1994 to 20 May 2003, M77/620-621. |
| A67010 | 2003 | Sons Of Gwalia Ltd | Sandalwood | 5.8% | Sandalwood Project, Annual Report for the period 28 May 2002 to 27 May 2003 M77/672; P77/2878-2905 & 3104. [C1 |
| A67330 | 2003 | Sons Of Gwalia Ltd | Edwards Find | <1% | Annual Report for the period 16 August 2002 - 15 August 2003 Edwards Find Project C344/1996: M77/160,265,266,3 |
| A63927 | 2002 | Sons Of Gwalia Ltd | Jaccoletti | 17% | Jaccoletti Project , Annual Report for the period 17 December 2000 - 16 December 2001, M77/112, M77/358, M77/5 |
| A65110 | 2002 | Sons Of Gwalia Ltd | Starfinch | 21% | Starfinch Project, Annual Report For The Period 1 August 2001 - 31 July 2002, M77/525, M77/644, P77/2854 [C243 |
| A65341 | 2002 | Sons Of Gwalia Ltd | Moonargidding Rock | 16% | Moonargidding Rock Surrender Report For The Period 18 May 1991 - 19 August 2002. Tenements: E77/328, M77/800, |
| A64941 | 2002 | Mr Carnicelli N | Delmore | 93% | Report For Period 14/5/01 To 14/5/02 On M77/513 & 77/776 Situated on cleared freehold farmland ' Delmore Proje |
| A65092 | 2002 | Sons Of Gwalia Ltd | Edwards Find | <1% | Edwards Find Project , Final Surrender Report for the period 25th May 1992 to 16thMay 2002, E77/454.. |
| A65245 | 2002 | Sons Of Gwalia Ltd | Gatherers | 55% | Gatherers Project ,Annual Report For The Period 1/9/01 To 31/8/02, M77/620 & 621. |
| A65244 | 2002 | Sons Of Gwalia Ltd | Edwards Find | <1% | Edwards Find Project Annual Report For The Period 16 August 2001 - 15 August 2002 Tenements: M77/160, M77/265, |
| A63001 | 2001 | Sons Of Gwalia Ltd | Jaccoletti | 17% | Jaccoletti Project , Annual Report For The Period 17/12/98 - 16/12/2000, M77/112, M77/598, M77/358 |
| A63496 | 2001 | Sons Of Gwalia Ltd | Starfinch | 21% | Starfinch Project ,Annual Report for the period 1 August 2000 - 31 July 2001, M77/525 & 644; P77/2854. |
| A63627 | 2001 | Sons Of Gwalia Ltd | Moonargidding Rock | 14% | Moonargidding Rock Annual Report for the period 26 October 2 000 - 25 October 2001, tenements E77/328, E77/493 |
| A62471 | 2001 | Sons Of Gwalia Ltd | Glendower | 4% | Glendowner Project, Annual Report For The Period 22 March 2000 - 21 March 2001. Tenements: M77/408, M77/564, P |
| A62472 | 2001 | Sons Of Gwalia Ltd | May Queen | 68% | May Queen Surrender Report For The Period 18 April 1997 - 17 April 2001. Tenement: P77/3236. Report No: 0341-5 |
| A62953 | 2001 | Sons Of Gwalia Ltd | Marvel Loch | <1% | Marvel Lock Joint Venture Annual Report For The Period 1 January 1997 To 31 December 2000. Tenements: E77/435, |
| A63159 | 2001 | Platinum Australia Ltd | Northonopine Rock | 4.6% | Northonopine Rock E77/964, Parker Range area, Yilgarn Mineral Field, Western Australia. Surrender Report. Tech |
| A63208 | 2001 | Australian Gold Resources Ltd | Southern Cross | 3.4% | E77/527, E77/533 ,Southern Cross Project, Annual Report C91/1997 for the period 11 May 2000 To 10 May 2001. |
| A59984 | 2000 | Sons Of Gwalia Ltd | Moonargidding Rock | 14% | Moonargidding Rock Project Annual Report for the Period 26 October 1998 to 25 October 1999. E77/328, E77/493, |
| A59995 | 2000 | Sons Of Gwalia Ltd | Mary Lena | 3.5% | Mary Lena Project Annual report for the period 22/12/1998 to 21/12/1999 Tenements M77/555,M77/668,P77/2922,P77 |
| A60611 | 2000 | Sons Of Gwalia Ltd | May Queen | 26% | May Queen, Annual Report for the Period 12 April 1999 to 11 April 2000, M77/106,554,571,732,781, P77/2920,2921 |
| A61021 | 2000 | Sons Of Gwalia Ltd | Starfinch | 21% | Starfinch Project, Annual Report for the Period 01/08/1999 to 31/07/2000, M77/525,644, P77/2854. |
| A59576 | 2000 | Sons Of Gwalia Ltd | Starfinch | 21% | Starfinch Project ,Annual Report for the period 01/08/98 - 31/07/99 M77/525, 644; P77/ 2854 |
| A59669 | 2000 | Sons Of Gwalia Ltd | Gatherers | 55% | Gatherers Project, Annual report for the period 01/09/1998 to 31/08/1999, M77/620 & 621. |
| A59677 | 2000 | Sons Of Gwalia Ltd | Edwards Find | <1% | Edwards Find Project, Annual Report For The Period 16/8/1998 to 15/8/1999,E77/454, M77/160,265,266,376,2935- 2 |
| A60141 | 2000 | Sons Of Gwalia Ltd | North Edwards | 1% | Yilgarn Mineral Field. North Edwards Annual Resource Summary Report, 24 January 1999 to 23 January 2000 Teneme |
| A61226 | 2000 | Sons Of Gwalia Ltd | Frog Rock | 61% | Frog Rock Project, Partial Surrender Report for the period 07/06/1999 to 06/06/2000. E77/708. |
| A61371 | 2000 | Mr Carnicelli Le | Delmore | 93% | Report for Period 14/05/1999 to 14/05/2000 on M77/513 & M77/776, situated on cleared freehold farmland 'Delmor |
| A61410 | 2000 | Sons Of Gwalia Ltd | Glendower | 4% | Glendower Project, Annual Report for the period 22/03/1999 to 21/03/2000, M77/408,564; P77/2912-2919. |
| A61411 | 2000 | Sons Of Gwalia Ltd | Edwards Find | <1% | Edwards Find Project, Annual Report for the Period 16/08/1999 to 15/08/2000, E77/454, M77/160,265,266,376, P77 |
| A62393 | 2000 | Sons Of Gwalia Ltd | Moonargidding Rock | 14% | Moonargidding Rock Project Annual Report for the Period 26 October 1999 to 25 October 2000. E77/328, E77/493, |
| A57493 | 1999 | Sons Of Gwalia Ltd | North Edwards | 1% | Yilgarn Mineral Field North Edwards. Annual resource summary report 24/01/98-23/01/99. M77/265-266. |
| A58138 | 1999 | Sons Of Gwalia Ltd | Moonargidding Rock | 14% | Moonargidding Rock Project Annual Report for the Period 26 October 1997 to 25 October 1998. E77/328, E77/493, |
| A58335 | 1999 | Sons Of Gwalia Ltd | Mary Lena | 3.5% | Mary Lena Project, Annual Report For the period 22/12/1997 to 21/12/1998 M77/555,668, P77/2922,3217. |
| A58336 | 1999 | Sons Of Gwalia Ltd | Jaccoletti | 17% | Jaccoletti Project Annual Report For the Period 17/12/1997 to 16/12/1998, M77/112,358,598 |
| A58659 | 1999 | Mr Carnicelli N | Delmore- Jaccoletti West | 99% | Annual Report for period 14/05/98-14/05/99 on M77/513 , 'Delmore' Jaccoletti West Project. |
| A59189 | 1999 | Sons Of Gwalia Ltd | Glendower | 4% | Glendower Project, Annual Report for the period 22/03/98-21/03/99. M77/408,564;P77/2912-2919. |
| A59368 | 1999 | Sons Of Gwalia Ltd | May Queen | 26% | May Queen Project, Annual Report for the Period 12 April 1998 to 11 April, 1999, M77/106, 554, 571, 781, 2763, |
| A57073 | 1999 | Sons Of Gwalia Ltd | Gatherers | 55% | Gatherers Project, Annual Report for 01/09/97 - 31/08/98 M77/620 & 621. |
| A57514 | 1999 | Fargo Investments Pty Ltd | Marvel Loch | 12% | E77/659 Marvel Loch Project, annual report. Reporting period from 27 February 1998 to 26 February 1999 |
| A57640 | 1999 | Sons Of Gwalia Ltd | StarFinch | 21% | StarFinch Project M77/525,644,2854 Reporting Period 1/8/97 to 31/7/98 |
| A58296 | 1999 | Sons Of Gwalia Ltd | Marvel Loch | <1% | Marvel Loch Joint Venture 01/01/98 - 31/12/98 E77/435, 480, 543, 676 |
| A59421 | 1999 | Sons Of Gwalia Ltd | Frog Rock | 61% | Frog Rock Project, Annual Report for the Period 7-6-98 to 6-6-99, E77/708, 913. |
| A54679 | 1998 | Sons Of Gwalia Ltd | Frog Rock | 61% | Frog Rock Project, Partial Surrender Report for the period 7-6-96 to 6-6-97, E77/708. |
| A54936 | 1998 | Sons Of Gwalia Ltd | Moonargidding Rock | 14% | Annual Report for the period 26/10/96-25/10/97 Moonargidding Rock Project E77/328,493 M77/681,800,825 |
| A55906 | 1998 | Sons Of Gwalia Ltd | May Queen | 26% | May Queen, Annual Report for 12/04/97 - 11/04/98 M77/106, 554, 571, 781, P77/2763, 2920-2921, 2924-2929, P77/3 |
| A56014 | 1998 | Australian Gold Resources Ltd | Southern Cross | <1% | Southern Cross, C91/1997, Exploration Licence:E77/527, 533 Joint Annual report, For the period 11/05/97 - 10/0 |
| A58660 | 1998 | Mr Carnicelli N | Delmore | 93% | Technical Report review of exploration data Jacoletti West Prospect, Marvel Loch and Delmore Project M77/513 M |
| A55254 | 1998 | Mr Carnicelli N | Delmore -Jaccoletti West | 99% | 'Delmore' Jaccoletti West Project, Marvel Loch, Annual Report M77/513 14/05/97 - 14/05/98. |
| A54218 | 1998 | Minair Exploration Pty Ltd | Marvel Loch | 12% | E77/659 Marvel Loch Project, annual report. Reporting period from 26 February 1997 to 27 February 1998 |
| A55082 | 1998 | Sons Of Gwalia Ltd | Mary Lena | 3.5% | Mary Lena Project, Annual Report 22/12/96 - 21/12/97 M77/555, 668, P77/2922, 3217 |
| A56122 | 1998 | Sons Of Gwalia Ltd | Frog Rock | 61% | Frog Rock Project, Annual Report for the Period 7-6-97 to 6-6-98, E77/708. |
| A56337 | 1998 | Sons Of Gwalia Ltd | Glendower | 4% | Glendower Project. Annual Report for the period 22/03/97-21/03/98. M77/408,564. P77/2912-2919. |
| A56592 | 1998 | Mr Carnicelli N | Delmore | 93% | Delmore Project, Annual Report : A Review of Exploration Data,November 1998, [Jacoletti West - Marvel Loch], |
| A56616 | 1998 | Sons Of Gwalia Ltd | Jaccoletti | 17% | Jaccoletti Project, Annual Report for the period 01/12/1996 to 01/12/1997, M77/112, 358 & 598. |
| A56976 | 1998 | Mr Carnicelli N | Delmore | 93% | Delmore Project, Non-statutory Report: Review of Exploration Data, November 1998, M77/513 & 776. |
| A59260 | 1998 | Sons Of Gwalia Ltd | North Edwards | 1% | Yilgarn Mineral Field, North Edwards, Annual Resource Summary Report, 24 January 1997 to 23 January 1998, M77/ |
| A52079 | 1997 | Sons Of Gwalia Ltd | May Queen | 26% | Yilgarn Mineral Field May Queen Project Annual report for the period 12 April 1996 to 11 April 1997 Tenements |
| A52213 | 1997 | Sons Of Gwalia Ltd | Frog Rock | 61% | Frog Rock Project, Annual Report for the period 7-6-96 to 6-6-97, E77/708. |
| A52349 | 1997 | Sons Of Gwalia Ltd | Cockatoo Rock | 6.6% | Cockatoo Rock Project, Annual Report for the period 22/05/1996 to 21/05/1997, E77/717. |
| A52350 | 1997 | Sons Of Gwalia Ltd | Jaccoletti | 17% | Jaccoletti Project, Annual Report for the period 17/12/95 to 16/12/96 M77/112, 358, & 598. |
| A52864 | 1997 | Sons Of Gwalia Ltd | Marvel Loch | <1% | Marvel Loch Joint Venture Project, Annual report for the period 01/01/96-31/12/96. |
| A51646 | 1997 | Mr Carnicelli N | Jaccoletti West | 99% | M77/513 Jaccoletti West Exploration Field Season 1996 to 1997 June 1997 |
| A52004 | 1997 | Sons Of Gwalia Ltd | Glendower | 4% | Glendower Project , Annual Report for the period 22 March 1996 to 21 March 1997, M77/408, M77/564; P77/2912 to |
| A53910 | 1997 | Sons Of Gwalia Ltd | Starfinch | 21% | Starfinch Project, Annual report for the period 01/08/96-31/07/97 , ML77/525 ML77/644 PL77/2854. |
| A50636 | 1997 | Sons Of Gwalia Ltd | Edwards Find | <1% | Edwards Find Project, Partial Surrender Report E77/454 for period 25/05/1992 to 24/05/1995. |
| A50666 | 1997 | Fargo Investments Pty Ltd | Marvel Loch | 12% | E77/659 Marvel Loch tenement, annual report. Reporting period from 27 February 1996 to 26 February 1997 |
| A50764 | 1997 | Sons Of Gwalia Ltd | Mary Lena | 3.5% | Mary Lena Project, Annual Report for the period 22 December 1995 to 21 December 1996 , ML77/555 ML77/668 and |
| A49237 | 1996 | Sons Of Gwalia Ltd | Edwards Find | <1% | Edwards Find Project Yilgarn Mineral Field Annual Report for the period 16 August 1995 to 15 August 1996 E77/4 |
| A47387 | 1996 | Sons Of Gwalia Ltd | Glendower | 4% | Glendower Project, Annual Report for the period 22/03/95 to 21/03/96, M77/408, M77/564; P/2912 to PL77/2919. |
| A47581 | 1996 | Gasgoyne Gold Mines Nl | Marvel Loch Joint Venture | <1% | 1995 Annual report Marvel Loch Joint Venture Marvel Loch, Yilgarn Mineral Field Tenements (E77/435, E77/480, E |
| A47953 | 1996 | Sons Of Gwalia Ltd | May Queen | 27% | Yilgarn Mineral Field May Queen Project Annual report for the period 12/04/95 to 11/04/96 Tenements: Mining Le |
| A49429 | 1996 | Sons Of Gwalia Ltd | Gatherers | 55% | Gatherers Project ,Annual report for the period 1 September 1995 to 31 August 1996, M77/620 and M77/621. |
| A49631 | 1996 | Sons Of Gwalia Ltd | Moonargidding Rock | 13% | Annual Report for the period 10/95-10/96 Moonargidding Rock Project E77/179,328,493 M77/681 P77/2931-2934 |
| A50368 | 1996 | Sons Of Gwalia Ltd | Starfinch | 21% | Starfinch Project ,Annual report for the period 1 August 1995 to 31 July 1996 Tenements ML77/525 and ML77/644 |
| A44105 | 1995 | Reynolds Yilgarn Gold Operations Ltd | Glendower | 4% | Glendower Project, M77/408, M77/564, P77/2912-2919, Annual Report for the period 22nd March 1994 To 21st Marc |
| A44802 | 1995 | Gasgoyne Gold Mines Nl | Marvel Loch | <1% | 1994 Annual report for the Marvel Loch Joint Venture Marvel Loch, Yilgarn Mineral Field |
| A44951 | 1995 | Sons Of Gwalia Ltd | May Queen | 27% | Yilgarn Mineral Field May Queen Western Australia Mining Leases M77/106 M77/554 M77/571 Prospecting Licences P |
| A44975 | 1995 | Mr Carnicelli N | Jaccoletti West | 99% | Jaccoletti West Project, Annual Report for the period 14/5/94 to 14/5/95 M77/513. |
| A45717 | 1995 | Sons Of Gwalia Ltd | Moonagidding Rock | 13% | Annual Report for the period 26/10/94-25/10/95 Moonargidding Rock Project E77/179,328,493 M77/681 P77/2931-293 |
| A45790 | 1995 | Sons Of Gwalia Nl | Gatherers | 55% | Gatherers Project, Annual Report for the period 1 September 1994 to 31 August 1995, M77/620 & 621. |
| A44839 | 1995 | Mr Mcdonald Mj | Southern Cross | 12% | Southern Cross project, Exploration Licence E77/533,Annual Report for the period 27 April 1994 to 26 April 199 |
| A45000 | 1995 | Sons Of Gwalia Ltd | Starfinch | 21% | Starfinch Project Annual Report for the period 1 August 1994 to 31 July 1995 M77/525.664,PL77/2854 |
| A45208 | 1995 | Sons Of Gwalia Ltd | Edwards Find | <1% | Edwards Find Project Annual report for the period 16 August 1994 to 15 August 1995 Tenements EL77/454 ML77/160 |
| A47981 | 1995 | Sons Of Gwalia Ltd | Jaccoletti | 17% | Jaccoletti Project , Annual Report for the period 16th December 1994 to 17th December 1995, M77/112 M77/358 & |
| A48129 | 1995 | Sons Of Gwalia Ltd | Mary Lena | 3.5% | Mary Lena Project, Annual Report for the period 28 October 1994 to 27 October 1995 ,ML77/555 ML77/668 and P77 |
| A40617 | 1994 | Reynolds Yilgarn Gold Operations Ltd | Jaccoletti Hill JV/Jaccoletti Hill/Prinz | 100% | Report for the period 1993 Jaccoletti Hill JV/Jaccoletti Hill/Prinz/Marvel Loch Project M77/598 |
| A41033 | 1994 | Reynolds Yilgarn Gold Operations Ltd | May Queen | 27% | Annual report for the period 12/04/93-11/04/94 May Queen Project M77/106 M77/554 M77/571 P77/2763 P77/2871 P7 |
| A41172 | 1994 | Gasgoyne Gold Mines Nl | Marvel Loch | 1.7% | 1993 Annual Report for the Marvel Loch Joint Venture: Marvel Loch Yilgarn Mineral Field (E77/251, E77/435, E7 |
| A41840 | 1994 | Reynolds Yilgarn Gold Operations Ltd | May Queen [West Jacoletti] | 55% | Annual Report for the period 01/09/93-31/08/94, May Queen(West Jaccoletti) Project,M77/620 & 621. |
| A41841 | 1994 | Reynolds Yilgarn Gold Operations Ltd | Edwards Find/Sth Yilgarn | <1% | Annual Report for the period 16/08/93-15/08/94 Edwards Find/Sth Yilgarn Project M77/160,265,266,376 E77/454 P7 |
| A41929 | 1994 | Reynolds Yilgarn Gold Operations Ltd | Prinz/Marvel Loch | 100% | Annual Report for the period 04/05/93-03/05/94 Prinz/Marvel Loch Project M77/598 |
| A42493 | 1994 | Cambrian Resources Nl | Marvel Loch | 7.5% | 1994 Annual Report (period 01/08/93 to 31/07/94) Marvel Loch Project M77/525 P77/285 |
| A42615 | 1994 | Reynolds Yilgarn Gold Operations Ltd | Strawberry Rocks | 18% | Annual Report for the period 10/93-10/94 Strawberry Rocks Project E77/328 |
| A40832 | 1994 | Reynolds Australia Metals Ltd | Glendower | 4% | Glendower Project, M77/408,M77/564;P77/2912-2919, Annual Report for the Period 22 March 1993 to 21 March 1994 |
| A37730 | 1993 | Reynolds Yilgarn Gold Operations Ltd | East Edwards-Moonagidding Rocks | 13% | Annual Report for the period 26/10/91-25/10/92 East Edwards-Moonagidding Rocks Project E77/179,289,328 M77/373 |
| A39252 | 1993 | Reynolds Yilgarn Gold Operations Ltd | May Queen-Lennenburg West | 27% | Annual Report for the period 12/04/92-11/04/93 May Queen/Lennenburg West Project M77/106,554,571 P77/2763,2871 |
| A37686 | 1993 | Reynolds Australia Metals Ltd | Marvel Loch | 18% | Marvel Loch Project, Partial Surrender Report, February 1993, E77/328. |
| A39067 | 1993 | Cambrian Resources Nl | Marvel Loch | 21% | Annual report for the period 01/08/92-31/07/93 Marvel Loch Project M77/525 P77/2854 |
| A39227 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Glendower | 4% | Annual Report for the period 22/03/92-21/03/93 Glendower Project M77/408,564 P77/1984-1987,2912-2919 |
| A39730 | 1993 | Broken Hill Metals Nl | May Queen | 5.8% | Annual report for the period 1992-1993 May Queen Project M77/555 |
| A39732 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Mountain Queen/Jaccoletti Hill | 16% | Annual report for the period 12/92-12/93 Mountain Queen/Jaccoletti Hill Project M77/112 |
| A39736 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Mountain Queen/Jaccoletti Hill | 16% | Report for the period 1993 Mountain Queen/Jaccoletti Hill Project M77/112 |
| A39737 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Mountain Queen/Jaccoletti Hill | 16% | Report for the period 1993 Mountain Queen/Jaccoletti Hill Project M77/112 |
| A40616 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Jaccoletti Hill JV/Beta/Four Threes/Geel | 16% | Report for the period 1993 Jaccoletti Hill JV/Beta/Four Threes/Geelong Project M77/112 |
| A40619 | 1993 | Reynolds Yilgarn Gold Operations Ltd | East Edwards-Moonagidding Rocks | 12% | Annual Report for the period 26/10/92-25/10/93 East Edwards-Moonagidding Rocks Project E77/289,328,493 P77/293 |
| A40624 | 1993 | Reynolds Yilgarn Gold Operations Ltd | Edwards Find/South Yilgarn | <1% | Annual Report for the period 16/08/92-15/08/93 Edwards Find/Sth Yilgarn Project E77/454 M77/160,265-266,376 P7 |
| A35180 | 1992 | Orion Resources Nl | Burbidge | <1% | Annual Technical Report for the Period ending 31/12/91 Burbidge Joint Venture Tenements E77/251, GML77/4798, M |
| A36521 | 1992 | Reynolds Yilgarn Gold Operations Ltd | May Queen | 30% | Annual Report for the period 12/04/91-11/04/92 May Queen Project |
| A37628 | 1992 | Reynolds Yilgarn Gold Operations Ltd | Edwards Find | <1% | Annual report for the period 16/08/91-15/08/92 Edwards Find South Yilgarn Project M77/160 M77/264-266 M77/376 |
| A35390 | 1991 | Reynolds Australia Metals Ltd | Edwards Find | <1% | Annual report for the period 16/08/90-15/05/91 Edwards Find Project M77/160 M77/264-266 M77/376 |
| A34841 | 1991 | Reynolds Yilgarn Gold Operations Ltd | May Queen | 32% | Annual report for the period 12/04/90-11/04/91 May Queen Project M77/106 M77/127 M77/233 M77/248 M77/316 M77/4 |
| A35389 | 1991 | Reynolds Yilgarn Gold Operations Ltd | Moonargidding Rocks | 13% | Moonargidding Rocks Project, Annual Report for the period 26th October 1990 to 25th October 1991, E77/179, 289 |
| A29777 | 1990 | Mawson Pacific Ltd | Jaccoletti | 6% | Jaccoletti Mining Lease; ML77/316 Yilgarn Mineral Field; Annual Report 16/11/88 - 15/11/89 |
| A30424 | 1990 | Great Victoria Gold Ltd | Sandalwood | <1% | Progress Report (until 30/11/89) Sandalwood Joint Venture (E77/46 M77/164,205-206,242-245,318 351 P77/1192) |
| A30641 | 1990 | Mawson Pacific Ltd | North Jaccoletti | 59% | Yilgarn Mineral Field - North Jaccoletti Sept 1990 M77/127, M 77/136, P77/2037, P77/2038, P77/2039 and P77/2 |
| A31186 | 1990 | Cambridge Mining Services | Mountain Queen | 16% | Report on exploration on M77/112 for the period ending 15 December 1989. Cambridge Mining Services Pty Ltd Nev |
| A31869 | 1990 | Mawson Pacific Ltd | Edwards Find | <1% | Yilgarn Mineral Field. Edwards Find. M77/160,264-267,374-376,444-446. Annual Report to 15/08/90. |
| A31973 | 1990 | Mawson Pacific Ltd | May Queen | 14% | Yilgarn Mineral Field, WA. May Queen Annual Report. M77/106,279,298,410. 91989-1990). |
| A28230 | 1989 | Mawson Pacific Ltd | Jaccoletti West | 67% | Jaccoletti West Mining Lease. ML77/127 Yilgarn Mineral Field 20/07/88 - 21/07/89 |
| A28550 | 1989 | Mawson Pacific Ltd | May Queen | 27% | May Queen. M77/279. Yilgarn Mineral Field. Annual report (8/8/88 to 7/8/89) |
| A29405 | 1989 | Mawson Pacific Ltd | May Queen | 22% | May Queen, M77/298, Yilgarn Mineral Field. Annual report, 16/11/88 to 15/11/89 |
| A23403 | 1988 | Aust Consolidated Minerals Ltd | Marvel Queen | 39% | Marvel Queen Joint Venture. Annual Report to 25/01/88 (M77/127,233,248 P77/1367,1786,1836). |
| A23795 | 1988 | Great Victoria Gold Ltd | Sandalwood/Keyhole | <1% | Sandalwood / Keyhole Joint Venture. 1987 Annual Report E77/46,M77/164, M77/205 to M77/206, M77/243 to M77/245 |
| A25157 | 1988 | Jingellic Minerals Nl | Mountain Queen | 16% | Annual Report on M77/112 for the period 14/12/87 to 14/12/88 (Mountain Queen Project, Marvel Loch, Southern cr |
| A21182 | 1987 | Mr Muskett R | Mountain Queen | 16% | Geolgocial Report on Diamond Drilling of former GML's77/4434 and GML77/4646 Mountain Queen Gold Mine, Marvel L |
| A25158 | 1987 | Jingellic Minerals Nl | Mountain Queen | 8.5% | 1987 RAB Drilling Programme. M77/31,112. (Mountain Queen & Omega, Southern Cross). |
| A18168 | 1986 | Nevoria Gold Mines Ltd | Marvel Loch | 12% | Report on Geological Investigations ML77/30 Nevoria Gold Mines July 1986 (Marvel Loch Project) |
| A14771 | 1985 | Nevoria Gold Mines Ltd | Mountain Queen/Marvel Loch | 11% | Aquisition, Processing and Interpretation Report on Necoria Joint Venture, Marvel Loch Grid, Ground Magnetic S |
| A15714 | 1985 | Southern Goldfields Ltd | Marvel Loch North & South | 12% | Non-statutory Report : Marvel Loch North M77/30, Marvel Loch South P77/494 1984 Geological Report on RAB Dril |
| A15716 | 1985 | Southern Goldfields Ltd | Mountain Queen | 13% | Mountain Queen Project, Non-statutory Report: Geological Report on Drilling 01/11/1984 to 31/12/1984 , GML77/ |
| A14623 | 1984 | Kia Ora Gold Corp Nl | Marvel Loch | 27% | May Queen Surface Exploration. Report fot the 1984 Calander Year G.M.L. 77/4857. |
| A15715 | 1984 | Southern Goldfields Ltd | Mountain Queen | 12% | Mountain Queen Project, Non-statutory Report: Laterite Drilling,October 1984, M77/30. |
| A11830 | 1982 | Bhp Minerals Pty Ltd | Mountain Queen/Marvel Loch | 19% | Report on Exploration and Reserve Circulation Drilling M48-M90. May 1981 - February 1982 |
| A11832 | 1982 | Bhp Minerals Pty Ltd | Mountain Queen | 40% | Report on rotary airblast drilling, March-May, 1982 |
| A10612 | 1981 | Bhp Minerals Pty Ltd | Mountain Queen/Marvel Loch | 36% | Dampier Joint Venture Mountain Queen Area - Report on Exploration and Drilling July 1980 to April 1981 |
| A5713 | 1975 | Tenneco Australia Inc | Southern Cross | 1% | Southern Cross Project, Non-statutory Report: Appendix B, To accompany Statutory Report [A5493], December 1974 |
| A5252 | 1974 | Great Boulder Mines Ltd | Jaccoletti | 93% | Jaccoletti, [Non-statutory report], GML77/4646, 4647, 4434 |
| A5493 | 1974 | Tenneco Australia Inc | Southern Cross | 1% | Southern Cross Project, Non-statutory Report, December 1974, MC77/5562 ...77/5743, [See also A5713] |
All 263 report numbers over this ground
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 77/3376 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 77/3376 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 77/3376? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.