L 37/290
Register summary
- Holder
- Genesis Minerals (Leonora) Pty Ltd
- Local government
- Shire of Leonora
- Application received
- 23 Jan 2025
- Commenced
- 9 July 2025
- Expiry
- 8 July 2046
- Term
- 21 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A149258 | 2025 | Asra Minerals Limited | Mount Stirling – Diorite | <1% | Mount Stirling – Diorite E 37/01504 Final Surrender Report for the period ending 27/3/2025 |
| A142842 | 2024 | Sensore Yilgarn Ventures Pty Ltd; Yilgarn Exploration Ventur | Christmas Well | 58% | Christmas Well Project C44/2021 Final Surrender for the period ending 30 April 2024 |
| A138394 | 2024 | Sensore Yilgarn Ventures Pty Ltd | 8 Mile Well | 100% | 8 Mile Well Project Combined Annual Technical Report C255/2022 for the period ending 07/11/2023 |
| A138596 | 2024 | Kin West Wa Pty Ltd | Desdemona | 5.1% | Final Surrender Report for Desdemona Tenement E37/1152 for the period ending 11/12/2023. |
| A144330 | 2024 | Saturn Metals Limited | Artemis | <1% | Apollo Hill Project: Partial Surrender Report for Exploration License E40/372‘Artemis from 03/07/2018 |
245 more reports with detail
| A133713 | 2023 | Sensore Yilgarn Ventures Pty Ltd | 8 Mile Well | 100% | 8 Mile Well Project Combined Annual Technical Report C255/2022 for the period ending 07/11/2022. |
| A135458 | 2023 | Yilgarn Exploration Ventures Pty Ltd | Christmas Well | 59% | Christmas Well Project Combined Annual Technical Report - C44/2021 for the period ending 10/03/2023 |
| A137758 | 2023 | Western Explorers Pty. Ltd. | Leonora | 100% | Leonora Project E37/01334 Annual Report for the period ending 13/11/2023 |
| A133388 | 2023 | Kin Mining N.L. | Raeside North | <1% | Final Surrender Report for E37/1300, Raeside North for the period 14 August 2017 to 13 August 2022 |
| A134676 | 2023 | Darlex Pty. Ltd. | Leonora | <1% | Leonora Final Surrender |
| A130875 | 2022 | Yilgarn Exploration Ventures Pty Ltd | Christmas Well | 50% | Christmas Well Annual Technical Report C44/2021 for the period ending 10/03/2022. |
| A132863 | 2022 | Western Explorers Pty. Ltd. | Leonora | 100% | Leonora Project E37/01334 Annual Report for the period ending 13/11/2022 |
| A127055 | 2021 | Yilgarn Exploration Ventures Pty Ltd | Desdemona North | 58% | Desdenona EIS (R21) |
| A127570 | 2021 | Yilgarn Exploration Ventures Pty Ltd | Christmas Well | 50% | Christmas Well Annual Technical Report C44/2021 for the period ending 10/03/2021 |
| A127644 | 2021 | Blaze International Ltd | Leonora | <1% | Combined Annual Report Leonora C104/2020 for the period ending 01/04/2021 |
| A122653 | 2020 | Kin Mining Nl | Raeside | 100% | Final Surrender Report for Raeside Tenement E37/868 for the period 22 November 2007 to 15 October 2019 |
| A122663 | 2020 | Kin Mining N.L. | Raeside | 100% | Final Surrender Report for Raeside Tenement E37/1103 for the period 19 October 2011 to 15 October 2019 |
| A123821 | 2020 | Bruce Robert Legendre | Melita | 3.5% | Annual Report for Exploration Licence 40/379, Melita Project, WA for the Period 3 April 2019 to 2 April 2020 |
| A122633 | 2020 | Kin Mining Nl | Raeside | 95% | Raeside Combined C39/2005 Annual Technical Report for the period 1 October 2018 to 30 September 2019, M 37/01 |
| A124318 | 2020 | Blaze International Limited | Malcolm Dam | <1% | Annual Report E37/1164 Malcolm Dam Project for the period ending 1/5/2020 |
| A124342 | 2020 | Blaze International Limited | Malcolm Dam | <1% | Annual Report E37/1165 Malcolm Dam Project for the period ending 28/05/2020 |
| A124970 | 2020 | Saturn Metals Limited | Artemis | <1% | Annual Report for E40/00372 Artemis Project for the period ending 02/07/2020 |
| A125347 | 2020 | Magnetic Resources Nl | Raeside | <1% | Annual Report, C198/2017 Raeside (P37/8905–8912, E37/1331, E37/1367, P37/9204–9207), Western Australia, Report |
| A125613 | 2020 | Kin Mining N.L. | Raeside | <1% | Annual Technical Report for Raeside E37/1300 for the Period 14 August 2019 to 13 August 2020 |
| A125691 | 2020 | St Barbara Limited | Gwalia | 1% | Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2019 to 30 September |
| A125089 | 2020 | Kin Mining N.L.; Genesis Minerals Limited | Desdemona | 34% | Desdemona Combined Reporting Project (C60/2016) Annual Technical Report for the period ending 1 June 2019 to 3 |
| A125605 | 2020 | Saracen Metals Pty Limited | Kailis | 100% | Kailis Project (C87/2016) Annual Report for the Period 1 October 2019 to 30 September 2020, M37/00046, M37/002 |
| A122164 | 2019 | Saturn Metals Limited | Apollo Hill | <1% | Apollo Hill E40/0373 Annual Report for the period 16 November 2018 to 15 November 2019 |
| A122203 | 2019 | Saracen Metals Pty Limited | Kailis | 100% | Kailis Project (C87/2016) Annual Report for the Period 1 October 2018 to 30 September 2019 |
| A119475 | 2019 | Anova Metals Australia Pty Ltd | Malcolm | <1% | Combined Annual Report – Malcolm Project C134/2017 For the Period 8 December 2017 to 7 December 2018, M37/0116 |
| A121286 | 2019 | Kin Mining Nl | Desdemona | 34% | Desdemona Combined Reporting Project (C60/2016) Annual Technical Report for the period 1 June 2018 to 31 May 2 |
| A122153 | 2019 | St Barbara Limited | Gwalia | <1% | Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2018 to 30 September |
| A118674 | 2019 | Kin Mining Nl | Raeside | 95% | Raeside Combined Annual Technical Report C39/2005 for the period 1 October 2017 to 30 September 2018, E37/0086 |
| A119300 | 2019 | Anova Metals Limited | Malcolm | <1% | Surrender Report E37/01294 Malcolm Project for the period 14 August 2017 to 9th November 2018 |
| A120757 | 2019 | Coxsrocks Pty Ltd | Malcolm Creek | <1% | Annual Report E37/1164 Malcolm Creek for the period 29 May 2018 to 28 May 2019 |
| A120796 | 2019 | Coxsrocks Pty Ltd; Blaze International Limited | Malcolm Creek | <1% | Annual Exploration Report E37/1164 Malcolm Creek Project for the period 29/05/2018 to 28/05/2019 |
| A120905 | 2019 | Coxsrocks Pty Ltd | Malcolm Soak | <1% | Annual Report Malcolm Soak E37/1165 for the period 2 May 2018 to 1 May 2019 |
| A120915 | 2019 | Saturn Metals Limited | Artemis | <1% | 1st Annual Report for E40/00372 Artemis Project for the period 3 July 2018 to 2 July 2019 |
| A121496 | 2019 | Magnetic Resources Nl | Raeside | <1% | Annual Report, C198/2017 Raeside (P37/8905–8912, E37/1331, E37/1367, P37/9204–9207), Western Australia for the |
| A121783 | 2019 | Kin Mining Nl | Raeside | <1% | Annual Technical Report for Raeside project E37/1300 for the Period 14 August 2018 to 13 August 2019 |
| A122207 | 2019 | Darlex Pty Ltd | Leonora | <1% | Leonora combined MER 2019, C25/2017, 28 October 2018 to 27 October 2019 |
| A115942 | 2018 | Anova Metals Australia Pty Ltd | Malcolm | <1% | Combined Annual Report - Malcolm Project - C134/2017 for the period 8 December 2016 to 7 December 2017, M37/01 |
| A117854 | 2018 | Kin Mining N.L. | Desdemona | 9% | Annual Technical Report for the Desdemona Project C60/2016 for the period 1st June 2017 to 31st May 2018 |
| A118187 | 2018 | Darlex Pty Ltd | Leonora | <1% | Leonora Project C25/2017 Annual Report for the period 28 November 2017 to 27 November 2018, P37/08465, P37/083 |
| A116472 | 2018 | Azark Project Pty Ltd | Azark | 27% | Annual Report for the period 23 September 2016 to 22 September 2017, Azark Project, E37/1255 |
| A118145 | 2018 | Magnetic Resources Nl | Raeside | <1% | Annual Report C198/2017 Raeside (P37/8905–8912), Western Australia, Reporting Period 21 August 2017 to 20 Augu |
| A118561 | 2018 | Kin Mining Nl | Raeside | <1% | Annual Technical Report for E37/1300 Raeside Project for the Period 14 August 2017 to 13 August 2018 |
| A118601 | 2018 | St Barbara Limited | Gwalia | <1% | Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2017 to 30 September |
| A118609 | 2018 | Saracen Metals Pty Limited | Kailis | 100% | Kailis Project (C87/2016) Annual Report for the Period 1 October 2017 to 30 September 2018, M37/00046, M37/002 |
| A110709 | 2017 | Saracen Metals Pty Limited | Kailis | 100% | Kailis Project (C87/2016) Annual Report for the Period 1 October 2015 to 30 September 2016 |
| A115382 | 2017 | Kin Mining N.L. | Raeside | 95% | Raeside Project C39/2005 Annual Technical Report for the period 1 October 2016 to 30 September 2017, E37/00868 |
| A112055 | 2017 | Alouisus Pty Ltd | Leonora | <1% | PROSPECTING LICENCE 37/8176 Annual Technical Report For the period ending 3 September 2016 |
| A112056 | 2017 | Alouisus Pty Ltd | Leonora | <1% | PROSPECTING LICENCE 37/8177 Annual Technical Report For the period ending 30 August 2016 |
| A114865 | 2017 | Kin Mining N.L. | Desdemona | 9% | Mineral Exploration Report - DESDEMONA PROJECT C60/2016 For the Period 1 June 2016 to 31 May 2017, E37/01152, |
| A115230 | 2017 | Darlex Pty Ltd | Leonora | <1% | Leonora Project C25/2017 Combined Annual Report for the period 28 October 2016 to 28 October 2017, P37/08465, |
| A115512 | 2017 | St Barbara Limited | Gwalia | 1% | Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2016 to 30 September |
| A115514 | 2017 | Saracen Metals Pty Limited | Kailis | 100% | Kailis Project (C87/2016) Annual Report for the Period 1 October 2016 to 30 September 2017, M37/00046, M37/002 |
| A108581 | 2016 | Kin Mining Nl | Outcamp Well | 5.1% | Annual Technical Report for the period 12th December 2014 to 11th December 2015 Desdemona Project – Outcamp We |
| A110096 | 2016 | St Barbara Limited | Greater Gwalia | 100% | Final Surrender Report P37/7126 Greater Gwalia For the Period 23 September 2008 to 14 September 2016 |
| A109655 | 2016 | Cazador Resources Pty Ltd | Calypso | <1% | Annual Report E37/1120 Calyspo Project for the period 17 May 2015 to 16 May 2016 |
| A109689 | 2016 | Kin Mining N.L. | Desdemona | 9% | Desdemona Project C60/2016 Annual Report for the period 1 June 2015 to 31 May 2016, E37/01152, E37/01156, E37/ |
| A110357 | 2016 | Darlex Pty. Ltd. | Leonora | <1% | Leonora Project P37/08387 Annual MIneral Exploration Report for the period 28 November 2015 to 28 November 201 |
| A110408 | 2016 | Kin Mining N.L. | Raeside | 95% | Raeside Project C39/2005, E37/00868, E37/01103, M37/01298 annual Mineral Exploration Report for the period 1 O |
| A110551 | 2016 | St Barbara Limited | Gwalia | <1% | Gwalia Project Combined Reporting Group C55/2004 - Annual Report for the Period 1 October 2015 to 30 September |
| A107532 | 2015 | Kin Mining Nl | Raeside | 95% | Annual Technical Report for the period 1st October 2014 to 30th September 2015 Raeside Project - Leonora WA (C |
| A106535 | 2015 | Intermet Resources Ltd | Calypso | <1% | Annual Report E37/1120 (Calypso Project) for the period 17th May 2014 to 16th May 2015 |
| A107603 | 2015 | St Barbara Limited | Gwalia | 7.3% | Gwalia Project C55/2004 Combined Annual Report for the Period 1 October 2014 to 30 September 2015 |
| A101369 | 2014 | Alphabrass Resources | Raeside | 41% | Raeside Project Relinquishment Report for E37/1122 for the period 12/6/2012 to 14/11/2013 |
| A102021 | 2014 | Alphabrass Resources | Melita | 58% | Melita Project Relinquishment Report for E37/1123 for the period 12/6/2012 to 7/2/2014 |
| A102327 | 2014 | Lakeway Resources Pty Ltd | Lake Raeside | 81% | Annual Mineral Exploration Report Lake Raeside E 37/1059 For the Period 7 February 2013 to 6 February 2014 |
| A103071 | 2014 | St Barbara Ltd | Gwalia | 38% | Gwalia Project, Final Surrender Report for the period 12/07/2010 to 18/06/2014, E37/896. [C55/2004] |
| A103072 | 2014 | St Barbara Ltd | Gwalia | 100% | Gwalia Project, Final Surrender Report for the period 23/09/2008 to 18/06/2014, P37/7127. [C55/2004] |
| A103073 | 2014 | St Barbara Ltd | Gwalia | 100% | Gwalia Project, Final Surrender Report for the period 23/09/2008 to 18/06/2014, P37/7128. [C55/2004] |
| A104018 | 2014 | Kin Mining Nl | Raeside | 95% | ANNUAL TECHNICAL REPORT for the period 1st October 2013 to 30th September 2014 RAESIDE PROJECT – LEONORA - Wes |
| A104019 | 2014 | Kin Mining Nl | Raeside | 85% | Raeside Project C39/2005 Surrender Report for the period ended 24/09/2014, M37/256, M37/369, M37/377 and M37/3 |
| A104225 | 2014 | St Barbara Ltd | Gwalia | 22% | Annual Mineral Exploration Report - DMP Combined Reporting Group C55/2004 (Gwalia) Reporting Period 1 October |
| A105279 | 2014 | Darlex Pty Ltd | Leonora | <1% | Leonora Project P37/8387 Annual Report for the period 28/11/2013 to 28/11/2014 |
| A103035 | 2014 | Intermet Resources Ltd | Calypso | <1% | Annual Report E37/1120 (CALYPSO PROJECT) For the period 17th May 2013 to 16th May 2014 |
| A103070 | 2014 | St Barbara Ltd | Gwalia | 5.2% | Gwalia Project, Final Surrender Report for the period 25/01/2010 to 18/06/2014, M37/603. [C55/2004] |
| A103074 | 2014 | St Barbara Ltd | Gwalia | 50% | Gwalia Project, Final Surrender Report for the period 23/09/2008 to 18/06/2014, P37/7129. [C55/2004] |
| A104118 | 2014 | Kin Mining Nl | Raeside | 51% | Final Surrender Report for the period ending 24th September 2014 Raeside Project - Leonora WA Combined Report |
| A97814 | 2013 | Black Mountain Resources Limited | Six Mile Well | 81% | Six Mile Well Project, Annual Report for the period 31/01/2012 to 30/01/2013, E37/834 & 950. [C34/2010] |
| A97887 | 2013 | Lakeway Resources Pty Ltd | Lake Raeside | 81% | Lake Raeside Project, Annual Report for the period 7th February 2012 to 6th February 2013, E37/1059. |
| A98083 | 2013 | Black Mountain Resources Limited | Six Mile Well | 92% | Six Mile Well Project, Final Surrender Report for the period 31st January 2009 to 30th January 2013, E37/950. |
| A98401 | 2013 | Hawthorn Resources Limited | Melita | 17% | Melita Project C4/200 Annual Report for the period 1 April 2012 to 31 March 2013, Exploration Licences: E40/21 |
| A98933 | 2013 | Intermet Resources Ltd | Calypso | <1% | Annual Report E37/1120 (Calypso Project) For the period 17th May 2012 to 16th May 2013 |
| A99279 | 2013 | Alphabrass Resources | Raeside | 56% | Raeside Project Combined Annual Technical Report C96/2013 For the period 12/62012 to 11/6/2013 |
| A99810 | 2013 | Lakeway Resources Pty Ltd | Lake Raeside | 31% | Annual Mineral Exploration Report Lake Raeside E37/1093 For the Period 12 June 2012 to 11 June 2013 |
| A100040 | 2013 | Navigator Mining Pty Ltd | Raeside | 79% | Raeside Project Annual Technical Report for the Period 1st October 2012 to 30th September 2013, E37/866, E37/8 |
| A100342 | 2013 | St Barbara Ltd | Gwalia | 22% | Annual Mineral Exploration Report - DMP Combined Reporting Group: C55/2004 Gwalia Project Reporting Period: 1 |
| A100901 | 2013 | Black Mountain Resources Limited | Company Well | 68% | Company Well Project, Final Surrender Report for the period 10/10/2006 to 03/10/2013, E37/834. [C34/2010] |
| A93099 | 2012 | Gme Resources Ltd | Leonora East | <1% | Leonora East Project Combined Reporting Group C243/2007 Final Surrender Report 2011, 871, 6931, 6932, 7185, P3 |
| A93480 | 2012 | Dalla Costa R | Lake Raeside | <1% | Annual Mineral Exploration Report Lake Raeside, E37/1060 For the Period 21 January 2011 to 20 January 2012 |
| A93722 | 2012 | Lakeway Resources Pty Ltd | Lake Raeside | 81% | Annual Mineral Exploration Report Lake Raeside E 37/1059 For the Period 7 February 2011 to 6 February 2012 |
| A93822 | 2012 | St Barbara Ltd | Leonora | 2.5% | Leonora C162/2006 Annual Report for the Period 1 April 2011 to 31 March 2012 |
| A93842 | 2012 | Black Mountain Resources Limited | Six Mile Well | 81% | Combined Annual Mineral Exploration report for the period 31 January 2011 – 30 January 2012 Six Mile Well Proj |
| A94180 | 2012 | Hawthorn Resources Limited | Melita | 17% | C4/2000 Melita Project annual report for the period 1 April 2011 to 31 March 2012, Exploration Licences: E40/1 |
| A95548 | 2012 | Cascade Resources Ltd | Malcolm | 33% | Malcolm Project E37/837 Annual Report for the period 12th September 2011 to 11th September 2012 |
| A92567 | 2012 | Gme Resources Ltd | Leonora East | <1% | E37/871 Final Surrender Report Leonora East Project, Reporting Period: 3rd September 2008 to 8th September 201 |
| A95837 | 2012 | Navigator Resources Ltd | Raeside | 79% | Raeside Project Annual Technical Report for the Period 1st October 2011 to 30th September 2012, C39/2005, E37/ |
| A96105 | 2012 | St Barbara Ltd | Gwalia | 14% | Gwalia Project, Annual Report for the period 1st October 2011 to 30th September 2012, E37/896, 918-919; M37/17 |
| A89039 | 2011 | St Barbara Ltd | Gwalia | 12% | Gwalia Project C55/2004 Annual Report for the Period 1 October 2009 to 30 September 2010 |
| A89161 | 2011 | Hawthorn Resources Limited | Melita | 4.1% | Exploration Licence E37/543 Melita Partial Surrender Report for the period 8 Nov 2006 to 7 Nov 2010 |
| A89198 | 2011 | Hawthorn Resources Limited | Melita | 19% | Exploration Licence E40/215 MELITA PARTIAL SURRENDER REPORT FOR THE PERIOD 24 OCTOBER 2006 TO 23 OCTOBER 2010 |
| A89265 | 2011 | Gme Resources Ltd | Leonora East | <1% | Leonora East Project C243/2007 Annual Report 2010 1st January 2010 to 31st December 2010, E37/871, P37/6931, P |
| A90261 | 2011 | Liberty Resources Limited | Six Mile Well | 81% | Annual Technical Report for Six Mile Well, 31st January 2010 to 30th January 2011, E37/834 & E37/950. (C34/201 |
| A90841 | 2011 | Hawthorn Resources Limited | Melita | 7.7% | C 4/2000 MELITA ANNUAL REPORT FOR THE PERIOD 1 APRIL 2010 TO 31 MARCH 2011 |
| A91212 | 2011 | Rubicon Resources Ltd | Malcolm Dam West | <1% | Malcolm Dam West Project, Final Report C218/2006 P37/7540-7557, Report Period: 27th March 2009 – 26th August 2 |
| A91258 | 2011 | Hawthorn Resources Limited | Melita | 36% | Exploration Licence E37/528 Melita Final Surrender Report for the period 8 November 2006 to 21 April 2011 |
| A91337 | 2011 | Hawthorn Resources Limited | Melita | 4.1% | Exploration Licence E37/543 Melita Final Surrender Report for the period 8 November 2006 to 22 August 2011 |
| A91988 | 2011 | Navigator Resources Ltd | Raeside | 60% | Raeside Project C39/2005 Annual Technical Report for the Period 1st October 2010 to 30th September 2011 |
| A92161 | 2011 | West Australian Gold Investments Pty Ltd | Leonora | 100% | Leonora Project, Annual Report on E37/953 for the Period Ended 16th October 2011 |
| A92197 | 2011 | St Barbara Mines Ltd | Gwalia | 14% | Gwalia Project Annual Report for the Period 1 October 2010 to 30 September 2011 (C55/2004) |
| A90352 | 2011 | St Barbara Ltd | Leonora | 2.1% | Leonora Project, Annual Report for the period 1st April 2010 to 31st March 2011, Tenements as per Combined Rep |
| A89631 | 2011 | West Australian Gold Investments Pty Ltd | Leonora | 100% | Leonora Project, Annual Report for the period 18th October 2009 to 17th October 2010, E37/953. |
| A90119 | 2011 | Hawthorn Resources Limited | Melita | 82% | Melita Project, Final Surrender Report for the period 12th September 2008 to 20th January 2011, E37/891. |
| A90963 | 2011 | St Barbara Ltd | Malcolm Dam West | <1% | Malcolm Dam West C218/2006 Annual Report for the Period 5 May 2010 to 4 May 2011 |
| A91804 | 2011 | Cascade Resources Ltd | Malcolm | 33% | Malcolm Project, E37/837, Annual Report 2011for the period 12th September 2010 to 11th September 2011. |
| A85760 | 2010 | Gme Resources Ltd | Leonora East | <1% | LEONORA EAST PROJECT COMBINED REPORTING GROUP C243/2007 2009 ANNUAL REPORT 1st January 2009 to 31st December 2 |
| A85801 | 2010 | Liberty Resources Limited | Company Well | 68% | Partial Surrender Company Well E37/834 August 2009 |
| A87123 | 2010 | St Barbara Ltd | Leonora | 2.1% | Annual Report for the Period 1 April 2009 to 31 March 2010, Leonora, C162/2006, E37/235, E37/496, E37/573, E37 |
| A87350 | 2010 | St Barbara Ltd | Malcolm | <1% | Malcolm Project C218/2006 Annual Report for the Period 2 May 2009 to 1 May 2010 |
| A88463 | 2010 | Navigator Resources Ltd | Raeside | 60% | Raeside Project Annual Technical Report for the Period 1st October 2009 to 30th September 2010 |
| A88851 | 2010 | Liberty Resources Limited | Company Well | 68% | Partial relinquishment Report for Company Well E37/834, E37/950 |
| A85825 | 2010 | Liberty Resources Limited | Company Well - Six Mile Well | 81% | Company Well - Six Mile Well Project, Annual Report , February 2010, E37/834 & 950. [C34/2010] |
| A86680 | 2010 | Rubicon Resources Ltd | Melita | 61% | Melita Final Report E37/790, Report Period 04 January 2006 – 19th January 2010 |
| A86681 | 2010 | Hawthorn Resources Limited | Melita | 19% | Exploration Licence E40/215, Melita Partial Surrender Report for the period 24 October 2006 to 1 February 2010 |
| A87158 | 2010 | Hawthorn Resources Limited | Melita | 8.2% | Melita Annual Report for the period 1 April 2009 to 31 March 2010, C4/2000, Exploration Licences: E37/528, 543 |
| A85012 | 2009 | Rubicon Resources Ltd | Melita | 14% | Annual Combined Report, Melita Project, C138/2007, 1 September 2007 to 31 August 2008 |
| A85041 | 2009 | Navigator Resources Ltd | Raeside | 60% | Raeside Project Annual Technical Report for the period 1 October 2008 to 30 September 2009 |
| A85286 | 2009 | St Barbara Ltd | Gwalia | 12% | Gwalia Project C55/2004, Annual Report for the Period 1 October 2008 to 30 September 2009, E37/789, E37/918-91 |
| A80175 | 2008 | Regis Resources Ltd | Melita | 36% | Annual Report on Exploration for the period 8/11/2007 to 7/11/2008: Melita E37/528 |
| A78391 | 2008 | Regis Resources Ltd | Melita | 11% | COMBINED ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 01/04/2007 to 31/03/2008 MELITA. Reference: C4-2000 A08.p |
| A78842 | 2008 | St Barbara Ltd | Leonora | 2.9% | LEONORA PROJECT ANNUAL REPORT FOR THE PERIOD 1 APRIL 2007 - 31 MARCH 2008 GROUP: C162/2006 E37/235, E37/236, E |
| A80171 | 2008 | Regis Resources Ltd | MELITA | 19% | ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 24/10/2007 TO 23/10/2008 MELITA E40/215 |
| A80176 | 2008 | Regis Resources Ltd | Melita | 4.1% | Annual Report on Exploration for the period 8/11/2007 to 7/11/2008: Melita E37/543 |
| A80261 | 2008 | Rubicon Resources Ltd | MELITA | 12% | MELITA PROJECT COMBINED REPORT, C138/2007, E37/790, E40/202, E40/204, E40/206, E40/209, E40/211, ANNUAL REPORT |
| A80280 | 2008 | Liberty Resources Nl | COMPANY WELL | 68% | Annual Mineral Exploration Report COMPANY WELL E 37/834 For the Period 10 October 2007 to 9 October 2008 |
| A80597 | 2008 | Gme Resources Ltd | LEONORA EAST | <1% | LEONORA EAST PROJECT COMBINED REPORTING GROUP C243/2007 2008 ANNUAL REPORT |
| A82972 | 2008 | Liberty Resources Nl | COMPANY WELL | 68% | Partial Surrender COMPANY WELL E37/834 |
| A76878 | 2008 | St Barbara Ltd | Gwalia | 6.1% | Gwalia project, Annual report for the period 1 October 2006 - 30 September 2007 (C55/2004) |
| A77098 | 2008 | Liberty Resources Nl | Company Well | 68% | Annual Mineral Exploration Report Company Well E37/834 For the period 10 October 2006 to 9 October 2007 |
| A77671 | 2008 | Gme Resources Ltd | Leonora East | <1% | Leonora East Project P37/6931 Annual Technical & Progress Report for the 12 month period ended 18 January 2008 |
| A77697 | 2008 | Regis Resources Ltd | Melita | 13% | ANNUAL REPORT ON EXPLORATION FOR THE PERIOD 15/02/2007 TO 14/02/2008 MELITA E40/184 |
| A79215 | 2008 | Archimedes Mining | Raeside | 100% | Annual report for the period 09 January 2007 – 08 January 2008, Brunhilde Project, E37/839 |
| A76645 | 2007 | Regis Resources Nl | Melita | 19% | Annual Report on Exploration for the period 24/10/2006 to 23 /10/2007: Melita E40/215 |
| A76867 | 2007 | Regis Resources Nl | Melita | 36% | Annual Report on Exploration for the period 8/11/2006 to 7/1 1/2007: Melita E37/528 |
| A76868 | 2007 | Regis Resources Nl | Melita | 4.1% | Annual Report on Exploration for the period 8/11/2006 to 7/1 1/2007: Melita E37/543 Report No 2007/026 |
| A73969 | 2007 | St Barbara Ltd | Gwalia | 6.3% | Gwalia Project, Annual Report for the Period 1 October 2005 to 30 september 2006, Combined Reporting No. C55/2 |
| A74394 | 2007 | Diamond Rose Nl | Leonora West | 40% | Leonora West Project , Annual Report for the period 15th December 2005 to 14th December 2006, E37/728 & 729. |
| A74758 | 2007 | Regis Resources Nl | Melita | 13% | Melita Project, Annual Report for the period 15/2/2006 to 14/2/2007, E40/184. |
| A76341 | 2007 | Rubicon Resources Ltd | Melita | 12% | Melita Project Combined Report C138/2007 E37/790, E40/202, E40/204, E40/206, E40/209, E40/211 Annual Report 1s |
| A76614 | 2007 | Navigator Resources Ltd | Raeside | 79% | RAESIDE PROJECT Annual Technical Report for the Period 1st October 2006 to 30th September 2007, C39/2005, M37 |
| A73757 | 2006 | Navigator Resources Ltd | Raeside | 79% | Raeside Project M37/256,369,377,379,P37/4046, Annual Technical Report for the Period 1 October 2005 to 30 Sept |
| A71746 | 2006 | St Barbara Mines Ltd | Harbour Lights / Gwalia | 7.2% | Gwalia Project, Annual Report for the period 1 October 2004 - 30 September 2005, Combined Reporting No. C055/2 |
| A69841 | 2005 | Sons Of Gwalia Ltd | Gwalia | 14% | Annual report for the period 01/07/03 - 30/09/04 Gwalia Project, C55/2004, E37/269, M37/17, M37/25, M37/46, M3 |
| A71428 | 2005 | Navigator Resources Ltd | Raeside | 79% | Raeside project, Annual technical report for the period 1 October 2004 to 30 September 2005, Group Reporting N |
| A68053 | 2004 | Johnsons Well Mining Nl | Melita | 12% | Exploration Licences: E37/572, Annual Report for the period 12/06/2002- 11/06/2003 (Melita Project) |
| A68055 | 2004 | Johnsons Well Mining Nl | Melita | 45% | Exploraiton Licences: E37/689, Annual Report for the period 19 February 2003 to 18 February 2004 (Melita Proje |
| A68056 | 2004 | Johnsons Well Mining Nl | Melita | 83% | Annual Report for the period 19/06/2002- 18/06/2003 Melita Project E37/700 |
| A68067 | 2004 | Johnsons Well Mining Nl | Melita | 15% | Exploration Licences E37/350, E37/597, E40/72, E40/157, E40/169 Melita, Joint surrender report for the period |
| A68312 | 2004 | Mr Van Blitterswyk Wc | Fenryr's Return | <1% | Annual Report for Exploration Licence E37/712 Year ending 2003 The Fenryr's Return Anomaly |
| A69617 | 2004 | Regis Resources Nl | Melita | 12% | Surrender report for the period 12/06/00 - 07/05/04 (Melita Project), E37/572, Mount Malcolm (Menzies) |
| A69618 | 2004 | Regis Resources Nl | Melita | 4.4% | Prospecting Licences: P37/5894, P37/5895, Surrender report for the period 17/11/99 - 20/04/04 (Melita Project) |
| A68054 | 2004 | Johnsons Well Mining Nl | Melita | 90% | Exploration Licences: E37/685; Annual Report for the period 25 November 2002 to 24 November 2003 (Melita Proje |
| A68052 | 2004 | Johnsons Well Mining Nl | Melita | 25% | Exploration Licences: E37/350, E40/147, E40/150, E40/157; Prospecting Licences: P37/5894-5895, P40//1066, P40 |
| A68103 | 2004 | Sons Of Gwalia Ltd | Gwalia | 60% | Gwalia Project Surrender Report for C162/1997 Tenement surre ndered on 5 December 2003 |
| A68631 | 2004 | Sons Of Gwalia Ltd | Melita | 2.6% | Melita Project, Annual report for the period 27 March 2003-30 June 2003 (C21/1996), E37/269 |
| A68988 | 2004 | Mr Van Blitterswyk Wc | Leonora | <1% | Annual Report for E37/722 for year ending 2004. ( Possible mineralized zone extensions into E37E37/722, period |
| A65992 | 2003 | Sons Of Gwalia Ltd | Raeside | 41% | Annual Report for the period 1 July 2001 - 30 June 2002 Raeside JV Project C49/1994: M37/256, 369, 377, 379, P |
| A66365 | 2003 | Sons Of Gwalia Ltd | Station Creek | 6.2% | Station Creek Project, Annual Report for the period 17 June 2001 to 16 June 2002, M37/163-64, 212, P37/4252, 4 |
| A66393 | 2003 | Sons Of Gwalia Ltd | North Gwalia | <1% | Annual Report for the period 1 Jan 2002 - 31 Dec 2002 North Gwalia Project C353/1992: M37/158, M37/159 Report |
| A66773 | 2003 | Sons Of Gwalia Ltd | Station Creek | 87% | Station Creek Project, Surrender Report for C70/1996, Tenements surrendered between 27 March 2001 to 2 April20 |
| A66817 | 2003 | Sons Of Gwalia Ltd | Hoover Trend Group | 57% | Hoover Trend Group, Surrender Report for C162/1997 Tenements surrendered between 26 March 2002 & 12 November 2 |
| A66912 | 2003 | Sons Of Gwalia Ltd | Station Creek | 42% | Station Creek Project, Annual Report for the period 14 June 2002 to 13 June 2003, M37/163-164 & 212; P37/4252, |
| A67207 | 2003 | Sons Of Gwalia Ltd | Gwalia | 3.6% | Annual Report for the period 1 July 2002 to 30 June 2003 Gwalia Project C162/1997:GML37/2535,M37/17,25,55,137, |
| A67389 | 2003 | Sons Of Gwalia Ltd | Central Well | 81% | Central Well Project, Annual Report for the period 15 July 2002 to 14 July 2003, P37/ /4327-4329 P37/4366-4373 |
| A65825 | 2003 | Sons Of Gwalia Ltd | Mary Bore | 2.7% | Mary Bore Project Annual Report For The Period 13 May 2001 - 12 May 2002. Group: C156/2001. Tenements: M37/371 |
| A66262 | 2003 | Sons Of Gwalia Ltd | Punkah Wallah | <1% | Annual Report for the period 1 January 2002 - 31 December 2002 Punkah Wallah C7/1993: M37/172, M37/204 and M37 |
| A66734 | 2003 | Sons Of Gwalia Ltd | Melita | 9.9% | Melita Project, Annual Report for the period 27 March 2002 to 26 March 2003 C21/1996: E37/254,269 . |
| A66800 | 2003 | Sons Of Gwalia Ltd | Central Well | 96% | Central Well Project, Partial Surrender Report for E37/518 for the period 29 July 1999 to 23 October 2002, [C9 |
| A66812 | 2003 | Sons Of Gwalia Ltd | Kailis | 100% | Kailis Project, Surrender Report for C354/1992 Tenement Surrendered on 9 January 2003 C354/1992: P37/5016, SOG |
| A66816 | 2003 | Sons Of Gwalia Ltd | Melita | 13% | Melita Project, Surrender Report for C21/1996 Tenement surrendered on 15 November 2002, E37/254. |
| A67055 | 2003 | Sons Of Gwalia Ltd | Central Well | 56% | Central Well Project, Surrender Report for the period 19th August 1992 to 17th June 2003 [C91/2002] P37/4366- |
| A67188 | 2003 | Triton Resources Ltd | Forgotten Four Shear | 67% | Annual Report for Exploration Licence 37/675 Year End 2002 Potential of the Forgotton Four Shear after Raeside |
| A67232 | 2003 | Sons Of Gwalia Ltd | Raeside | 42% | Annual Report for the period 1 July 2002-30 June 2003 Raeside JV Project C49/1994: M37/256,369,377,379,3650-36 |
| A67300 | 2003 | Sons Of Gwalia Ltd | Kailis | 100% | Annual Report for the period 1 July 2002 to 30 June 2003 Kailis Project C354/1992: M37/46,219,564 P37/3805,501 |
| A67441 | 2003 | Sons Of Gwalia Ltd | Central Well | 96% | Central Well Project, Surrender Report for the period 29th July 1999 to 19th August 2003 2002,E37/518 [C91/200 |
| A67693 | 2003 | Sons Of Gwalia Ltd | North Gwalia | <1% | North Gwalia Project, Annual Report for the period 1 January 2003-31 December 2003 ,C162/1997, M37/158, M37/15 |
| A67694 | 2003 | Sons Of Gwalia Ltd | Punkah Wallah | <1% | Annual Report for the period 1 January 2001-31 December 2002 Punkah Wallah Project C7/1993, M37/172, M37/204, |
| A64934 | 2002 | Sons Of Gwalia Ltd | Station Creek | 96% | Station Creek Project, Final Surrender Report For The Period 8 August 1996 - 13 June 2002 Tenement: E37/451. |
| A64071 | 2002 | Sons Of Gwalia Ltd | Punkah Wallah | <1% | Annual Report for the period 1 January 2001 - 31 December 2001 Punkah Wallah tenements M37/172, M37/204, M37/5 |
| A64444 | 2002 | Jubilee Mines Nl | Malcolm Project | 7.7% | Malcolm Project Combined Annual Report For E37/225, E37/302, M37/423, 430, 431, 433, 475-477, P37/4101-4102, 4 |
| A64643 | 2002 | Sons Of Gwalia Ltd | Kailis | <1% | Kailis Project , Final Surrender Report for the period 21st December 1995 to 18th January 2002 P37/5270. |
| A64796 | 2002 | Sons Of Gwalia Ltd | Raeside | 5% | Raeside JV Surrender Report For The Period 15 May 1990 - 27 May 2002. Tenement: P37/3655. |
| A64919 | 2002 | Sons Of Gwalia Ltd | North Gwalia | <1% | North Gwalia Project, Annual Report for the period 1st Jan 2001 to 31st Dec 2001, M37/158, M37/159, M37/270, |
| A64959 | 2002 | Sons Of Gwalia Ltd | Central Well | 81% | Cental Well Project ,Annual Report for the period 15th July 2001 to 14th July 2002, E37/518; P37/4327-4329, P3 |
| A65378 | 2002 | Sons Of Gwalia Ltd | Kailis | 100% | Annual Report For The Period 1 July 2001 - 30 June 2002 Tenements: M37/46, M37/219, M37/564, P37/3805, P37/501 |
| A65551 | 2002 | Sons Of Gwalia Ltd | Gwalia | 1% | Gwalia Annual Report For The Period 1 July 2001 - 30 June 2002 Tenements: GML37/2535, M37/17, M37/25, M37/55, |
| A61737 | 2001 | Jubilee Gold Mines Nl | Malcolm Project | 7.7% | Malcolm Project Combined Annual Report for E37/225, E37/302, M37/423, 430, 431, 433, 475-477, P37/4101-4102, 4 |
| A62485 | 2001 | Croesus Mining Nl | Cobbie Well | 89% | Cobbie Well surrender report for the period 19 March 2000 to 19 March 2001 on E37/578 |
| A62936 | 2001 | Sons Of Gwalia Ltd | Gwalia | 8.5% | Gwalia Annual Report For The Period 1 July 1999 - 30 June 2001 Tenements: GML37/2535, M37/17, M37/25, M37/55, |
| A63079 | 2001 | Gutnick Resources Nl | Melita | 25% | Exploration Licences E37/350.147.150.157. Prospecting Licences P37/5894,5895, P40/1066,1091, C4/2000 - Melita |
| A63260 | 2001 | Sons Of Gwalia Ltd | Station Creek | 74% | Station Creek Project ,Annual Report For The Period 17 June 2000 - 16 June 2001, E37/451, M37/163-164, M37/212 |
| A63298 | 2001 | Sons Of Gwalia Ltd | Kailis | 100% | Kailis Project Annual Exploration Report For The Period 1 July 2000 - 30 June 2001. Tenements: M37/46, M37/219 |
| A63639 | 2001 | Sons Of Gwalia Ltd | Kailis | 100% | Kailis Project Resource Development Drilling, Annual Report for the period 1 July 1999 - 30 June 2001. Teneme |
| A63711 | 2001 | Sons Of Gwalia Ltd | Kailis | 100% | Kailis Project, Final Surrender Report for the period 29 November 1995 - 31 March 2000, P37/5265. |
| A59575 | 2000 | Sons Of Gwalia Ltd | Station Creek East | 74% | Station Creek East Project, Annual Report for the period 17/06/1998 - 16/06/1999 E37/451; M37/163-164 & 212; |
| A59585 | 2000 | Sons Of Gwalia Ltd | Hoover Trend | 8.5% | Hoover Trend, Annual Report for the Period 01/07/1997 to 30/06/1999. GML37/2535, M37/17, 25, 55 |
| A59619 | 2000 | Sons Of Gwalia Ltd | Kailis | 100% | Kailis Project 01/07/1998 - 30/06/1999 M37/46, 219, P37/3805, 4309, 5016, 5265, 5270 |
| A59923 | 2000 | Sons Of Gwalia Ltd | Central Well | 74% | Central Well Project. Annual Report for the period 15/07/98-14/07/99, E37/452 P37/4327-4329,4366-4373. |
| A60234 | 2000 | Sons Of Gwalia Ltd | Central Well | 95% | Central Well Project, Partial Surrender Report for the period 08/08/1996 to 29/11/1999, E37/452. |
| A60644 | 2000 | Delta Gold Ltd | Clover Downs | 79% | Clover Downs Project Surrender Report 15/05/1997 to 13/01/1999 EL37/474 Report No. WA99.028 Project NO. 3013.0 |
| A61440 | 2000 | Sons Of Gwalia Ltd | Station Creek | 73% | Station Creek Project, Annual Report for the Period 17/06/1999 to 16/06/2000, E37/451, M37/163,164,212, P37/42 |
| A61603 | 2000 | Sons Of Gwalia Ltd | Kailis | 100% | Kailis Project Annual Report for the period 1 July 1999 - 30 June 2000, tenements: M37/46, M37/219, M37/564, P |
| A59616 | 2000 | Sons Of Gwalia Ltd | Melita | 9.9% | Melita Project, Annual report for the period 27/03/1998 - 26/03/1999, E27/254, E27/269 |
| A60165 | 2000 | Sons Of Gwalia Ltd | Punkah Wallah | <1% | Punkah Wallah JV Annual Report for the Period 1 January 1999 to 31 December 1999, M37/172,204, P37/4086. |
| A60246 | 2000 | Sons Of Gwalia Ltd | Mary Bore | 2.7% | Mary Bore Project, M37/371, P37/4257-4259, 4364,4365, P40/973-975, Annual Report for the Period 13 May 1998 to |
| A60967 | 2000 | Sons Of Gwalia Ltd | North Gwalia | <1% | North Gwalia Project Annual Report for the Period 1 January 1999 - 31 December 1999 M37/158, M37/159, M37/270, |
| A61280 | 2000 | Kookynie Resources Nl | Lake Raeside | 82% | Lake Raeside Project, Combined Reporting Group, All Tenements, Annual Report, GSWA Report C211/1998, due 24 Se |
| A61343 | 2000 | Sons Of Gwalia Ltd | Central Well | 83% | Central Well Project Annual Report for the Period 15 July 1999-14 July 2000. E37/452, E37/518, P37/4327-4329, |
| A61447 | 2000 | Sons Of Gwalia Ltd | Station Creek | 96% | Station Creek Project, Partial Surrender Report for the period 08/08/1996 to 07/08/2000, E37/451. |
| A61581 | 2000 | Sons Of Gwalia Ltd | Raeside | 36% | Raeside JV Project Annual Report for the period 1 July 1999 - 30 June 2000. Tenements:M37/256, M37/369, M37/37 |
| A61711 | 2000 | Sons Of Gwalia Ltd | Central Well | 95% | Central Well Project, Partial Surrender Report for the period 08/08/1996 to 07/08/2000, E37/452. |
| A57546 | 1999 | Sons Of Gwalia Ltd | Station Creek | 74% | Station Creek Project, Annual Report for the period 17/06/1997 to 16/06/1998, E37/451; M37/163-164 & 212; P37 |
| A57659 | 1999 | Delta Gold Ltd | Glenorn | 7.6% | Annual Technical Report Glenorh Project 14 December 1997 to 13 December 1998 |
| A57690 | 1999 | Stockdale Prospecting Ltd | Wilbah | 13% | Wilbah Project - Combined Final Report E37/359-360,November 1998. |
| A57830 | 1999 | Sons Of Gwalia Ltd | Central Well | 74% | Central Well Project 15/07/1997 - 14/07/1998 E37/452, P37/4327-4329, 4366-4373 |
| A59056 | 1999 | Sons Of Gwalia Ltd | North Gwalia | <1% | North Gwalia Project, Annual Report for the period 01/01/98-31/12/98 , M37/158 M37/159 M37/270 P37/3997-3999. |
| A59109 | 1999 | Gutnick Resources Nl | Malcolm | 42% | Exploration Licences: E37/289, 350 , E40/72 'C53/1999- Melita' Joint Annual Report for the period 31 March 199 |
| A57852 | 1999 | Heron Resources Ltd | Malcolm, Mount Melita | 23% | Malcolm Project, Mount Melita Prospect Exploration Licence 40/72 and 37/350 North Coolgardie Mineral Field Ann |
| A58546 | 1999 | Triton Resources Ltd | Raeside | 98% | Final Surrender Report E37/275 for period 14/12/1992 to 13/12/1998 ( Raeside Project). |
| A58652 | 1999 | Horizon Mining Nl | South Gwalia | 24% | Final Surrender Report E37/506 for period 22/12/1998 to 25/03/1999 (South Gwalia Project). |
| A58870 | 1999 | Great Central Mines Ltd | Bronzewing | <1% | Exploration Licences E36/161 E37/252,283,336 E53/224,284,304-305,387,394,573 Mining Licences M36/263,295, 312, |
| A58975 | 1999 | Triton Resources Ltd | Raeside | 41% | Raeside Project C49/1994 Annual Technical Report for year ending 30/06/99 |
| A59163 | 1999 | Kookynie Resources Nl | Lake Raeside | 82% | Lake Raeside Project. Annual Report 26/07/98-25/07/99. P37/5544-5545. |
| A57008 | 1999 | Sons Of Gwalia Ltd | Mary Bore | 2.7% | Mary Bore Project Annual Report for the Period 13 May 1997 12 May 1998. M37/371, P37/4257-4259, P37/4364, 4365 |
| A53482 | 1998 | Delta Gold Ltd | Glenorn | 7.6% | Annual Technical Report (E40/58) for the Glenorn Project Between 12th December 1996 to 11th December 1997. |
| A53583 | 1998 | Delta Gold Ltd | Glenorn | 7.6% | Annual Technical Report E40/58 for the Glenorn Project between 12th December 1996 to 11th December 1997. |
| A53612 | 1998 | Mr Stehn T | Clover Downs | 100% | Clover Downs Project - Prospecting Licence: 37/5294 Annual Report 02/02/97 - 01/02/98 |
| A53721 | 1998 | Heron Resources Ltd | Malcolm | 23% | Malcolm Project Lake Horan and Mt Melita prospects Exploration licences 37/350 and 40/72 Mount Margaret Minera |
| A54193 | 1998 | Stockdale Prospecting Ltd | Wilbah | 13% | Project, Combined Annual Report E37/359, 360 03/1998 |
| A54339 | 1998 | Sons Of Gwalia Ltd | Sandy Soak | <1% | Sandy Soak J.V. Project Annual Report, 01/01/97 - 31/12/97 E37/223, P37/3799-3803 |
| A54364 | 1998 | Sons Of Gwalia Ltd | Mary Bore | 2.7% | Mary Bore Project ,Annual Report for the period 13th May 1996 to 12th May 1997, M37/371; P37/4257-4259, P37/43 |
| A54418 | 1998 | Heron Resources Ltd | Malcolm | 61% | Malcolm Project, Lake Horan, Mount Margaret Mineral Field Exploration Licence: 37/350 Annual Report, 05/09/94 |
| A55098 | 1998 | Sons Of Gwalia Ltd | Punkah Wallah | <1% | Punkah Wallah J.V. Project, Annual Report 01/01/97 - 31/12/97 M37/172, 204, P37/4086 |
| A56128 | 1998 | Kookynie Resources Nl | Lake Raeside | 82% | Lake Raeside Project. P37/5544-5545, Annual Report for the period 26/07/97-25/07/98. |
| A53613 | 1998 | Mr Stehn T | Clover Downs | 100% | Clover Downs Project. Prospecting Licence: 37/5295 Annual Report 02/02/97 - 01/02/98 |
| A53682 | 1998 | North Ltd | Malcolm South | 7.7% | Annual Mineral Exploration Report on the Malcolm South JV Tenements. Leonora Project, for the period 01/12/96 |
| A54366 | 1998 | Sons Of Gwalia Nl | Central Well | 74% | Central Well Project, Annual Report for the period 15/07/1996 to 14/07/1997, E37/452; P37/4327-4329, 4366-437 |
All 451 report numbers over this ground
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 20 years · 8 July 2046
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over L 37/290 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold L 37/290? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.