NextMaps›WA Tenements›L 39/209

L 39/209

LiveMiscellaneous LicenceShire of LavertonMt. Morgans District

L 39/209 is a live miscellaneous licence in the Shire of Laverton, Western Australia, held by Anglogold Ashanti Australia Limited (part of AngloGold Ashanti). Granted on 21 Sept 2010 for 21 years, it expires on 20 Sept 2031. The ground is covered by 68 historical WAMEX reports.

Area
19.51ha
Expires
Sept 2031
in 5 years
WAMEX reports
68
WA median is 53
Report drilling
56
of 68 reports
Free Tenure Pack for L 39/209
The due diligence on this title in one report: register and compliance, every dealing, the history of the ground, drilling, geochemistry and land access. New accounts get one free.
For L 39/209 that covers 68 WAMEX reports · 20 earlier titles on the ground since 1970 · 1 native title determination · no conservation land.
Get the free Tenure PackGet the Tenure Pack
Laverton Explore on the live map

Register summary

Holder
Anglogold Ashanti Australia Limited
Part of
AngloGold Ashanti
Local government
Shire of Laverton
Application received
5 Mar 2010
Commenced
21 Sept 2010
Expiry
20 Sept 2031
Term
21 Years

The full record on L 39/209

The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.

Free account
  • Current holders and their shares (no change of holder on record)
  • The full record: 15 conditions and 2 endorsements
  • Native title context, combined reporting and rent status
Create a free account
Premium
  • At-risk and opportunity signals, and expenditure compliance over five years
  • Every register dealing (12 on record), with mortgages, caveats and transfers flagged
  • Expiry band, and how long the holder has had it
See Premium

Exploration history on this ground

68 historical WAMEX exploration reports intersect L 39/209: 27 report geochemistry or sampling, 52 include a digital data package.
Work on record: Diamond drilling 45 · RC drilling 41 · Mineral resource estimate 16 · Soil sampling 14 · Geophysical interpretation 13 · Mine production 11. Resource declared in A122815 (2020), A119211 (2019), A104898 (2015), A101830 (2014) and 12 more.
Rather than open these one by one on the DMPE site, have them read into one cited report on L 39/209, free for new accounts.
When this ground was worked · 66 of 68 reports dated
21970s
11980s
221990s
202000s
182010s
32020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A125157 2020 Anglogold Ashanti Australia Limited Western Ramps <1% EIS Round 20 - Western Ramps (Final Report)
A122815 2020 Anglogold Ashanti Australia Limited Sunrise Dam <1% Sunrise Dam (C144/1995) Annual Report to the Department of Mines, Industry Regulation and Safety for the perio
A124126 2020 Anglogold Ashanti Australia Limited Pink Lady <1% CO-FUNDED EIS REPORT, EIS Round 19 – Pink Lady, Sunrise Dam Gold Mine
A119211 2019 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum for the Period 1 January 2018 to 3
A120368 2019 Anglogold Ashanti Australia Limited Southern Shear - Sunrise Dam <1% EIS Southern Shear Zones – SDGM project (R#17)
63 more reports
A115940 2018 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3
A112079 2017 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016
A108112 2016 Anglogold Ashanti Australia Limited Sunrise Dam Group <1% Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/
A105466 2015 Saracen Gold Mines Pty Ltd Butcher Well <1% Butcher Well Project C345/1993 Annual Report for the period 01/01/2014 - 31/12/2015, E38/2306.....P39/5063
A107077 2015 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Project E38/2297 (Empie) Surrender Report for the period 20/10/2010 to 01/09/2015
A104898 2015 Anglogold Ashanti Australia Ltd Sunrise Dam Group <1% Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3
A101216 2014 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201
A101830 2014 Saracen Gold Mines Pty Ltd Butcher Well <1% Butcher Well Project C345/1993 Annual Report for the period 01 January 2013 to 31 December 2013, E38/2306, E39
A96848 2013 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995)
A97624 2013 Saracen Gold Mines Pty Ltd Butcher Well <1% Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279;
A100055 2013 Focus Minerals (Laverton) Pty Ltd Sunrise <1% Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545
A92885 2012 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995).
A96196 2012 Focus Minerals (Laverton) Pty Ltd Sunrise <1% Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797
A92958 2012 Rubicon Resources Ltd Laverton <1% Laverton Project Combined Report C86/2010 E38/2221, 2222, 2224, 2267, 2304, 2306 Annual Report 1st Jan 2011 to
A89346 2011 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010
A89526 2011 Rubicon Resources Ltd Laverton <1% Laverton Project Combined Report C86/2010 2010, Report Period: 1st January 2010 – 31 December 2010
A81076 2009 Anglogold Ashanti Australia Ltd SUNRISE DAM GROUP <1% SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3
A77574 2008 Anglogold Ashanti Australia Ltd Sunrise Dam <1% SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07
A74516 2007 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31
A70338 2005 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M
A70691 2005 Placer Dome Asia Pacific Ltd Sunrise - Sunset 2.3% Sunrise - Sunset Project, Annual Report for the period 1st January 2004 to 31st December 2004, P39/3076, P39/3
A68195 2004 Sons Of Gwalia Ltd Butcher Well <1% Butcher Well Project, Annual Report for the period 01/01/2003 to 31/12/2003 : P38/3083, E39/173, E39/325, E39
A68170 2004 Anglogold Australasia Ltd Sunrise Dam <1% Annual Report for the period 01/01/2003-31/12/2003, Sunrise Dam Project (C144/1995), M38/426, M38//427, M39/21
A68341 2004 Sons Of Gwalia Ltd Jubilee Well <1% Jubilee Well Project Surrender Report for the period 24 Febr uary 1993 to 5 February 2004 C345/1993 E38/449 Re
A68435 2004 Placer Dome Asia Pacific Ltd Sunrise/Sunset 2.3% Sunrise/Sunset Project, P39/3076, P39/3090, P39/3091, P39/3238, P39/3294, P39/3240. Mount Margaret Mineral Fii
A71952 2004 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t
A66170 2003 Placer (Granny Smith) Pty Ltd Sunrise-Sunset 1.3% Annual Report on Exploration period ending 30th September 2002 Sunrise-Sunset Project C185/1995: M39/217, P39/
A66523 2003 Sons Of Gwalia Ltd Jubilee Well <1% Annual Report for the period 24 February 2002 - 23 February 2003 Jubilee Well Project C50/1996: E38/449
A66542 2003 Anglogold Australia Ltd Sunrise Dam <1% Sunrise Dam Project, , Annual Report for the period 1 January 2002 to 31 December 2002, M39/347-48, 357, 366,
A64321 2002 Placer (Granny Smith) Pty Ltd Sunrise - Sunset 1.3% Annual Report on exploration Sunrise-Sunset Project M39/217, P39/3076, 3090-3091, 3119, 3238, 3240, 3294 for t
A64488 2002 Anglogold Australia Ltd Sunrise Dam <1% Annual Report For The Period 1 January 2001 to 31 December 2001. Report No: WA 12052. Combined Report No: C144
A62104 2001 Placer (Granny Smith) Pty Ltd Sunrise - Sunset 1.3% Annual Report on exploration Sunrise/Sunset Project M39/217, P39/3075, 3090-3091, 3119, 3238, 3240, 3294 for t
A62476 2001 Sons Of Gwalia Ltd Jubilee Well <1% Jubilee Well Project Annual Report For The Period 24 February 1999 - 23 February 2000 Tenement: E38/449.
A59851 2000 Placer (Granny Smith) Pty Ltd Sunrise - Sunset 1.3% Annual Report On Exploration Sunrise-Sunset Project M39/217, P39/3076,3090-3091,3119 For The Period 01/01/1999
A60321 2000 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project, M39/347-348,357,366,373-376, M38/426, Annual Report for the Period 1/1/1999 to 31/12/1999
A61954 2000 Anglogold Australasia Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, M39/348, M39/357, M39/366, M39/373, M39/375, M39/376, M39/426 & M39/374 Verificat
A58027 1999 Placer (Granny Smith) Pty Ltd Sunrise - Sunset 1.3% Sunrise - Sunset Project, Annual Report for the period 1st Janaury 1998 to 31st December 1998, M39/217; P39/
A59057 1999 Sons Of Gwalia Ltd Jubilee Well <1% Jubilee Well JV Project (formerly Sunrise Dam JV Project) Annual report for the period 24/02/98-23/02/99, E38/
A53829 1998 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, 348, 357, 366, 373-376, M38/426 Annual Report - Period Ending: 31/12/1997
A54452 1998 Placer (Granny Smith) Pty Ltd Sunset 1.3% Sunrise/Sunset Project, Mt Margaret Goldfield, W.A. 01/01/97 - 31/12/97 M39/217, P39/3076, 3090-3091, 3119, 32
A56263 1998 Sons Of Gwalia Ltd Sunrise Dam <1% Sunrise Dam JV Project Annual report for the period 24/02/97-23/02/98 E38/449 E39/421.
A57146 1998 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347, 348, 366, 372, 374, 375, 376, M38/426 Annual Report for the period ending 31/12/9
A50393 1997 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project M39/347 M39/348 M39/357 M39/366 M39/373` M39/374 M39/375 M39/376 and M38/426 annual report
A50913 1997 Placer (Granny Smith) Pty Ltd Sunset 1.3% Annual report on Exploration Sunrise/ Sunset Project M39/217 P39/3076 P39/3090 to P39/3091 P39/3119 P39/3238 P
A51563 1997 Sons Of Gwalia Ltd Sunrise Dam <1% Sunrise Dam Joint Venture Annual report for the year ending 23rd February 1997 Tenements E38/449 E39/421.
A46846 1996 Gasgoyne Gold Mines Nl Sunrise Dam North <1% Sunrise Dam North E38/449 and Sunrise Dam West E39/421 Annual Report for the year to 23 February 1996
A47061 1996 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Project E39/174 E39/206 E39/263 E39/229 and P38/2587 Annual report for the period ending 31 Decemb
A47500 1996 Placer Prospecting Pty Ltd Sunrise/Sunset 1.3% Second Annual report on Exploration Sunrise/Sunset Project M39/217 P39/3076 P39/3090 P39/3091 P39/3238 P39/324
A44129 1995 Gasgoyne Gold Mines Nl Sunrise Dam North <1% Sunrise Dam North Project E38/449 Annual Report for the year to 23 February 1995
A44303 1995 Acacia Resources Ltd Sunrise Dam <1% Sunrise Dam Group, Annual Report for the period 1 January to 31st December 1994. E39/174, 206, 229, 263 and P3
A46533 1995 Gasgoyne Gold Mines Nl Sunrise Dam North east <1% Sunrise Dam North East P38/2590 to P38/2592 Annual report for the year ending 16 August 1995
A40299 1994 Billiton Australia Pty Ltd Sunrise Dam <1% Annual Report for the period 01/01/93-31/12/93 Sunrise Dam Project E39/174,206,229,263
A41168 1994 Gasgoyne Gold Mines Nl Sunrise Dam North <1% Annual Report for the Sunrise Dam North Prospect E38/449 ,for the period 01/02/1993 to 10/02/1994.
A42103 1994 Placer Exploration Ltd Sunset 1.9% Annual Report for the period 06/93-06/94 Sunset Project P39/3090-91,3238-40,3076,& 3119
A38820 1993 Billiton Australia Pty Ltd Sunrise Dam <1% Annual Report for the period 01/01/92-31/12/92 Sunrise Dam Project E39/174,206,229,263
A36820 1992 Billiton Australia Pty Ltd Sunrise Dam <1% Sunrise Dam Project, Partial Surrender Report July 1992, . E39/174, 206, 229; Surrender Report E39/230.
A35603 1992 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report for 1 January 1991 to 31 December 1991 Sunrise Dam Project E39/174 E39/206 E39/229 E39/230 E39/2
A33010 1991 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report for 30 June 1989 to 31 December 1990 Sunrise Dam Project E39/174 E39/206 E39/227 E39/229 E39/230
A28729 1989 Billiton Australia Pty Ltd Sunrise Dam <1% Annual report ending 30 June 1989, Sunrise Dam Project, E39/174, E39/206, E39/227, E39/229, E39/230, P39/215
A9273 1973 Us Steel International Inc Ghost Rock <1% Ghost Rock Project, Non-statutory Report: 1972 Final Report, March 1973, MC29/1555-1560,1842, 2334-2335, 2337-
A3685 1973 International Nickel Aust Ltd Sunrise Dam 6% Sunrise Dam Project, Non-statutory Report: Brief Exploration Report for the period 2nd September 1970 to 19th
A38751 1753 Inco Australia Ltd Eastern Goldfields regional mapping <1% Eastern Goldfields regional mapping
A85886 1753 Anglogold Ashanti Australia Ltd Sunrise Dam <1% Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3

What does the exploration record say about this ground?

NextMaps reads the WAMEX reports over L 39/209 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Get the free reportStart the report Full register record on the map

Do you hold L 39/209? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.