E 38/3103
Register summary
- Holder
- Anglogold Ashanti Australia Limited
- Local government
- Shire of Laverton
- Application received
- 15 Feb 2016
- Commenced
- 11 Apr 2018
- Expiry
- 10 Apr 2028
- Term
- 5 Years (Extended)
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A132799 | 2022 | Lodestar Minerals Ltd | Jubilee Well | <1% | Annual Report for E38/3054 Jubilee Well for the period ending 12/09/2022 |
| A128857 | 2021 | Lodestar Minerals Ltd | Jubilee Well | <1% | Annual Exploration Report Jubilee Well E38/03054 for the period ending 12/09/2021 |
| A122815 | 2020 | Anglogold Ashanti Australia Limited | Sunrise Dam | 2.6% | Sunrise Dam (C144/1995) Annual Report to the Department of Mines, Industry Regulation and Safety for the perio |
| A124126 | 2020 | Anglogold Ashanti Australia Limited | Pink Lady | <1% | CO-FUNDED EIS REPORT, EIS Round 19 – Pink Lady, Sunrise Dam Gold Mine |
| A125157 | 2020 | Anglogold Ashanti Australia Limited | Western Ramps | <1% | EIS Round 20 - Western Ramps (Final Report) |
66 more reports
| A119211 | 2019 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | 2.6% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum for the Period 1 January 2018 to 3 |
| A119796 | 2019 | Oro Del Sur Pty Ltd | Laverton | <1% | E38/3054 Annual Technical Report for the period 13 September 2017 to 12 September 2018 |
| A120368 | 2019 | Anglogold Ashanti Australia Limited | Southern Shear - Sunrise Dam | <1% | EIS Southern Shear Zones – SDGM project (R#17) |
| A115940 | 2018 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3 |
| A112079 | 2017 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016 |
| A108112 | 2016 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/ |
| A104898 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group | 1% | Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3 |
| A105466 | 2015 | Saracen Gold Mines Pty Ltd | Butcher Well | 1.5% | Butcher Well Project C345/1993 Annual Report for the period 01/01/2014 - 31/12/2015, E38/2306.....P39/5063 |
| A107077 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 53% | Sunrise Dam Project E38/2297 (Empie) Surrender Report for the period 20/10/2010 to 01/09/2015 |
| A101216 | 2014 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 1% | Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201 |
| A101830 | 2014 | Saracen Gold Mines Pty Ltd | Butcher Well | 1.5% | Butcher Well Project C345/1993 Annual Report for the period 01 January 2013 to 31 December 2013, E38/2306, E39 |
| A102477 | 2014 | Focus Minerals Ltd | Mount Weld | <1% | Mt Weld E38/1652 Annual Report for the period 01/09/2013 to 31/03/2014 |
| A97624 | 2013 | Saracen Gold Mines Pty Ltd | Butcher Well | 1.5% | Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279; |
| A100055 | 2013 | Focus Minerals (Laverton) Pty Ltd | Sunrise | <1% | Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545 |
| A96848 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995) |
| A92958 | 2012 | Rubicon Resources Ltd | Laverton | 2.4% | Laverton Project Combined Report C86/2010 E38/2221, 2222, 2224, 2267, 2304, 2306 Annual Report 1st Jan 2011 to |
| A92885 | 2012 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995). |
| A96196 | 2012 | Focus Minerals (Laverton) Pty Ltd | Sunrise | <1% | Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797 |
| A89526 | 2011 | Rubicon Resources Ltd | Laverton | 2.4% | Laverton Project Combined Report C86/2010 2010, Report Period: 1st January 2010 – 31 December 2010 |
| A89346 | 2011 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010 |
| A90565 | 2011 | Crescent Gold Ltd | Childe Harold | <1% | Combined Annual Report on Exploration for the period 01/04/2010 to 31/03/2011; Childe Harold Project; C157/200 |
| A87437 | 2010 | Crescent Gold Ltd | Childe Harold | <1% | Combined Annual Report C133/2006 Ffor Leases E38/1652, 1ST April 2009 to 31st March 2010 |
| A81076 | 2009 | Anglogold Ashanti Australia Ltd | SUNRISE DAM GROUP | <1% | SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A82274 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | <1% | Childe Harold Project, Partial Surrender Report, E38/1652, blocks Kalgoorlie 749 p, u, y, z, and Kalgoorlie 75 |
| A82441 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | <1% | CHILDE HAROLD PROJECT Annual Report E38/1652 For the period 01/04/2008 to 31/03/2009, Group Reporting No. C157 |
| A77574 | 2008 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07 |
| A78425 | 2008 | Metex Resources Ltd | Childe Harold | <1% | CHILDE HAROLD PARTIAL SURRENDER REPORT E38/1652 blocks KALGOORLIE 0750 g,m,r,w; KALGOORLIE 0822 b,g,h,j,m,n, o |
| A74516 | 2007 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31 |
| A75232 | 2007 | Metex Resources Ltd | Childe Harold | <1% | Childe Harold Project, Annual Technical Report for the period 01/04/2006 - 31/03/2007, Group Reporting No C157 |
| A72825 | 2006 | Metex Resources Ltd | Childe Harold | <1% | W128 Childe Harold E38/1123,1529,1652,1658,P38/3211-3213, Annual Technical Report for the Period 01/04/2005 to |
| A70691 | 2005 | Placer Dome Asia Pacific Ltd | Sunrise - Sunset | <1% | Sunrise - Sunset Project, Annual Report for the period 1st January 2004 to 31st December 2004, P39/3076, P39/3 |
| A70338 | 2005 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M |
| A68341 | 2004 | Sons Of Gwalia Ltd | Jubilee Well | 10% | Jubilee Well Project Surrender Report for the period 24 Febr uary 1993 to 5 February 2004 C345/1993 E38/449 Re |
| A68435 | 2004 | Placer Dome Asia Pacific Ltd | Sunrise/Sunset | <1% | Sunrise/Sunset Project, P39/3076, P39/3090, P39/3091, P39/3238, P39/3294, P39/3240. Mount Margaret Mineral Fii |
| A71952 | 2004 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t |
| A68170 | 2004 | Anglogold Australasia Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/2003-31/12/2003, Sunrise Dam Project (C144/1995), M38/426, M38//427, M39/21 |
| A68195 | 2004 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 01/01/2003 to 31/12/2003 : P38/3083, E39/173, E39/325, E39 |
| A66170 | 2003 | Placer (Granny Smith) Pty Ltd | Sunrise-Sunset | <1% | Annual Report on Exploration period ending 30th September 2002 Sunrise-Sunset Project C185/1995: M39/217, P39/ |
| A66523 | 2003 | Sons Of Gwalia Ltd | Jubilee Well | 10% | Annual Report for the period 24 February 2002 - 23 February 2003 Jubilee Well Project C50/1996: E38/449 |
| A66542 | 2003 | Anglogold Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project, , Annual Report for the period 1 January 2002 to 31 December 2002, M39/347-48, 357, 366, |
| A64321 | 2002 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | <1% | Annual Report on exploration Sunrise-Sunset Project M39/217, P39/3076, 3090-3091, 3119, 3238, 3240, 3294 for t |
| A64488 | 2002 | Anglogold Australia Ltd | Sunrise Dam | <1% | Annual Report For The Period 1 January 2001 to 31 December 2001. Report No: WA 12052. Combined Report No: C144 |
| A62476 | 2001 | Sons Of Gwalia Ltd | Jubilee Well | 10% | Jubilee Well Project Annual Report For The Period 24 February 1999 - 23 February 2000 Tenement: E38/449. |
| A62104 | 2001 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | <1% | Annual Report on exploration Sunrise/Sunset Project M39/217, P39/3075, 3090-3091, 3119, 3238, 3240, 3294 for t |
| A59851 | 2000 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | <1% | Annual Report On Exploration Sunrise-Sunset Project M39/217, P39/3076,3090-3091,3119 For The Period 01/01/1999 |
| A60321 | 2000 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project, M39/347-348,357,366,373-376, M38/426, Annual Report for the Period 1/1/1999 to 31/12/1999 |
| A61954 | 2000 | Anglogold Australasia Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, M39/348, M39/357, M39/366, M39/373, M39/375, M39/376, M39/426 & M39/374 Verificat |
| A58027 | 1999 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | <1% | Sunrise - Sunset Project, Annual Report for the period 1st Janaury 1998 to 31st December 1998, M39/217; P39/ |
| A59057 | 1999 | Sons Of Gwalia Ltd | Jubilee Well | 10% | Jubilee Well JV Project (formerly Sunrise Dam JV Project) Annual report for the period 24/02/98-23/02/99, E38/ |
| A56263 | 1998 | Sons Of Gwalia Ltd | Sunrise Dam | 7% | Sunrise Dam JV Project Annual report for the period 24/02/97-23/02/98 E38/449 E39/421. |
| A53829 | 1998 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, 348, 357, 366, 373-376, M38/426 Annual Report - Period Ending: 31/12/1997 |
| A54452 | 1998 | Placer (Granny Smith) Pty Ltd | Sunset | <1% | Sunrise/Sunset Project, Mt Margaret Goldfield, W.A. 01/01/97 - 31/12/97 M39/217, P39/3076, 3090-3091, 3119, 32 |
| A57146 | 1998 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, 348, 366, 372, 374, 375, 376, M38/426 Annual Report for the period ending 31/12/9 |
| A50393 | 1997 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347 M39/348 M39/357 M39/366 M39/373` M39/374 M39/375 M39/376 and M38/426 annual report |
| A50913 | 1997 | Placer (Granny Smith) Pty Ltd | Sunset | <1% | Annual report on Exploration Sunrise/ Sunset Project M39/217 P39/3076 P39/3090 to P39/3091 P39/3119 P39/3238 P |
| A51563 | 1997 | Sons Of Gwalia Ltd | Sunrise Dam | 7% | Sunrise Dam Joint Venture Annual report for the year ending 23rd February 1997 Tenements E38/449 E39/421. |
| A46846 | 1996 | Gasgoyne Gold Mines Nl | Sunrise Dam North | 7% | Sunrise Dam North E38/449 and Sunrise Dam West E39/421 Annual Report for the year to 23 February 1996 |
| A47500 | 1996 | Placer Prospecting Pty Ltd | Sunrise/Sunset | <1% | Second Annual report on Exploration Sunrise/Sunset Project M39/217 P39/3076 P39/3090 P39/3091 P39/3238 P39/324 |
| A44129 | 1995 | Gasgoyne Gold Mines Nl | Sunrise Dam North | 10% | Sunrise Dam North Project E38/449 Annual Report for the year to 23 February 1995 |
| A46533 | 1995 | Gasgoyne Gold Mines Nl | Sunrise Dam North east | 45% | Sunrise Dam North East P38/2590 to P38/2592 Annual report for the year ending 16 August 1995 |
| A41168 | 1994 | Gasgoyne Gold Mines Nl | Sunrise Dam North | 10% | Annual Report for the Sunrise Dam North Prospect E38/449 ,for the period 01/02/1993 to 10/02/1994. |
| A42103 | 1994 | Placer Exploration Ltd | Sunset | <1% | Annual Report for the period 06/93-06/94 Sunset Project P39/3090-91,3238-40,3076,& 3119 |
| A9273 | 1973 | Us Steel International Inc | Ghost Rock | <1% | Ghost Rock Project, Non-statutory Report: 1972 Final Report, March 1973, MC29/1555-1560,1842, 2334-2335, 2337- |
| A3685 | 1973 | International Nickel Aust Ltd | Sunrise Dam | 2.3% | Sunrise Dam Project, Non-statutory Report: Brief Exploration Report for the period 2nd September 1970 to 19th |
| A85886 | 1753 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 20 months · 10 Apr 2028
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 38/3103 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 38/3103? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.