E 45/5231
Register summary
- Holder
- Haoma Mining Nl
- Local government
- Shire of East Pilbara
- Application received
- 3 May 2018
- Commenced
- 21 Apr 2023
- Expiry
- 20 Apr 2028
- Term
- 5 Years
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A146262 | 2025 | Haoma Mining Nl | North Shaw | <1% | Partial Surrender E45/04879 for the period ending 10/12/2024 |
| A138222 | 2024 | Infinity Metals Group - Hong-Jim Saw | Panorama | <1% | Partial Surrender E45/4779 Panorama for the period ending 12/01/2024. |
| A122392 | 2020 | Sayona Lithium Pty Ltd | Cooglegong | <1% | Annual Report, Cooglegong Project E45/4738 for the period 30 October 2018 to 29 October 2019 |
| A122483 | 2020 | Haoma Mining Nl | Agrippa Ridge | <1% | Annual Report For E45/4879 (Agrippa Ridge) for the period 11 December 2018 to 10 December 2019 |
| A123898 | 2020 | Fe Limited; Macarthur Lithium Pty Ltd | Panorama | <1% | Annual Technical Report Panorama C73/2019 for the period ending 31/12/2020 |
155 more reports
| A122719 | 2020 | Haoma Mining Nl; Elazac Mining Pty Ltd | North Pole - North Shaw | 1.7% | Annual Report for C282/1997 North Pole/North Shaw Project for the period 1 December 2018 to 30 November 2019 |
| A122720 | 2020 | Haoma Mining Nl; Elazac Mining Pty Ltd | Hillside - Soansville | <1% | Annual Report For C283/1997 (Hillside/Soansville) for the period 1 December 2018 to 30 November 2019 |
| A119040 | 2019 | Sayona Mining Limited | Cooglegong | <1% | Cooglegong Lithium Project E45/04738 Annual Technical Report for the period 30 October 2017 to 29 October 2018 |
| A118964 | 2019 | Haoma Mining Nl | North Shaw - Hillside | <1% | Surrender Report E45/4071 for the period 29 July 2013 to 30 November 2018 |
| A119135 | 2019 | Haoma Mining Nl; Elazac Mining Pty Ltd | North Pole - North Shaw | 5.1% | Annual Report C282/1997 North Pole - North Shaw Project for the period 1 December 2017 to 30 November 2018 |
| A119417 | 2019 | Macarthur Lithium Pty Ltd; Artemis Resources Limited | E45/4779 | <1% | E45/4779 Annual Report for the period 16 January 2018 to 15 January 2019 |
| A120962 | 2019 | Wodgina Lithium Pty Ltd | Shaw River | <1% | Final Surrender Report Shaw River E45/4763 for the period 13/7/2018 to 20/5/2019 |
| A119187 | 2019 | Haoma Mining Nl; Elazac Mining Pty Ltd | Soansville | <1% | Annual Report C283/1997 Soansville Project for the period 1 December 2017 to 30 November 2018 |
| A116690 | 2018 | Haoma Mining Nl | Soansville | <1% | C283/1997 Soansville Project Annual Report for the period 1 December 2016 to 30 November 2017, E45/04174, E45/ |
| A116699 | 2018 | Haoma Mining Nl | North Pole - Lalla Rookh - Callina Creek | 1.5% | North Pole Project C282/1997 Annual Report for the period 1 December 2016 to 30 November 2017, E45/02532, E45/ |
| A118038 | 2018 | Macarthur Lithium Pty Ltd | Bonnie Scot | <1% | Annual Report E45/4764 The Bonnie Scot Prospect for the period 10 August 2017 to 9 August 2018 |
| A112091 | 2017 | Haoma Mining Nl | North Pole - Lalla Rookh - Callina Creek | 15% | North Pole Project C282/1997 Annual Report For the Period 1 December 2015 to 30 November 2016, E45/02532.....P |
| A112687 | 2017 | Haoma Mining Nl | Market Creek | <1% | Market Creek E45/3660 Final Surrender Report For the Period 20 February 2012 to 17 February 2017 |
| A112488 | 2017 | Haoma Mining Nl | Tambourah - Soansville - Mercury Hill - | <1% | C283/1997 Soansville Project Annual Report for the period 01/12/2015 to 30/11/2016, E45/04174, E45/04175, E45/ |
| A108265 | 2016 | Haoma Mining Nl | North Pole - Lalla Rookh - Callina Creek | 15% | North Pole Project C282/1997 Annual Report 1 December 2014 to 30 November 2015, E 45/02532, E45/03930, E45/039 |
| A108317 | 2016 | Haoma Mining Nl | Tambourah/Soansville/Mercury Hill/Tank H | <1% | Tambourah/Soansville/Mercury Hill/Tank Hill (Group 4) Project Annual Report 2015 |
| A108602 | 2016 | Haoma Mining Nl | Market Creek | <1% | Market Creek E45/3660 Annual Report for the period 20/02/2015 to 19/02/2016 |
| A105285 | 2015 | Haoma Mining Nl | Market Creek | <1% | E45/3660 Market Creek Project Annual Report for the period 20 February 2014 to 19 February 2015 |
| A105489 | 2015 | Atlas Iron Ltd | Mount Webber | 1.1% | Mt Webber Project E45/2922‐I P45/2702‐I 2705‐I 2706‐I 2739‐I P45/2901‐I to P45/ 2904‐I & M45/1197‐I Annual Tec |
| A107121 | 2015 | Fortescue Metals Group Ltd | Hillside | <1% | C129/2011 Hillside Final Surrender Report For the Period 1 March 2011 to 17 July 2015, E45/03445, E45/02861, E |
| A104877 | 2015 | Haoma Mining Nl | North Pole - Lalla Rookh - Callina Creek | 15% | North Pole Project C282/1997 Group 3 Annual Report for the Period 1 December 2013 to 30 November 2014, E45/253 |
| A101203 | 2014 | Haoma Mining Nl | North Pole | 11% | North Pole (Group 3), Annual Report for the Period 1st December 2012 – 30th November 2013, M45/302 M45/328, M4 |
| A101446 | 2014 | Haoma Mining Nl | North Pole | <1% | E45/3219 - North Pole Surrender Report for the period 5th February 2009 – 4th February 2014 |
| A102085 | 2014 | Atlas Iron Ltd | Mount Webber | <1% | Mt Webber Project, Annual Technical Report, For the Period Ending 29 March 2014, E45/2186-I 2187-I 2921 2922-I |
| A103943 | 2014 | Atlas Iron Ltd | Mount Webber | <1% | Mount Webber Project (C71/2003) E45/2186‐I 2187‐I 2496‐I & 2921‐I for the period 05/03/2002 to 17/10/2014 |
| A104367 | 2014 | Fortescue Metals Group Ltd | Hillside | <1% | Hillside Project, Annual Report for the period 01/11/2013 to 31/10/2014, E45/2860-2862, 2867, 2946, 3328, 3412 |
| A101463 | 2014 | Haoma Mining Nl | Market Creek | <1% | E45/3660 Market Creek Annual Report for the period 20 February 2013 to 19 February 2014 |
| A96314 | 2013 | Haoma Mining Nl | North Pole | <1% | North Pole Project, Annual Report for the period 1st December 2011 to 30th November 2012, M45/302, 328-329, 39 |
| A97468 | 2013 | Haoma Mining Nl | Market Creek | <1% | Market Creek Project, Annual Report for the period 20th February 2012 to 19th February 2013, E45/3660. |
| A99380 | 2013 | Atlas Iron Ltd | Abydos | 100% | ABYDOS PROJECT P45/2705 Annual Report to the Department of Mines and Petroleum for the Period Ending 29 August |
| A100051 | 2013 | Atlas Iron Ltd | Mount Webber | <1% | Mt Webber Project E45/2921 Partial Surrender Report to the Department of Mines and Petroleum For the Period 29 |
| A100572 | 2013 | Fortescue Metals Group Ltd | Hillside | <1% | Annual Report for the Period 1 November 2012 to 31 October 2013, C129/2011 Hillside Project E45/2861, E45/2862 |
| A97509 | 2013 | Atlas Iron Ltd | Mount Webber | <1% | Mount Webber Project, Annual Report for the period ending 29th March 2013, E45/2186-2187, 2496, 2921-2922, 298 |
| A97703 | 2013 | Atlas Iron Ltd | Mount Webber | <1% | Mount Webber Project, Partial Surrender Report for the period 16th March 2006 to 15th March 2013, E45/2186 & 2 |
| A93517 | 2012 | Atlas Iron Ltd | Mount Webber | <1% | MT WEBBER PROJECT to the Department of Mines and Petroleum For the Period Ending 29 March 2012, C71/2003, E45/ |
| A93901 | 2012 | Haoma Mining Nl | North Pole | <1% | North Pole (Group 3), Annual Report for the Period 1st December 2010 – 30th November 2011 |
| A94689 | 2012 | Haoma Mining Nl | North Shaw | 22% | E45/2784 North Shaw Project Surrender Report 11th April 2007 - 10th April 2012 |
| A94903 | 2012 | Atlas Iron Ltd | Abydos | 100% | ABYDOS PROJECT P45/2705 Annual Report to the Department of Mines and Petroleum for the Period Ending 29 August |
| A95672 | 2012 | Haoma Mining Nl | North Shaw - Hillside | 19% | C71/2004 North Shaw/Hillside Project Annual Report E45/2955, E45/2784 for the period 1 August 2011 to 31 July |
| A95671 | 2012 | Haoma Mining Nl | North Shaw - Hillside | <1% | E45/2955 North Shaw / Hillside Project Surrender Report 26 September 2007 - 25 September 2012 |
| A96143 | 2012 | Fortescue Metals Group Ltd | Hillside | <1% | Hillside Project, Annual Report for the period 01/11/2011 to 31/10/2012, E45/2860-2862, 2867, 2946, 3328, 3412 |
| A89779 | 2011 | Giralia Resources Nl | Daltons | <1% | Daltons Project E45/2186, 2187, 2921, 2922, C71/2003, Annual Report to DMP Period Ending 29 March, 2011 |
| A90433 | 2011 | Haoma Mining Nl | North Shaw | 22% | North Shaw Project, Partial Surrender Report for the period 11th April 2007 to 28th March 2011, E45.2784. (C71 |
| A91705 | 2011 | Haoma Mining Nl | North Shaw | 19% | Annual report for the period 1st August 2010 to 31st July 2011, Combined Reporting Group C71/2004, North Shaw |
| A89861 | 2011 | Haoma Mining Nl | North Pole | <1% | North Pole (Group 3), Annual Report for the Period 1 December 2009 – 30 November 2010, C282/1997 |
| A88569 | 2010 | Haoma Mining Nl | North Shaw | 29% | Annual report for the period 1st August 2009 to 31st July 2010, Combined Reporting Group C70/2000, North Shaw |
| A86548 | 2010 | Giralia Resources Nl | Daltons | <1% | Daltons Project E45/2186, 2187, 2921, 2922 Annual Report to DMP Period Ending 29 March, 2010 |
| A86584 | 2010 | Haoma Mining Nl | North Shaw | <1% | North Shaw E45/3219 - Annual Report for the Period 5 February 2009 to 4 February 2010 |
| A87562 | 2010 | Haoma Mining Nl | North Shaw | 22% | North Shaw Project E45/2784 Surrender Report, From 11 April 2007 to 10 April 2010 |
| A81669 | 2009 | Giralia Resources Nl | Daltons | <1% | Daltons Project E45/2186, 2187, 2921, 2922 and P45/2702 Annual Report to DMP Period Ending 29 March, 2009 |
| A80143 | 2008 | Haoma Mining Nl | North Shaw | 29% | ANNUAL REPORT FOR THE PERIOD 29 JULY 2007 1 AUGUST 2008 |
| A80593 | 2008 | Giralia Resources Nl | Daltons | <1% | Daltons Project E45/2186, 2187, 2921, 2922 Annual Report to DOIR, Period Ending 31 December, 2008, C71/2003 |
| A76646 | 2007 | Haoma Mining Nl | North Shaw | 37% | NORTH SHAW PROJECT ANNUAL REPORT FOR THE PERIOD 31 JULY 2006 - 1 AUGUST 2007 |
| A75860 | 2007 | Giralia Resources Nl | Daltons | <1% | E45/2186 and 2187 Daltons Project C71/2003 M11904 Combined Annual Technical Report for the 12 Months Ending 29 |
| A72074 | 2006 | Haoma Mining Nl | North Shaw | <1% | North Shaw Project E45/2179, Surrender Report 2005, (Haoma Report No. 05-02-2006-01, Marble Bar). |
| A72610 | 2006 | Giralia Resources Nl | Daltons | <1% | E45/2186,2187 Daltons Project, Combined Annual Technical Report C71/2003, For the 12 Months Ending 29 March 20 |
| A73912 | 2006 | Haoma Mining Nl | North Shaw | 19% | North Shaw Project E45/2188-2189, Annual Report for the Period 31 July 2005 to 1 August 2006, Combined Reporti |
| A69738 | 2005 | Haoma Mining Nl | North Shaw-Hillside | <1% | Partial Surrender Report for the period 31/07/00 - 01/01/05, North Shaw-Hillside Project, E45/2179. |
| A70820 | 2005 | Haoma Mining Nl | North Shaw | 37% | North Shaw Project, E45/2188, Annual report for the period ending July 2005 (Report No. 05-02-2005-03, Marble |
| A70821 | 2005 | Haoma Mining Nl | North Shaw | <1% | North Shaw Project, E45/2179, Annual report for the period ending July 2004 (Report No. 05-02-2005-02, Marble |
| A70941 | 2005 | Haoma Mining Nl | North Shaw | <1% | North Shaw Project E45/2179, Annual report for the period ending July 2005 (Report No. 05-02-2005-04, Marble B |
| A71128 | 2005 | Giralia Resources Nl | Daltons | <1% | E45/2186 and 2187, Daltons Project C71/2003, M 11904, Combined annual technical report for the 12 months endin |
| A68997 | 2004 | Giralia Resources Nl | Daltons | <1% | Combined Annual report for the period ending 29/03/2004 Daltons Project (C71/2003), E45/2186, E45/2187 |
| A69093 | 2004 | Haoma Mining Nl | North Shaw Gold Mining Centre | 37% | Annual Report for the Period 05/04/2003 to 05/04/2004 North Shaw Gold Mining Centre E45/2188 |
| A66205 | 2003 | Haoma Mining Nl | North Shaw | <1% | Tenement E45/2062, North Shaw , East Pilbara Region, Surrender Report February 2003. |
| A67027 | 2003 | Haoma Mining Nl | North Shaw | 37% | Annual Report for the period ending 05/06/2003 E45/2188 North Shaw East Pilbara District |
| A67049 | 2003 | Giralia Resources Nl | Daltons | <1% | Annual technical Report for the 12 months ending 24 March 2003 Daltons Project E45/2187 |
| A67762 | 2003 | Haoma Mining Nl | North Shaw | <1% | Annual Report for the period ending 29/09/2003 North Shaw Project E45/2179 |
| A66109 | 2003 | Haoma Mining Nl | North Shaw | <1% | Annual Report for the period 31st July 2001 to 30th July 2002 E45/2179 - North Shaw - East Pilbara Region. |
| A66283 | 2003 | Haoma Mining Nl | North Pole/ Lalla Rookh/ Callina Creek/ | <1% | Annual Report for the period ending November 2003 North Pole Lalla Rookh, Callina Creek, North Shaw M45/650, M |
| A64005 | 2002 | Haoma Mining Nl | North Pole/ Lalla Rookh/ Callina Creek/ | <1% | Annual Report for the period ending November 2001 Group 3 tenements; M45/650, M45/651, M45/665, M45/329, M45/3 |
| A64054 | 2002 | De Beers Australia Exploration Ltd | E45/2179 | <1% | Partial Surrender Report for exploration licence 45/2179. |
| A65028 | 2002 | De Beers Australia Exploration Ltd | North Shaw | 37% | Annual Report for Exploration Licence 45/2188 May 2002. |
| A64172 | 2002 | Haoma Mining Nl | Marble Bar | <1% | Annual Report for period ending November 30, 2001 Group 2 tenements - Marble Bar M45/235; M45/296; M45/655; M4 |
| A62012 | 2001 | Haoma Mining Nl | North Pole, Lalla Rookh, Callina Creek, | <1% | Group 3 - North Pole, Lalla Rookh, Callina Creek, North Shaw tenements: M45/650, M45/651, M45/665, M45/329, M4 |
| A62138 | 2001 | Haoma Mining Nl | Marble Bar | <1% | Annual Report For The Period Ending November 2000. Marble Bar SF50-08. Tenements: 45/1249, E45/1273, E45/1606, |
| A63497 | 2001 | De Beers Australia Exploration Ltd | Hillside | <1% | Hillside Annual Report for exploration licence 45/2179. |
| A59703 | 2000 | Haoma Mining Nl | Lalla Rookh - North Pole | 9.1% | Group 3, Lalla Rookh -North Pole, Tenements E45/1453 and E45/1513, Partial Surrender Report for the period end |
| A60049 | 2000 | Haoma Mining Nl | Marble Bar | <1% | Annual Report For The Period Ending November 1999. Marble Bar SF50-08. Tenements: E45/1249, E45/1273, E451607, |
| A60184 | 2000 | Haoma Mining Nl | North Shaw | 18% | Group 3 North Pole, Lalla Rookh, Callina Creek, North Shaw Tenements E45/1513,E45/1600,E45/1900,E45/1822,E45/1 |
| A60185 | 2000 | Haoma Mining Nl | North Pole,Lalla Rookh,Callina Creek,Nor | 15% | North Pole,Lalla Rookh,Callina Creek,North Shaw Tenements E45/1868,E45/1900E45/1513,E45/1600,M45/650,M45/651,M |
| A58642 | 1999 | Haoma Mining Nl | North Shaw | 9.1% | Surrender Report E45/1453,1513 for period ending July 1999 ( North Shaw Project). |
| A59336 | 1999 | Haoma Mining Nl | North Shaw | 54% | Partial Surrender Report E45/1600 for the period ending August 1999. |
| A54804 | 1998 | Gold Partners Nl | Market Creek/ North Shaw | <1% | North Shaw Project, Market Creek,Partial Surrender Report for the period 15th September 1994 to 27th March1998 |
| A53072 | 1997 | Geographe Resources Ltd | North Shaw | 23% | North Shaw Project, Annual Report for year ending 18th August 1997, E45/1453, 1513, & 1600. |
| A49396 | 1996 | Gold Partners Nl | North Shaw | <1% | Market Creek Project Annual Report E45/1513 for Period 15/09/1995 to 14/09/1996, Soil Sampling, Geological Map |
| A49398 | 1996 | Gold Partners Nl | North Shaw | 41% | North Shaw Project, Annual Report E45/1453, 1600, 2130 and 2131for the year ending August 30th 1996. |
| A49399 | 1996 | Gold Partners Nl | North Shaw | 71% | North Shaw Project Final Surrender Report for the Yeaar ending 19 August 1996, E45/1037 |
| A46082 | 1995 | Gold Partners Nl | North Shaw | 36% | North Shaw Project, Annual Report Exploration Licences E45/1037&1453 ; Prospecting Licences P45/2130 & 2131 fo |
| A46198 | 1995 | Gold Partners Nl | Market Creek | <1% | Market Creek Project, Annual Report E45/1513 for the year ending September 14th 1995. |
| A39976 | 1994 | Gold Partners Nl | North Shaw | 72% | North Shaw Project, Annual Report for the year ending !st October 1993, E45/1037, P45/2130 & P45/2131. |
| A41760 | 1994 | Gold Partners Nl | North Shaw | 36% | North Shaw Project, Annual Report for the year ending 30th August 1994, E45/1037, 1453, 2130 & 2131. |
| A36721 | 1992 | Jade Creek Exploration Nl | North Shaw | 71% | North Shaw Project, Annual Report for the period 30th June 1991 to 30th June 1992, E45/1037. |
| A39020 | 1992 | Gold Partners Nl | North Shaw | 72% | North Shaw Project, Annual Report for the period ending November 1992, E45/1037, P45/2130 & 2131. |
| A34418 | 1991 | Lynas Gold Nl | Lynas Find | 3.8% | Lynas Find Project, Non-statutory Report:Exploration Report, February 1991, M45/278,281 & 282; P45/1412-1413, |
| A31018 | 1990 | Lynas Gold Nl | McPhee's Patch South | 5.7% | Exploration Report on Reverse Circulation Percussion Drilling at McPhee's Patch South, Mining lease M45/282 an |
| A31254 | 1990 | Gold Partners Nl | North Shaw | 75% | North Shaw (JV) Project, Non-statutory Report: Summary Report for the period 01/01/1989 to 01/01/1990, M45/221 |
| A27823 | 1989 | Lynas Gold Nl | Lynas Find | 2.4% | Lynas Find Project, Annual report 1988 on M45/278, M45/281, M45/282, P45/1412, P45/1413, P45/1481, P45/1482, |
| A28385 | 1989 | Greenex Ltd | Pilbara | 1.5% | Pilbara, 1989, Feasibility Study, E45/327. |
| A28919 | 1989 | Lynas Gold Nl | Pilgangoora - Lynas Find | 2.9% | Non-statutory Report : Regional Assessment Pilgangoora District Central Pilbara WA (1989) M45/54, M45/278, M45 |
| A28378 | 1989 | Greenex Ltd | Shaw River | 1.4% | Shaw River Project, Non-statutory Report: Exploration Report , February 1989, M45/20, 44, 46, 81, 260-261, 287 |
| A28379 | 1989 | Greenex Ltd | Shaw River | 1.4% | Shaw River Project, Non-statutory Report: Thin Sections & Sample Data, July 1987, M45/20, 44, 46, 81, 260-261, |
| A26223 | 1989 | Auridiam Nl | North Shaw | <1% | North Shaw Prospect, E45/324, E45/772, ML45/369, P45/1553-1554, Exploration Report, 1998. |
| A29685 | 1989 | Lynas Gold Nl | Lynas Find | 3.9% | Lynas Find Project,Annual Report for the period 01/01/1989 to 31/12/1989, M45/278,281 & 282 ; P45/1412, P45/1 |
| A22310 | 1988 | Greenex Ltd | Pilbara | 2.1% | Pilbara Tin - Tantalum - Rare Earth Project, Annual report January 1988 |
| A25218 | 1988 | Greenbushes Ltd | Hartigans, Spear Hill | 1.4% | [ Shaw River tin-tantalum - rare earth exploration, Hartigans and Spear Hill, Non-statutory report, E45/327 ] |
| A28387 | 1988 | Greenex Ltd | Pilbara | 1.4% | Pilbara, Mining Feasibility Study and Cost Analysis, December 1988. |
| A32422 | 1988 | Greenbushes Ltd | Pilbara | 2.2% | Pilbara Project,1987 Annual Report, January 1988, E45/327, P500-510,513-519,615-617,621-626, 863,1504-1507,151 |
| A23913 | 1988 | Lynas Gold Nl | Lynas Find | 3.2% | Lynas Find Project, -1987 Annual Report . P45/193-194, 241-242, 278, 449-451, 632. M45/54 , February 1988. |
| A24569 | 1988 | Greenbushes Ltd | Shaw River - Pilbara | 1.5% | Pilbara Tin Tantalum Rare Earth Project, Pre feasibility study, April 1988, E45/327; P45/864-865, 1041-1042, 1 |
| A25946 | 1988 | Gold Partners Nl | North Shaw | 75% | Non-statutory Report : Summary of Activities for 09/87-10/88 North Shaw Project, P45/1005,1090,1091,1158-116 |
| A26147 | 1988 | Gold Partners Nl | North Shaw | 75% | Non-statutory Report: Reverse Circulation Drilling, North Shaw (JV) Project, December 1987 - August 1988, P45/ |
| A27312 | 1988 | Lynas Gold Nl | Pilgangoora | 69% | Non-statutoryReport on Stream Sediment Sampling in Pilgangoora Area, East Pilbara District, W.A. P45/1412 and |
| A19220 | 1987 | Greenex Ltd | Shaw River - Pilbara | <1% | Pilbara Tin, Tantalum, Rare Earth Project, Progress [annual] report, December 1986, E45/327, M45/20...45/81, P |
| A21364 | 1987 | Nautilus Resource Management Pty Ltd | North Shaw | 94% | Progress Report on P45/1189-1191 North Shaw Project,, East Pilbara Mineral Field. (June 1987) |
| A21797 | 1987 | Auridiam Nl | North Shaw | <1% | North Shaw Project, Annual [Interim] Report for the period 3rd September 1986 to 2nd September 1987, E45/324 & |
| A19763 | 1987 | Clackline Refractories Ltd | Lynas Find | 6.4% | Non-statutory Report: Report on Geochemical Exploration at the Lynas Find Project Report for P45/449 to P45/45 |
| A21365 | 1987 | Growth Resources Nl | M4386/4: North Shaw gold exploration | 87% | A Preliminary Investigation of P45/1126-1127 and M45/221, North Shaw Mining Centre, East Pilbara Mineral Field |
| A21484 | 1987 | Gold Partners Nl | North Shaw | 75% | Non-statutory Report : Progress Report on the North Shaw Joint Venture PL's45/1005 PL45/1090 PL45/1091 PL45/11 |
| A20045 | 1986 | Growth Resources Nl | North Shaw | 100% | Non-statutory Report : Progress Report on the North Shaw Project, P45/527, 1986. |
| A20684 | 1986 | Greenbushes Tin Ltd | Paddy Market Creek | 98% | Paddy Market Creek Alluvial Gold Prospect, Annual report January 1986, P45/511 - 512 |
| A18384 | 1986 | View Resources Ltd | North Shaw | 100% | Non-statutory Report : Progress Report on North Shaw P45/527 (1986) |
| A19357 | 1986 | Auridiam Nl | North Shaw | 75% | North Shaw Project, Annual Report, April 1986, M45/228, P45/1005, P45/1090-1091 & P45/1158-1163 .[Preliminary |
| A21483 | 1986 | Gold Partners Nl | North Shaw | 75% | Non-statutory Report :A Preliminary Appraisal of the North Shaw Joint Venture PL's45/1005 PL45/1090 PL45/1091 |
| A15861 | 1985 | Freeport Of Australia Inc | The Island | 19% | The Island Project, Non-statutory Report: Surrender Report for the period ending 31/12/1984, E45/324; P45/462, |
| A18529 | 1985 | Clackline Refractories Ltd | Lynas Find | 2.9% | Lynas Find Project, Non-statutory Report, December 1985 PL45/188 PL45/193 PL45/194 PL45/241 PL45/242 PL45/278 |
| A19016 | 1985 | Gold & Mineral Exploration Nl | North Shaw - Island Hill | 19% | Preliminary geological (non-statutory) report, North Shaw Prospect, P45/462, P45/659-668, P45/670, P45/1005, E |
| A16386 | 1985 | Greenex Ltd | Spear Hill, Pilbara | <1% | Pilbara Project, Annual Report for the period 25/07/1984 to 25/07/1985, E45/327. |
| A15862 | 1984 | Cra Exploration Pty Ltd | North Shaw | 11% | North Shaw Project, Non-statutory Report: Prospect Evaluation Report, April 1984, P45/659-667, 462 & E45/324. |
| A11222 | 1982 | Greenex Ltd | Pilbara | 1.5% | Pilbara Project, Non-statutory Report: Progress Report, February 1982, ( Tenement Schedule , see page 61). |
| A10398 | 1981 | Greenex Ltd | Spear Hill | 6.4% | Spear Hill Project, Non-statutory Report: Spear Hill Exploration Programme,for the period July-December 1979, |
| A9131 | 1980 | Australian Anglo American Ltd | Chocolate Hill | 9.1% | Chocolate Hill Project, Annual Report, January 1971 : Costeans , TR70/4725. ( See A 2257 for text). |
| A8135 | 1977 | Straits Trading Co Ltd | Spear Hill | <1% | Spear Hill Project, Non-statutory Report: Exploration Report , September to November 1977, DC45/202........... |
| A5601 | 1975 | Esso Australia Ltd | Island Hill | 6.6% | Island Hill, Annual report for period 01/04/1974 to 12/12/1974, MC45/6980-6991 |
| A4796 | 1974 | Cooglegong Tin Pty Ltd | Spear Hill | 6.4% | Spear Hill Project, Non-statutory Report: Assessment Report, February 1967, MC45/615-616, 827-828, 930-935, 98 |
| A4797 | 1974 | Cooglegong Tin Pty Ltd | Spear Hill | 6.4% | Spear Hill Project, Non-statutory Report: Investigations of Alluvial Tin Deposits for the period ending 12th D |
| A4607 | 1974 | Esso Exploration Aust Inc | Island Hill | 6.6% | Island Hill Project, Non-statutory Report:Brief Exploration Progress Report, MC45/6980-6991. |
| A3430 | 1973 | Australian Anglo American Ltd | North Shaw | 9.1% | North Shaw Project, Annual Report for the period ending 31/12/1972, TR70/4725H (Section 2). |
| A18763 | 1973 | Australian Anglo American Ltd | Chocolate Hill - North Shaw | 9.1% | Pilbara Joint Venture, Annual geological report 1972, Volume IV B, Chocolate Hill TR4725H, Part J, North Shaw |
| A18767 | 1973 | Australian Anglo American Ltd | Pilbara - North Shaw & North Pole | 36% | Pilbara Joint Venture, Annual report, Results of exploration of mineral claims during 1972, Volume IV, North P |
| A18806 | 1973 | Australian Anglo American Ltd | North Pole | 9.1% | North Pole Project, Temporary Reserve 4725H , Annual Report 1973. |
| A17200 | 1972 | Australian Anglo American Ltd | Pilbara | 9.1% | Pilbara (JV) Project, Annual Report for the year ending 31/12/1972, TR70/4725. |
| A18760 | 1972 | Australian Anglo American Ltd | North Shaw - Chocolate Hill & Tambourah | 9.1% | Pilbara Joint Venture, Annual report, Results of exploration of the Chocolate Hill and Tambourah Mineral Claim |
| A2976 | 1972 | Placer Prospecting ( Australia) Pty Ltd | Spear Hill | 6.4% | Spear Hill Project, Non-statutory Report: Brief Exploration Report for the period ending 31/12/1970, DC45/378- |
| A9133 | 1972 | Australian Anglo American Ltd | North Pole - Chocolate Hill | 9.1% | North Pole - Chocolate Hill Project, Annual Report , January 1971, TR70/4725H. (Refer to A 2257 for text). |
| A2257 | 1971 | Australian Anglo American Ltd | Chocolate Hill | 9.1% | Chocolate Hill Project,1971 Annual Report , January 1971, TR70/4725H.( A9131 for accompanying Data). |
| A60803 | 1970 | Placer Prospecting Pty Ltd | Spear Hill | 3.6% | Report of Investigation Cooglegong Tin Ltd. Claims Spear Hill, Pilbara Goldfield. 1970 |
| A164 | 1970 | Anglo-American Corporation ( Australia) Limited | Pilbara | 2.1% | Pilbara (JV) Project, Annual (Geologica) Report for theyear ending 31st December 1969, TR70/4714H, 4725H, 4727 |
| A1566 | 1969 | Anglo American Corporation ( Australia) Ltd | North Shaw | 9.1% | North Shaw Project, Non-statutory Report: Geological Map; Sheets 4A-D, Geochemical Stream Sediment Sampling, N |
| A1703 | 1969 | Mr Holland Jr | North Shaw | 39% | North Shaw Project, Non-statutory Report: Minor Exploration Report, January 1969, TR70/3866H. |
| A13076 | 1968 | Us Steel International Inc | Pilbara | <1% | Pilbara Project, Non-statutory Report: Base Metal Prospects of the Pilbara Area, June ,TR70/1515........TR70/4 |
| A79126 | 1753 | Giralia Resources Nl | Daltons | <1% | E45/2186 and 2187 DALTONS PROJECT C71/2003 COMBINED ANNUAL TECHNICAL REPORT FOR THE 12 MONTHS ENDING 29 MARCH |
| A84776 | 1753 | Haoma Mining Nl | NORTH SHAW - HILLSIDE | 29% | NORTH SHAW/ HILLSIDE PROJECT, ANNUAL REPORT FOR THE PERIOD 31 JULY 2008 – 1 AUGUST 2009, E45/2188, E45/2784, E |
| A166 | 1753 | Australian Anglo American Ltd | North Pole gold-nickel-copper exploratio | 9.1% | Pilbara Joint Venture, Choclate Hill, Temprorary Reserve 4275H, Annual Geological Report, 1970 |
| A4583 | 1753 | Australian Anglo American Ltd | North Shaw | 55% | North Shaw Project, Annual Report for the year ending 31/12/1973, MC45/6310-6321, 6397-6404, 6824-6832, 6866-6 |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence Premium
- Time to expiry
- 20 months · 20 Apr 2028
- At-risk & opportunity signals
- Expenditure compliance
- 5-year track record
- Spend trend & exploration intensity
- Expiry band
- Ownership age
- Dealings, mortgages & caveats
- Transfer history
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 45/5231 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 45/5231? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.