L 38/105
L 38/105 is a live miscellaneous licence in the Shire of Laverton, Western Australia, held by Anglogold Ashanti Australia Limited (part of AngloGold Ashanti). Granted on 25 Oct 2006 for 21 years, it expires on 24 Oct 2027. The ground is covered by 118 historical WAMEX reports.
Register summary
- Holder
- Anglogold Ashanti Australia Limited
- Part of
- AngloGold Ashanti
- Local government
- Shire of Laverton
- Application received
- 28 July 2005
- Commenced
- 25 Oct 2006
- Expiry
- 24 Oct 2027
- Term
- 21 Years
The full record on L 38/105
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares (no change of holder on record)
- The full record: 36 conditions and 2 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (13 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A132799 | 2022 | Lodestar Minerals Ltd | Jubilee Well | 1.9% | Annual Report for E38/3054 Jubilee Well for the period ending 12/09/2022 |
| A126029 | 2021 | Gsm Mining Company Pty Ltd | E38/2888 | 3.9% | Compulsory Partial Surrender (40%) of Exploration Licence E38/2888 For the Period 23 January 2015 to 22 Januar |
| A128857 | 2021 | Lodestar Minerals Ltd | Jubilee Well | 1.9% | Annual Exploration Report Jubilee Well E38/03054 for the period ending 12/09/2021 |
| A125157 | 2020 | Anglogold Ashanti Australia Limited | Western Ramps | <1% | EIS Round 20 - Western Ramps (Final Report) |
| A122815 | 2020 | Anglogold Ashanti Australia Limited | Sunrise Dam | 1.1% | Sunrise Dam (C144/1995) Annual Report to the Department of Mines, Industry Regulation and Safety for the perio |
113 more reports
| A123791 | 2020 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period ending 31/3/2020 |
| A124126 | 2020 | Anglogold Ashanti Australia Limited | Pink Lady | <1% | CO-FUNDED EIS REPORT, EIS Round 19 – Pink Lady, Sunrise Dam Gold Mine |
| A124132 | 2020 | Focus Minerals (Laverton) Pty Limited | Carey | 5.7% | Carey C88/2014 Annual Technical Report for the period ending 31/03/2020 |
| A124711 | 2020 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168 Annual Report for the period ending 30/06/2020 |
| A119211 | 2019 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | 1.1% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum for the Period 1 January 2018 to 3 |
| A119796 | 2019 | Oro Del Sur Pty Ltd | Laverton | 1.9% | E38/3054 Annual Technical Report for the period 13 September 2017 to 12 September 2018 |
| A120095 | 2019 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period 1 April 2018 to 31 March 201 |
| A120662 | 2019 | Focus Minerals (Laverton) Pty Limited | Carey | 5.3% | Carey project C88/2014 Annual Technical Report for the period 1 April 2018 to 31 March 2019, E 38/02872,P 38/0 |
| A120929 | 2019 | Gsm Mining Company Pty Ltd | Wallaby | <1% | Wallaby Project C168/2001 Combined Annual Report For the Period 1 July 2018 to 30 June 2019, E38/01935, E38/03 |
| A120368 | 2019 | Anglogold Ashanti Australia Limited | Southern Shear - Sunrise Dam | <1% | EIS Southern Shear Zones – SDGM project (R#17) |
| A115940 | 2018 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3 |
| A116780 | 2018 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton C86/2002 Combined Annual technical Report for the period 01/04/2017 - 31/03/2018 |
| A117034 | 2018 | Focus Minerals (Laverton) Pty Limited | Carey | 5.3% | Carey C88/2014 Annual Technical Report for the period 01/04/2017 - 31/03/2018, E38/02872, P38/04099, P38/04100 |
| A112079 | 2017 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016 |
| A114051 | 2017 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | CENTRAL LAVERTON PROJECT Combined Annual Technical Report (C86/2002) for the period 01 April 2016 – 31 March 2 |
| A114106 | 2017 | Focus Minerals (Laverton) Pty Limited | CAREY | 5.3% | Carey Project C88/2014 Combined Annual Report For the Period 1 April 2016 to 31 March 2017, E38/02872, E38/028 |
| A108971 | 2016 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | C86/2002 CENTRAL LAVERTON PROJECT COMBINED ANNUAL TECHNICAL REPORT FOR THE PERIOD 01/04/2015 TO 31/03/2016 |
| A109072 | 2016 | Focus Minerals (Laverton) Pty Limited | Carey | 5.3% | Carey Project C88/2014 Combined Annual Report for the period 01/04/2015 to 31/03/2016, E38/02872, E38/02873, P |
| A108112 | 2016 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | <1% | Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/ |
| A105466 | 2015 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 01/01/2014 - 31/12/2015, E38/2306.....P39/5063 |
| A107077 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project E38/2297 (Empie) Surrender Report for the period 20/10/2010 to 01/09/2015 |
| A104898 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group | <1% | Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3 |
| A105693 | 2015 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Combined Annual Technical Report for the period 01 April 2014 to 31 March 2015, C86/2002, E38 |
| A101216 | 2014 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201 |
| A101830 | 2014 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project C345/1993 Annual Report for the period 01 January 2013 to 31 December 2013, E38/2306, E39 |
| A102477 | 2014 | Focus Minerals Ltd | Mount Weld | 3.9% | Mt Weld E38/1652 Annual Report for the period 01/09/2013 to 31/03/2014 |
| A96848 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995) |
| A97624 | 2013 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279; |
| A100055 | 2013 | Focus Minerals (Laverton) Pty Ltd | Sunrise | 2.2% | Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545 |
| A92885 | 2012 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995). |
| A95100 | 2012 | Torridon Exploration | Sunrise Dam | 5.3% | Sunrise Dam Project Combined Annual Exploration Report For The Year To 30th June 2012 C42/2011 For Tenements: |
| A96196 | 2012 | Focus Minerals (Laverton) Pty Ltd | Sunrise | 2.2% | Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797 |
| A92958 | 2012 | Rubicon Resources Ltd | Laverton | <1% | Laverton Project Combined Report C86/2010 E38/2221, 2222, 2224, 2267, 2304, 2306 Annual Report 1st Jan 2011 to |
| A89346 | 2011 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010 |
| A89526 | 2011 | Rubicon Resources Ltd | Laverton | <1% | Laverton Project Combined Report C86/2010 2010, Report Period: 1st January 2010 – 31 December 2010 |
| A90565 | 2011 | Crescent Gold Ltd | Childe Harold | 3.9% | Combined Annual Report on Exploration for the period 01/04/2010 to 31/03/2011; Childe Harold Project; C157/200 |
| A91983 | 2011 | Cove Resources Limited | Sunrise Dam | 5.3% | Sunrise Dam Project C42/2011 Combined First Annual Report period ending 30 June 2011 for E38/2155, E38/2272 & |
| A87437 | 2010 | Crescent Gold Ltd | Childe Harold | 3.9% | Combined Annual Report C133/2006 Ffor Leases E38/1652, 1ST April 2009 to 31st March 2010 |
| A88423 | 2010 | Cazaly Resources Ltd | Sunrise Dam | 4.8% | Annual Report Sunrise Dam Project E38/2155 For the Period 14 August 2009 to 13 August 2010 |
| A81076 | 2009 | Anglogold Ashanti Australia Ltd | SUNRISE DAM GROUP | <1% | SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A82274 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | 3.9% | Childe Harold Project, Partial Surrender Report, E38/1652, blocks Kalgoorlie 749 p, u, y, z, and Kalgoorlie 75 |
| A82441 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | 3.9% | CHILDE HAROLD PROJECT Annual Report E38/1652 For the period 01/04/2008 to 31/03/2009, Group Reporting No. C157 |
| A77574 | 2008 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07 |
| A78425 | 2008 | Metex Resources Ltd | Childe Harold | 3.9% | CHILDE HAROLD PARTIAL SURRENDER REPORT E38/1652 blocks KALGOORLIE 0750 g,m,r,w; KALGOORLIE 0822 b,g,h,j,m,n, o |
| A74516 | 2007 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31 |
| A75232 | 2007 | Metex Resources Ltd | Childe Harold | 2.8% | Childe Harold Project, Annual Technical Report for the period 01/04/2006 - 31/03/2007, Group Reporting No C157 |
| A72825 | 2006 | Metex Resources Ltd | Childe Harold | 2.6% | W128 Childe Harold E38/1123,1529,1652,1658,P38/3211-3213, Annual Technical Report for the Period 01/04/2005 to |
| A72951 | 2006 | Crescent Gold Ltd | Jubilee Well | 5.3% | Surrender Report, Jubilee Well JV E38/462, Period 21 January 2005 to 20 January 2006, Surrendered 27 January 2 |
| A70338 | 2005 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M |
| A70566 | 2005 | Anglogold Ashanti Australia Ltd | Laverton | 1.7% | Annual report for the period 01/01/04 - 31/12/04 Laverton Project, C164/2002, E38/199, 399, 420, 462, 523, E38 |
| A70691 | 2005 | Placer Dome Asia Pacific Ltd | Sunrise - Sunset | 7.2% | Sunrise - Sunset Project, Annual Report for the period 1st January 2004 to 31st December 2004, P39/3076, P39/3 |
| A68195 | 2004 | Sons Of Gwalia Ltd | Butcher Well | <1% | Butcher Well Project, Annual Report for the period 01/01/2003 to 31/12/2003 : P38/3083, E39/173, E39/325, E39 |
| A68170 | 2004 | Anglogold Australasia Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/2003-31/12/2003, Sunrise Dam Project (C144/1995), M38/426, M38//427, M39/21 |
| A68313 | 2004 | Anglogold Australia Ltd | Laverton | <1% | Annual Report for the period 01/01/2003-31/12/2003 Laverton Project (C164/2002), E38/1010, E38/1015, E38/1066, |
| A68341 | 2004 | Sons Of Gwalia Ltd | Jubilee Well | 2.6% | Jubilee Well Project Surrender Report for the period 24 Febr uary 1993 to 5 February 2004 C345/1993 E38/449 Re |
| A68435 | 2004 | Placer Dome Asia Pacific Ltd | Sunrise/Sunset | 7.2% | Sunrise/Sunset Project, P39/3076, P39/3090, P39/3091, P39/3238, P39/3294, P39/3240. Mount Margaret Mineral Fii |
| A71952 | 2004 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t |
| A66170 | 2003 | Placer (Granny Smith) Pty Ltd | Sunrise-Sunset | 4.2% | Annual Report on Exploration period ending 30th September 2002 Sunrise-Sunset Project C185/1995: M39/217, P39/ |
| A66180 | 2003 | Anglogold Australia Ltd | Jubilee Well | 4.4% | Annual Report for the period 21 January 2002 to 20 January 2003 ,Jubilee Well JV Project,[C164/2002], E38/462, |
| A66523 | 2003 | Sons Of Gwalia Ltd | Jubilee Well | 2.6% | Annual Report for the period 24 February 2002 - 23 February 2003 Jubilee Well Project C50/1996: E38/449 |
| A66542 | 2003 | Anglogold Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Project, , Annual Report for the period 1 January 2002 to 31 December 2002, M39/347-48, 357, 366, |
| A67737 | 2003 | Anglogold Australia Ltd | Jubilee Well | 4.5% | Jubilee Well JV, E38/462, E38/523, Partial Surrender Report for the period 21/01/1996- 12/11/2003. |
| A64307 | 2002 | Anglogold Australia Ltd | Jubilee Well | 4.4% | Annual Report for the period 21 January 2001 to 20 January 2002 Jubilee Well JV E38/462, E38/523 & E338/524. |
| A64321 | 2002 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | 4.2% | Annual Report on exploration Sunrise-Sunset Project M39/217, P39/3076, 3090-3091, 3119, 3238, 3240, 3294 for t |
| A64488 | 2002 | Anglogold Australia Ltd | Sunrise Dam | <1% | Annual Report For The Period 1 January 2001 to 31 December 2001. Report No: WA 12052. Combined Report No: C144 |
| A62104 | 2001 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | 4.2% | Annual Report on exploration Sunrise/Sunset Project M39/217, P39/3075, 3090-3091, 3119, 3238, 3240, 3294 for t |
| A62476 | 2001 | Sons Of Gwalia Ltd | Jubilee Well | 2.6% | Jubilee Well Project Annual Report For The Period 24 February 1999 - 23 February 2000 Tenement: E38/449. |
| A59851 | 2000 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | 4.2% | Annual Report On Exploration Sunrise-Sunset Project M39/217, P39/3076,3090-3091,3119 For The Period 01/01/1999 |
| A60182 | 2000 | Acacia Resources Ltd | Jubilee Well | 4.4% | Jubilee Well J.V; E38/462, E38/523 and E38/524; Annual report for the period 21/01/1999 to 20/01/2000 |
| A60321 | 2000 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project, M39/347-348,357,366,373-376, M38/426, Annual Report for the Period 1/1/1999 to 31/12/1999 |
| A61954 | 2000 | Anglogold Australasia Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, M39/348, M39/357, M39/366, M39/373, M39/375, M39/376, M39/426 & M39/374 Verificat |
| A62054 | 2000 | Anglogold Australasia Ltd | Jubilee Well | 4.4% | Jubilee Well Project E38/462, E38/523 and E38/524 Verification Report, Annual Report for the period 21 January |
| A57593 | 1999 | Acacia Resources Ltd | Jubilee Well | 4.4% | Acacia Resources Ltd Aurora Gold W.A Ltd Jubilee Well J.V E38/462,523.524 Annual Report For the Period 21/01/1 |
| A58027 | 1999 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | 4.2% | Sunrise - Sunset Project, Annual Report for the period 1st Janaury 1998 to 31st December 1998, M39/217; P39/ |
| A59057 | 1999 | Sons Of Gwalia Ltd | Jubilee Well | 2.6% | Jubilee Well JV Project (formerly Sunrise Dam JV Project) Annual report for the period 24/02/98-23/02/99, E38/ |
| A53829 | 1998 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, 348, 357, 366, 373-376, M38/426 Annual Report - Period Ending: 31/12/1997 |
| A54452 | 1998 | Placer (Granny Smith) Pty Ltd | Sunset | 4.2% | Sunrise/Sunset Project, Mt Margaret Goldfield, W.A. 01/01/97 - 31/12/97 M39/217, P39/3076, 3090-3091, 3119, 32 |
| A56263 | 1998 | Sons Of Gwalia Ltd | Sunrise Dam | 1.7% | Sunrise Dam JV Project Annual report for the period 24/02/97-23/02/98 E38/449 E39/421. |
| A57146 | 1998 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347, 348, 366, 372, 374, 375, 376, M38/426 Annual Report for the period ending 31/12/9 |
| A50186 | 1997 | Acacia Resources Ltd | Brumby Well | 4.4% | Jubilee Well Joint Venture E38/462 E38/523 and E38/524 Annual report for the period 21/01/96 to 20/01/97 Repor |
| A50393 | 1997 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project M39/347 M39/348 M39/357 M39/366 M39/373` M39/374 M39/375 M39/376 and M38/426 annual report |
| A50913 | 1997 | Placer (Granny Smith) Pty Ltd | Sunset | 4.2% | Annual report on Exploration Sunrise/ Sunset Project M39/217 P39/3076 P39/3090 to P39/3091 P39/3119 P39/3238 P |
| A51563 | 1997 | Sons Of Gwalia Ltd | Sunrise Dam | 1.7% | Sunrise Dam Joint Venture Annual report for the year ending 23rd February 1997 Tenements E38/449 E39/421. |
| A53166 | 1997 | Acacia Resources Ltd | Brumby Well | 4.4% | Jubilee Well J.V. E38/462, 523, 524 Laverton, North-Eastern Goldfields, Yilgarn W.A. Annual Report, 21/01/97 |
| A46846 | 1996 | Gasgoyne Gold Mines Nl | Sunrise Dam North | 1.7% | Sunrise Dam North E38/449 and Sunrise Dam West E39/421 Annual Report for the year to 23 February 1996 |
| A47061 | 1996 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Project E39/174 E39/206 E39/263 E39/229 and P38/2587 Annual report for the period ending 31 Decemb |
| A47216 | 1996 | Aurora Gold Ltd | Brumby Well | 4.4% | H468 Brumby Well Project Western Australia Annual Technical Report for the period 21 January 1995 to 20 Januar |
| A47500 | 1996 | Placer Prospecting Pty Ltd | Sunrise/Sunset | 4.2% | Second Annual report on Exploration Sunrise/Sunset Project M39/217 P39/3076 P39/3090 P39/3091 P39/3238 P39/324 |
| A44129 | 1995 | Gasgoyne Gold Mines Nl | Sunrise Dam North | 2.6% | Sunrise Dam North Project E38/449 Annual Report for the year to 23 February 1995 |
| A44189 | 1995 | Aurora Gold Ltd | Brumby Well | 4.4% | Annual Techincal Report Brumby Well Project Western Australia Exploraton Licences 38/462,38/523 and 38/524 For |
| A44303 | 1995 | Acacia Resources Ltd | Sunrise Dam | <1% | Sunrise Dam Group, Annual Report for the period 1 January to 31st December 1994. E39/174, 206, 229, 263 and P3 |
| A46533 | 1995 | Gasgoyne Gold Mines Nl | Sunrise Dam North east | 5.3% | Sunrise Dam North East P38/2590 to P38/2592 Annual report for the year ending 16 August 1995 |
| A40299 | 1994 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/93-31/12/93 Sunrise Dam Project E39/174,206,229,263 |
| A42348 | 1994 | Placer Exploration Ltd | Sunrise | <1% | Annual report on exploration Sunrise M39/217 Mt Margaret Goldfield, WA For the year period 14/02/93 to 30/06/9 |
| A41168 | 1994 | Gasgoyne Gold Mines Nl | Sunrise Dam North | 2.6% | Annual Report for the Sunrise Dam North Prospect E38/449 ,for the period 01/02/1993 to 10/02/1994. |
| A41227 | 1994 | Aurora Gold Ltd | Brumby Well | 4.4% | Annual Technical Report Period: 21/01/93 to 21/01/94 Brumby Well Project E38/462, 38/523, 38/524 |
| A42103 | 1994 | Placer Exploration Ltd | Sunset | 5.9% | Annual Report for the period 06/93-06/94 Sunset Project P39/3090-91,3238-40,3076,& 3119 |
| A38820 | 1993 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual Report for the period 01/01/92-31/12/92 Sunrise Dam Project E39/174,206,229,263 |
| A39397 | 1993 | Delta Gold Ltd | Sunrise | <1% | Annual Report for the period 14/02/92-13/02/93 Sunrise Project M39/217 |
| A40013 | 1993 | Billiton Australia Pty Ltd | Sunrise West | <1% | Partial surrender report Sunrise West, E39/263 |
| A35400 | 1992 | Poseidon Exploration Ltd | Mount Weld | 2.7% | Mount Weld Project, Annual Report for the year ending 31/12/1991, E38/163. |
| A36624 | 1992 | Delta Gold Ltd | Sunrise Dam | <1% | Annual report (for the period 02/91-02/92) Sunrise Dam M39/217 July 1992 |
| A35603 | 1992 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report for 1 January 1991 to 31 December 1991 Sunrise Dam Project E39/174 E39/206 E39/229 E39/230 E39/2 |
| A32915 | 1991 | Poseidon Ltd | Mount Weld | 2.7% | Mt Weld Project, Annual Report for the year ending 31/12/1990, E38/163. |
| A33010 | 1991 | Billiton Australia Pty Ltd | Sunrise Dam | <1% | Annual report for 30 June 1989 to 31 December 1990 Sunrise Dam Project E39/174 E39/206 E39/227 E39/229 E39/230 |
| A33396 | 1991 | Poseidon Ltd | Mount Weld | 2.7% | Mount Weld Project,1990 Partial Surrender Report, February 1991, E38/163. |
| A33983 | 1991 | Delta Gold Ltd | Sunrise Dam | <1% | Sunrise Dam M39/217 Annual Report for 1990 Project No:374 |
| A30632 | 1990 | Poseidon Ltd | Mount Weld | 2.7% | Annual report 1989. Mt. Weld Project. E38/163. Laverton Sh51-2 |
| A30847 | 1990 | Freeport Of Australia Inc | Mount Weld | 2.7% | Mt Weld Project, Annual report, 1988. E38/163 |
| A9273 | 1973 | Us Steel International Inc | Ghost Rock | <1% | Ghost Rock Project, Non-statutory Report: 1972 Final Report, March 1973, MC29/1555-1560,1842, 2334-2335, 2337- |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A85886 | 1753 | Anglogold Ashanti Australia Ltd | Sunrise Dam | <1% | Sunrise Dam Group M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over L 38/105 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold L 38/105? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.