M 39/1116
M 39/1116 is a live mining lease in the Shire of Laverton, Western Australia, held by Anglogold Ashanti Australia Limited (part of AngloGold Ashanti). Granted on 19 July 2017 for 21 years, it expires on 18 July 2038. The ground is covered by 253 historical WAMEX reports.
Register summary
- Holder
- Anglogold Ashanti Australia Limited
- Part of
- AngloGold Ashanti
- Local government
- Shire of Laverton, Shire of Leonora
- Application received
- 31 Mar 2017
- Commenced
- 19 July 2017
- Expiry
- 18 July 2038
- Term
- 21 Years
The full record on M 39/1116
The register summary says who holds it today. The rest of the record says how they came to, what is attached to it, and whether it is being worked.
- Current holders and their shares (no change of holder on record)
- The full record: 11 years of expenditure, 64 conditions and 13 endorsements
- Native title context, combined reporting and rent status
- At-risk and opportunity signals, and expenditure compliance over five years
- Every register dealing (9 on record), with mortgages, caveats and transfers flagged
- Expiry band, and how long the holder has had it
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A144249 | 2024 | Catalina Resources Ltd | Laverton | <1% | Final Report P38/4554 Laverton Project for the period ending 07/08/2024 |
| A139166 | 2024 | Catalina Resources Ltd | Laverton | <1% | Annual Report P38/4554 Laverton for the period ending 22/02/2024 |
| A129997 | 2022 | Matsa Gold Pty Ltd | Hacks Well | <1% | E38/2945 Hacks Well Report on Areas Relinquished 9th December 2021 |
| A130798 | 2022 | Matsa Gold Pty Ltd | Lake Carey | 3.1% | E39/1889 Partial Surrender Report Lake Carey for the period ending 07/03/2022. |
| A132799 | 2022 | Lodestar Minerals Ltd | Jubilee Well | 1.6% | Annual Report for E38/3054 Jubilee Well for the period ending 12/09/2022 |
245 more reports with detail
| A126029 | 2021 | Gsm Mining Company Pty Ltd | E38/2888 | <1% | Compulsory Partial Surrender (40%) of Exploration Licence E38/2888 For the Period 23 January 2015 to 22 Januar |
| A126493 | 2021 | Gswa | <1% | Core Library Sampling K1127 | |
| A128857 | 2021 | Lodestar Minerals Ltd | Jubilee Well | 1.6% | Annual Exploration Report Jubilee Well E38/03054 for the period ending 12/09/2021 |
| A124953 | 2020 | Focus Minerals (Laverton) Pty Limited | Lake Carey | <1% | Lake Carey Regional Diamond Drilling (R20) |
| A122816 | 2020 | Anglogold Ashanti Australia Limited | Butcher Well | <1% | Butcher Well (C8/2016) Annual Group Report for the period ending 31/12/2019 |
| A125157 | 2020 | Anglogold Ashanti Australia Limited | Western Ramps | 100% | EIS Round 20 - Western Ramps (Final Report) |
| A122815 | 2020 | Anglogold Ashanti Australia Limited | Sunrise Dam | 63% | Sunrise Dam (C144/1995) Annual Report to the Department of Mines, Industry Regulation and Safety for the perio |
| A122827 | 2020 | Matsa Resources Limited | Red October | 1.9% | Red October Group Annual Report C173/2017 for the period ending 31/12/2019 |
| A123791 | 2020 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period ending 31/3/2020 |
| A124126 | 2020 | Anglogold Ashanti Australia Limited | Pink Lady | 100% | CO-FUNDED EIS REPORT, EIS Round 19 – Pink Lady, Sunrise Dam Gold Mine |
| A124132 | 2020 | Focus Minerals (Laverton) Pty Limited | Carey | <1% | Carey C88/2014 Annual Technical Report for the period ending 31/03/2020 |
| A124711 | 2020 | Gsm Mining Company Pty Ltd | Wallaby | 2.1% | Wallaby Project C168 Annual Report for the period ending 30/06/2020 |
| A118830 | 2019 | Matsa Gold Pty Ltd | Hack Well | <1% | Annual Mineral Exploration Report E38/2945 Hack Well for the period 14 December 2017 to 13 December 2018 |
| A119199 | 2019 | Anglogold Ashanti Australia Limited | Butcher Well | <1% | Butcher Well (C8/2016) Annual Report for the period 1 January 2018 to 31 December 2018 |
| A119211 | 2019 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | 63% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum for the Period 1 January 2018 to 3 |
| A119510 | 2019 | Matsa Resources Limited | Red October | 1.8% | Annual Report on Exploration Carried out over Red October Project (C173/2017) for period to 1st March 2019 |
| A119796 | 2019 | Oro Del Sur Pty Ltd | Laverton | 1.6% | E38/3054 Annual Technical Report for the period 13 September 2017 to 12 September 2018 |
| A120095 | 2019 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Project C86/2002 Combined Annual Technical Report for the period 1 April 2018 to 31 March 201 |
| A120662 | 2019 | Focus Minerals (Laverton) Pty Limited | Carey | <1% | Carey project C88/2014 Annual Technical Report for the period 1 April 2018 to 31 March 2019, E 38/02872,P 38/0 |
| A120929 | 2019 | Gsm Mining Company Pty Ltd | Wallaby | 2.1% | Wallaby Project C168/2001 Combined Annual Report For the Period 1 July 2018 to 30 June 2019, E38/01935, E38/03 |
| A120368 | 2019 | Anglogold Ashanti Australia Limited | Southern Shear - Sunrise Dam | 100% | EIS Southern Shear Zones – SDGM project (R#17) |
| A115637 | 2018 | Australian Potash Limited | Hack Well | <1% | ANNUAL REPORT HACK WELL PROJECT E38/02945 FOR THE PERIOD 14/12/2016 - 13/12/2017 |
| A115940 | 2018 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | 13% | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3 |
| A115966 | 2018 | Anglogold Ashanti Australia Limited | Butcher Well | <1% | Butcher Well (C8/2016) Group Report to the Department of Mines, Industry Regulation and Safety For the Period |
| A116266 | 2018 | Matsa Gold Pty Ltd | Lake Carey | 1.2% | Lake Carey Project C5/2003 Annual Report for the period 01/01/2017 - 31/12/2017 |
| A116780 | 2018 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton C86/2002 Combined Annual technical Report for the period 01/04/2017 - 31/03/2018 |
| A117034 | 2018 | Focus Minerals (Laverton) Pty Limited | Carey | <1% | Carey C88/2014 Annual Technical Report for the period 01/04/2017 - 31/03/2018, E38/02872, P38/04099, P38/04100 |
| A117575 | 2018 | Gsm Mining Company Pty Ltd | Wallaby | 2.4% | WALLABY PROJECT COMBINED ANNUAL TECHNICAL REPORT, C168/2001, 01 JULY 2017 - 30 JUNE 2018 |
| A114580 | 2017 | Gsm Mining Company Pty Ltd | Wallaby | 2.4% | Wallaby Project C168/2001 Combined Annual Technical Report for the period 1 July 2016 to 30 June 2017, E38/012 |
| A112076 | 2017 | Australian Potash Limited | Hack Well | <1% | Hack Well Project E38/2945 Annual Report for the period 14/12/2015 to 13/12/2016 |
| A112079 | 2017 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | 17% | Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016 |
| A112275 | 2017 | Matsa Resources Limited | Lake Carey | <1% | Lake Carey Project C05/2003 Annual Report for the period 1 January 2015 to 31 December 2016, E39/01287.....E39 |
| A112355 | 2017 | Saracen Gold Mines Pty Ltd; Anglogold Ashanti Australia Limi | Butcher Well | <1% | Butcher Well Project (C8/2016) – Volume I Annual Report for the Period 1 January to 31 December 2016, E38/0312 |
| A112650 | 2017 | Sammy Resources Pty Ltd | Mount Weld | 4.7% | Mt Weld E39/1837 Annual Report for the period 5 February 2016 to 4 February 2017 |
| A114051 | 2017 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | CENTRAL LAVERTON PROJECT Combined Annual Technical Report (C86/2002) for the period 01 April 2016 – 31 March 2 |
| A112519 | 2017 | Legendre B | WILGA DAM | 7.8% | Wilga Dam E39/01796 Annual Report for the period 23 February 2016 to 22 February 2017 |
| A114106 | 2017 | Focus Minerals (Laverton) Pty Limited | CAREY | <1% | Carey Project C88/2014 Combined Annual Report For the Period 1 April 2016 to 31 March 2017, E38/02872, E38/028 |
| A108576 | 2016 | Legendre B | Wilga Dam | 7.8% | Annual Report For the period 23 February 2015 to 22 February 2016 Wilga Dam Project E39/1796 |
| A108971 | 2016 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | C86/2002 CENTRAL LAVERTON PROJECT COMBINED ANNUAL TECHNICAL REPORT FOR THE PERIOD 01/04/2015 TO 31/03/2016 |
| A109072 | 2016 | Focus Minerals (Laverton) Pty Limited | Carey | <1% | Carey Project C88/2014 Combined Annual Report for the period 01/04/2015 to 31/03/2016, E38/02872, E38/02873, P |
| A109737 | 2016 | Gsm Mining Company Pty Ltd | Wallaby | 2.4% | WALLABY PROJECT COMBINED ANNUAL TECHNICAL REPORT (C168/2001) FOR THE PERIOD 01 JULY 2015 – 30 JUNE 2015 |
| A108112 | 2016 | Anglogold Ashanti Australia Limited | Sunrise Dam Group | 19% | Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/ |
| A108161 | 2016 | Saracen Gold Mines Pty Ltd | Butcher Well - Mount Minnie- Mount Flore | <1% | VOL 1 - Butcher Well Project (C345/1993) Annual Report for the Period 1 January 2015 to the 31 December 2015, |
| A105466 | 2015 | Saracen Gold Mines Pty Ltd | Butcher Well | 3.3% | Butcher Well Project C345/1993 Annual Report for the period 01/01/2014 - 31/12/2015, E38/2306.....P39/5063 |
| A105986 | 2015 | Focus Minerals (Laverton) Pty Ltd | Carey | <1% | Carey Project C88/2014 Combined Annual Report for the period 1 April 2014 to 31 March 2015, E38/2872, P38/4099 |
| A107077 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 47% | Sunrise Dam Project E38/2297 (Empie) Surrender Report for the period 20/10/2010 to 01/09/2015 |
| A104859 | 2015 | Saracen Gold Mines Pty Ltd | Butcher Well | 2.3% | Butcher Well Partial Surrender Report E39/1279 for the period 18/09/2008 to 17/09/2014 |
| A104898 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group | 23% | Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3 |
| A105693 | 2015 | Gsm Mining Company Pty Ltd | Central Laverton | <1% | Central Laverton Combined Annual Technical Report for the period 01 April 2014 to 31 March 2015, C86/2002, E38 |
| A106502 | 2015 | Gsm Mining Company Pty Ltd | Wallaby | 2.4% | Wallaby Project C168/2001 Annual Report for the period 1 July 2014 to 30 June 2015, E38/01211, E38/01935, E39/ |
| A100990 | 2014 | Gsm Mining Company Pty Ltd | Barnicoat | <1% | Barnicoat Project, Annual Report for the period 01/01/2013 to 31/12/2013, M38/361-362, 483-484; E38/2029 & 203 |
| A101216 | 2014 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 23% | Sunrise Dam Group Combined Report No: C144/1995 Annual Report for the period 1 January 2013 to 31 December 201 |
| A101830 | 2014 | Saracen Gold Mines Pty Ltd | Butcher Well | 3.3% | Butcher Well Project C345/1993 Annual Report for the period 01 January 2013 to 31 December 2013, E38/2306, E39 |
| A102477 | 2014 | Focus Minerals Ltd | Mount Weld | <1% | Mt Weld E38/1652 Annual Report for the period 01/09/2013 to 31/03/2014 |
| A102837 | 2014 | Gsm Mining Company Pty Ltd | Barnicoat | <1% | Barnicoat Project, Final Surrender Report for the period 08/10/2008 to 29/04/2014, E38/2029 & 2035. [C388/1993 |
| A103165 | 2014 | Gsm Mining Company Pty Ltd | Wallaby | 2.4% | Wallaby Project Combined Annual Technical Report (C168/2001) for the period 1 July 2013 to 30 June 2014, P38/3 |
| A104282 | 2014 | Gianni, Pr | Wilga Well | 3.6% | Wilga Well Project, Annual Report for the period 10/10/2013 to 09/10/2014, E39/1664. |
| A104813 | 2014 | Gianni, Pr | Wilga Well | 3.6% | Wilga Well Annual Exploration Report for E39/1664 from 10/10/2013 to 9/10/2014 |
| A103028 | 2014 | Gsm Mining Company Pty Ltd | Wallaby | 2.8% | Wallaby Project, Partial Surrender Report for the period 29/05/2008 to 28/05/2014, E38/1935; E39/1260. [C168/2 |
| A96848 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 12% | Sunrise Dam Group Annual Report for the period 1 January 2012 to 31 December 2012 (C144/1995) |
| A97044 | 2013 | Barrick (Granny Smith) Pty Ltd | Barnicoat | <1% | Barnicoat Project, Final Surrender Report for the 16th January 2009 to 14th January 2013, P39/4806. [C388/199 |
| A97624 | 2013 | Saracen Gold Mines Pty Ltd | Butcher Well | 3.3% | Butcher Well Project, Annual Report for the period 1st January 2012 to 31st December 2012, E38/2306; E39/1279; |
| A99227 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group | 1.4% | Sunrise Dam Group Surrender Report for E38/2220 for the period 16/07/2010 to 24/07/2013 |
| A100055 | 2013 | Focus Minerals (Laverton) Pty Ltd | Sunrise | 1.3% | Sunrise Project, C320/2011 Combined Annual Report 1/09/2012 to 31/08/2013, Licences: E38/1652, M39/0520, 545 |
| A100810 | 2013 | Gianni, Pr | Wilga Well | 3.6% | Wilga Well Project, Annual Report for the period 10/10/2012 to 09/10/2013, E39/1664. |
| A96870 | 2013 | Barrick (Granny Smith) Pty Ltd | Barnicoat | <1% | PROJECT 8362 BARNICOAT PROJECT M38/361, M38/362, M38/483, M38/484 E38/2029, E38/2035 P39/4806 ANNUAL REPORT Pe |
| A99045 | 2013 | Barrick (Australia Pacific) Ltd | Wallaby | 2.4% | Wallaby Project Annual Report for the period 1 July 2012 – 30 June 2013, P38/3666.......M38/1137 |
| A92690 | 2012 | Crescent Gold Ltd | Sunrise | <1% | Interim Combined Annual Report on Exploration for the period 01/09/2010 to 31/08/2011; Sunrise Project; C320/2 |
| A92879 | 2012 | Barrick (Granny Smith) Pty Ltd | Barnicoat | <1% | Barnicoat Project, Annual Report for the period 1st January 2011 to 31st December 2011, M38/361-362, 483-484; |
| A92885 | 2012 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 11% | Sunrise Dam Project, Annual Report for the period 1st January 2011 to 31st December 2011 (C144/1995). |
| A96048 | 2012 | White Cliff Minerals Limited | Sunrise West | <1% | Sunrise West Project P38/3885 - ANNUAL REPORT For the year ending 23rd August 2012 |
| A96049 | 2012 | White Cliff Minerals Limited | Sunrise West | <1% | Sunrise West Project, P38/3886 - ANNUAL REPORT For the year ending 23rd August 2012 |
| A96196 | 2012 | Focus Minerals (Laverton) Pty Ltd | Sunrise | 1.3% | Sunrise Project, Annual Report for the period 01/09/2011 to 31/08/2012, E38//1652; M39/520.......951; P39/4797 |
| A92958 | 2012 | Rubicon Resources Ltd | Laverton | 4.3% | Laverton Project Combined Report C86/2010 E38/2221, 2222, 2224, 2267, 2304, 2306 Annual Report 1st Jan 2011 to |
| A93583 | 2012 | Saracen Gold Mines Pty Ltd | Butcher Well | 1.2% | Butcher Well Project C345/1993 Annual Report for the period 1 January 2011 to 31 December 2011 |
| A94717 | 2012 | Barrick (Granny Smith) Pty Ltd | Wallaby | 2.4% | PROJECT 8855 WALLABY PROJECT P38/3666, P39/4976 E38/1211, E38/1935, E39/1260 M38/560, M38/593, M38/690, M38/69 |
| A90051 | 2011 | Crescent Gold Ltd | Wilga Dam | <1% | Combined Annual Report on Exploration for the period 01/01/2010 to 31/12/2010; Wilga Dam Project; C118/2009 |
| A89346 | 2011 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 17% | Sunrise Dam Group C144/1995 Annual Report for the Period 1 January 2010 to 31 December 2010 |
| A89375 | 2011 | Barrick (Granny Smith) Pty Ltd | Barnicoat | <1% | Project 8362 BARNICOAT PROJECT P39/4806 E38/2029, E38/2035 8/361, M38/362, M38/483, M38/484 Annual Report Peri |
| A89526 | 2011 | Rubicon Resources Ltd | Laverton | 4.3% | Laverton Project Combined Report C86/2010 2010, Report Period: 1st January 2010 – 31 December 2010 |
| A90565 | 2011 | Crescent Gold Ltd | Childe Harold | <1% | Combined Annual Report on Exploration for the period 01/04/2010 to 31/03/2011; Childe Harold Project; C157/200 |
| A91080 | 2011 | Barrick (Granny Smith) Pty Ltd | Wallaby | 2.4% | PROJECT 8855 WALLABY PROJECT ANNUAL REPORT Period 1 July 2010 – 30 June 2011 TECHNICAL REPORT No. 1437 GSWA Re |
| A89855 | 2011 | Saracen Gold Mines Pty Ltd | Butcher Well | 1.2% | Butcher Well Project Annual Report for the period 01 January 2010 to December 2010 |
| A85813 | 2010 | Barrick (Australia Pacific) Ltd | Barnicoat | <1% | Project 8362 Barnicoat Project P39/4806 E38/2029, E38/2035 M38/361, M38/362, M38/483, M38/484 Annual Report pe |
| A87437 | 2010 | Crescent Gold Ltd | Childe Harold | <1% | Combined Annual Report C133/2006 Ffor Leases E38/1652, 1ST April 2009 to 31st March 2010 |
| A88001 | 2010 | Barrick Gold Of Australia Ltd | LAKE CAREY | 4.6% | PROJECT 8010 LAKE CAREY PROJECT Darkstar drilling project 2009/A E39/1260 Department of Mines and Petroleum Co |
| A86442 | 2010 | Saracen Gold Mines Pty Ltd | Butcher Well | 1% | BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2009 TO 31 DECEMBER 2009 (C345/1993) |
| A86622 | 2010 | Barrick (Australia Pacific) Ltd | Wilga Dam | <1% | Wilga Dam Project P39/4797, M39/664, M39/742, M39/743, M39/862, M39/904, M39/951, Annual Report Period 1 Janua |
| A87654 | 2010 | Barrick (Australia Pacific) Ltd | Lake Carey | 2.8% | Project 8010 Lake Carey Project E38/1211, E38/1935, E39/1260 P39/4976, Annual Report, Period 1 July 2009 – 30 |
| A81076 | 2009 | Anglogold Ashanti Australia Ltd | SUNRISE DAM GROUP | 70% | SUNRISE DAM GROUP M38/426, M38/427, M38/431, M38/260, M39/217, M39/347, M39/348, M39/357, M39/358, M39/359, M3 |
| A82274 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | <1% | Childe Harold Project, Partial Surrender Report, E38/1652, blocks Kalgoorlie 749 p, u, y, z, and Kalgoorlie 75 |
| A82441 | 2009 | Carbon Energy Ltd | CHILDE HAROLD | <1% | CHILDE HAROLD PROJECT Annual Report E38/1652 For the period 01/04/2008 to 31/03/2009, Group Reporting No. C157 |
| A84116 | 2009 | Barrick (Granny Smith) Pty Ltd | Lake Carey | 2.7% | LAKE CAREY PROJECT E38/1211, E38/1935, E39/1260, M38/675, M38/677 ANNUAL REPORT PERIOD 1 JUL 2008 – 30 JUN 200 |
| A77574 | 2008 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 71% | SUNRISE DAM GROUP C144/1995 Annual Report for the Period 1 Jan 2007 to 31 Dec 2007 Report No.WA13338_SD07 |
| A78902 | 2008 | Jindalee Resources Ltd | Jubilee Well | <1% | Jubilee Well Project E38/1730 SURRENDER REPORT Report. Period 11/08/2006 - 12/06/2008 E38_1730_2008S |
| A79308 | 2008 | Barrick (Granny Smith) Pty Ltd | Lake Carey | 2.4% | Project 8010 Lake Carey Project E38/1211, E38/1935, E39/1260, M38/675, M38/677 Annual Report Period 1 July 200 |
| A78034 | 2008 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | BUTCHER WELL PROJECT ANNUAL REPORT 01 JANUARY 2007 TO 31 DECEMBER 2007 CR GROUP: C345/1993 TENEMENTS: E38/1678 |
| A78425 | 2008 | Metex Resources Ltd | Childe Harold | <1% | CHILDE HAROLD PARTIAL SURRENDER REPORT E38/1652 blocks KALGOORLIE 0750 g,m,r,w; KALGOORLIE 0822 b,g,h,j,m,n, o |
| A75083 | 2007 | Saracen Gold Mines Pty Ltd | Butcher Well | <1% | Butcher'S Well Project, Annual Report, 01 January 2006 to 31 December 2006. (C345/1993) |
| A76156 | 2007 | Jindalee Resources Ltd | Burtville | <1% | Burtville Annual Report 2007 11/08/2006 to 11/08/2007 E38/1730 |
| A74516 | 2007 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 71% | Sunrise Dam Group, M38/426,...M38/260, P39/2985 and P39/2986 Annual Report for the Period 1 January 2006 to 31 |
| A75232 | 2007 | Metex Resources Ltd | Childe Harold | <1% | Childe Harold Project, Annual Technical Report for the period 01/04/2006 - 31/03/2007, Group Reporting No C157 |
| A72814 | 2006 | Barrick (Granny Smith) Pty Ltd | Wilga Dam | 15% | Wilga Dam Project E39/786, Annual Exploration Report for the Period 1 July 2005 to 30 June 2006, C314/1995, ( |
| A72825 | 2006 | Metex Resources Ltd | Childe Harold | <1% | W128 Childe Harold E38/1123,1529,1652,1658,P38/3211-3213, Annual Technical Report for the Period 01/04/2005 to |
| A72951 | 2006 | Crescent Gold Ltd | Jubilee Well | <1% | Surrender Report, Jubilee Well JV E38/462, Period 21 January 2005 to 20 January 2006, Surrendered 27 January 2 |
| A72164 | 2006 | Placer (Granny Smith) Pty Ltd | Barnicoat | 1.2% | Barnicoat Project, E38/494,M38/361,362,483, P39/3239,3291-3293, Mount Margaret Mineral Field, Annual Explorati |
| A73489 | 2006 | Barrick (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447-448,E39/387,389,M38/675,677, Annual Exploration Report for the Period 1 July 2005 t |
| A69663 | 2005 | Sons Of Gwalia Ltd | Butcher Well | <1% | Annual report for the period 01/01/04 - 31/12/04 Butcher Well Project, C345/1993, P38/3083, P39/3939, E38/449 |
| A70338 | 2005 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 71% | Annual report for the period 01/01/04 - 31/12/04 Sunrise Dam Project, C144/1995, M38/426, 427, 431, M39/217, M |
| A70566 | 2005 | Anglogold Ashanti Australia Ltd | Laverton | <1% | Annual report for the period 01/01/04 - 31/12/04 Laverton Project, C164/2002, E38/199, 399, 420, 462, 523, E38 |
| A70688 | 2005 | Placer Dome Asia Pacific Ltd | Barnicoat | 1.2% | Barnicoat Project, M38/361, M38/362, M38/483, E38/494, P39/3239, P39/3291, P39/3292, P39/3293, Mount Margaret |
| A70691 | 2005 | Placer Dome Asia Pacific Ltd | Sunrise - Sunset | 24% | Sunrise - Sunset Project, Annual Report for the period 1st January 2004 to 31st December 2004, P39/3076, P39/3 |
| A71318 | 2005 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project, E38/447,E38/448,E39/387,E39/389,M38/675, M38/677, Mount Margaret Mineral Field Western Aus |
| A71360 | 2005 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 15% | Wilga Dam Project, E39/347 & E39/786, Mount Margaret Mineral Field Western Australia, Annual Exploration Repor |
| A68195 | 2004 | Sons Of Gwalia Ltd | Butcher Well | 1.6% | Butcher Well Project, Annual Report for the period 01/01/2003 to 31/12/2003 : P38/3083, E39/173, E39/325, E39 |
| A68170 | 2004 | Anglogold Australasia Ltd | Sunrise Dam | 76% | Annual Report for the period 01/01/2003-31/12/2003, Sunrise Dam Project (C144/1995), M38/426, M38//427, M39/21 |
| A68271 | 2004 | Placer (Granny Smith) Pty Ltd | Barnicoat | 1.2% | Barnicoat Project, Annual Exploration Report M38/361-362, M38/ 483; E38/494; P39/3239, P39/ 3291-3293 for the |
| A68313 | 2004 | Anglogold Australia Ltd | Laverton | <1% | Annual Report for the period 01/01/2003-31/12/2003 Laverton Project (C164/2002), E38/1010, E38/1015, E38/1066, |
| A68341 | 2004 | Sons Of Gwalia Ltd | Jubilee Well | 27% | Jubilee Well Project Surrender Report for the period 24 Febr uary 1993 to 5 February 2004 C345/1993 E38/449 Re |
| A68435 | 2004 | Placer Dome Asia Pacific Ltd | Sunrise/Sunset | 24% | Sunrise/Sunset Project, P39/3076, P39/3090, P39/3091, P39/3238, P39/3294, P39/3240. Mount Margaret Mineral Fii |
| A69089 | 2004 | Placer Dome Asia Pacific Ltd | Lake Carey | <1% | Lake Carey Project, Annual exploration report for the period 1st July 2003 to 30th June 2004 |
| A69923 | 2004 | Placer Dome Asia Pacific Ltd | Wilga Dam | 15% | Wilga Dam Project, Annual exploration report for the period 1st July 2003 to 30th June 2004 X32, C314/1995, E3 |
| A71952 | 2004 | Anglogold Ashanti Australia Ltd | Sunrise Dam | 71% | Sunrise Dam Group, M38/426-427,431,M39/217,347-348,357-359, M39/366,373-376,P39/2985-2986, Annual Report for t |
| A65868 | 2003 | Sons Of Gwalia Ltd | Wilga Well | <1% | Annual Report for the period 25/11/01-24/11/02 Wilga Well Tenement: E39/327 Report No: 0450-2003-01 |
| A65899 | 2003 | Placer (Granny Smith) Pty Ltd | Barnicoat | 1.2% | Combined Annual Mineral Exploration Report for the period 1 January 2002 to 31 December 2002 Barnicoat Project |
| A66170 | 2003 | Placer (Granny Smith) Pty Ltd | Sunrise-Sunset | 55% | Annual Report on Exploration period ending 30th September 2002 Sunrise-Sunset Project C185/1995: M39/217, P39/ |
| A66180 | 2003 | Anglogold Australia Ltd | Jubilee Well | <1% | Annual Report for the period 21 January 2002 to 20 January 2003 ,Jubilee Well JV Project,[C164/2002], E38/462, |
| A66523 | 2003 | Sons Of Gwalia Ltd | Jubilee Well | 27% | Annual Report for the period 24 February 2002 - 23 February 2003 Jubilee Well Project C50/1996: E38/449 |
| A66542 | 2003 | Anglogold Australia Ltd | Sunrise Dam | 99% | Sunrise Dam Project, , Annual Report for the period 1 January 2002 to 31 December 2002, M39/347-48, 357, 366, |
| A66976 | 2003 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 15% | Wilga Dam Project, E39/786, Mount Margaret Mineral Field,Western Australia, Partial Surrender Report for the |
| A67211 | 2003 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 15% | Wilga Dam Project, E39/347,786, Mount Margaret Mineral Field, Western Australia Annual Exploration Report for |
| A67248 | 2003 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Annual Exploration Report for the period 1 July 2002 to 30 June 2003 Lake Carey Project C401/1996: E38/447,448 |
| A67535 | 2003 | Sons Of Gwalia Ltd | Wilga Well West | 4.8% | Annual Report for the period 12 October 2002 to 11 October 2003 Wilga Well West JV Project E39/378 Report No. |
| A67737 | 2003 | Anglogold Australia Ltd | Jubilee Well | <1% | Jubilee Well JV, E38/462, E38/523, Partial Surrender Report for the period 21/01/1996- 12/11/2003. |
| A64258 | 2002 | Placer (Granny Smith) Pty Ltd | Barnicoat | 1.2% | Annual Report on exploration for the period 1 January 2001 to 31 December 2001 Barnicoat Project P39/3239, 329 |
| A64307 | 2002 | Anglogold Australia Ltd | Jubilee Well | <1% | Annual Report for the period 21 January 2001 to 20 January 2002 Jubilee Well JV E38/462, E38/523 & E338/524. |
| A64321 | 2002 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | 55% | Annual Report on exploration Sunrise-Sunset Project M39/217, P39/3076, 3090-3091, 3119, 3238, 3240, 3294 for t |
| A64488 | 2002 | Anglogold Australia Ltd | Sunrise Dam | 99% | Annual Report For The Period 1 January 2001 to 31 December 2001. Report No: WA 12052. Combined Report No: C144 |
| A65163 | 2002 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447, E38/448, E39/387, E39/389 & E39/483 M38/675, & M38/677 Verification report for the |
| A65544 | 2002 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 15% | Project E39/347, E39/786 Annual Report On Exploration For The Period 1st July 2001 To 30th June 2002 Group Rep |
| A65956 | 2002 | Placer (Granny Smith) Pty Ltd | Sunset | 100% | Final Surrender Report on exploration for the period 11/8/93 through to 27/11/02 Sunset Lease P39/3119 |
| A65497 | 2002 | Sons Of Gwalia Ltd | Wilga Well West | 4.8% | Wilga Well West JV Annual Report For The Period 12/10/01 - 11/10/02 Tenement: E39/378. Report No. 0451-2002-01 |
| A61788 | 2001 | Sons Of Gwalia Ltd | Wilga Well | <1% | Wilga Well Annual Report for the period 25/11/99-24/11/00 tenement E39/327. |
| A62104 | 2001 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | 55% | Annual Report on exploration Sunrise/Sunset Project M39/217, P39/3075, 3090-3091, 3119, 3238, 3240, 3294 for t |
| A62105 | 2001 | Placer (Granny Smith) Pty Ltd | Barnicoat | 1.2% | Annual Report on exploration Barnicoat Project P39/3239, 3291, 3292, 3293; E38/494; M38/361, 362, 483 1 Januar |
| A62476 | 2001 | Sons Of Gwalia Ltd | Jubilee Well | 27% | Jubilee Well Project Annual Report For The Period 24 February 1999 - 23 February 2000 Tenement: E38/449. |
| A62718 | 2001 | Anglogold Australasia Ltd | Pippin | 97% | Pippin Project P39/2985 & P39/2986 Annual Report For The Period 12 May 2000 to 11 May 2001. Report No: 08.1157 |
| A63421 | 2001 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 15% | Wilga Dam Project Mount Margaret Mineral Field Western Australia Annual Report On Exploration For The Period 1 |
| A63512 | 2001 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447, E38/448, E39/387, E39/389 & E39/ 483, M38/677, M38/690, M38/691 & M38/692 Mount Ma |
| A63759 | 2001 | Sons Of Gwalia Ltd | Wilga Well | <1% | Wilga Well Annual Report for the period 25/11/00 - 24/11/01 tenement: E39/327. Report No: 0450-14. |
| A63625 | 2001 | Sons Of Gwalia Ltd | Wilga Well West | 4.8% | Wilga Well West JV Annual Report for the period 12/10/00-11/ 10/01 tenement E39/378. |
| A60349 | 2000 | Sons Of Gwalia Ltd | Wilga Well West | 4.8% | Wilga Well West JV, Annual Report for the Period 12/10/1998 to 11/10/1999, E39/378. |
| A59851 | 2000 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | 55% | Annual Report On Exploration Sunrise-Sunset Project M39/217, P39/3076,3090-3091,3119 For The Period 01/01/1999 |
| A60182 | 2000 | Acacia Resources Ltd | Jubilee Well | <1% | Jubilee Well J.V; E38/462, E38/523 and E38/524; Annual report for the period 21/01/1999 to 20/01/2000 |
| A60321 | 2000 | Acacia Resources Ltd | Sunrise Dam | 99% | Sunrise Dam Project, M39/347-348,357,366,373-376, M38/426, Annual Report for the Period 1/1/1999 to 31/12/1999 |
| A60543 | 2000 | Placer (Granny Smith) Pty Ltd | Barnicoat | 1.2% | Annual Report on Exploration, Barnicoat Project, P39/3239,32 3291-3293,E38/494,M38/361,362,483, Mt Margaret Go |
| A60643 | 2000 | Sons Of Gwalia Ltd | Wilga Well | <1% | Wilga Well, Annual Report for the Period 25/11/98 to 24/11/1999, E39/327. |
| A61259 | 2000 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project, E38/447,448,457,E39/389,483,M38/675,677, 690-692, Annual Report for the period ending 30t |
| A61260 | 2000 | Placer (Granny Smith) Pty Ltd | Wilga Dam | 15% | Wilga Dam E39/347 Annual Report on Exploration for the Period 1 July 1999 to 30 June 2000. C314/1995 Grid Ref: |
| A61954 | 2000 | Anglogold Australasia Ltd | Sunrise Dam | 99% | Sunrise Dam Project M39/347, M39/348, M39/357, M39/366, M39/373, M39/375, M39/376, M39/426 & M39/374 Verificat |
| A62054 | 2000 | Anglogold Australasia Ltd | Jubilee Well | <1% | Jubilee Well Project E38/462, E38/523 and E38/524 Verification Report, Annual Report for the period 21 January |
| A57548 | 1999 | Sons Of Gwalia Ltd | Wilga Well West | 4.8% | Wilga Well West JV Annual Report For 12/10/97 - 11/10/98 E39/378 |
| A57542 | 1999 | Sons Of Gwalia Ltd | Wilga Well | <1% | Wilga Well - Annual Report For the Period 25/11/97-24/11/98 E29/327 |
| A57593 | 1999 | Acacia Resources Ltd | Jubilee Well | <1% | Acacia Resources Ltd Aurora Gold W.A Ltd Jubilee Well J.V E38/462,523.524 Annual Report For the Period 21/01/1 |
| A57772 | 1999 | Placer (Granny Smith) Pty Ltd | Barnicoat | 1.2% | Barnicoat Project-P39/3239, 3291-3293, E38/494, M38/361-362, M38/483 for the period 01/01/98 - 31/12/98 |
| A58027 | 1999 | Placer (Granny Smith) Pty Ltd | Sunrise - Sunset | 55% | Sunrise - Sunset Project, Annual Report for the period 1st Janaury 1998 to 31st December 1998, M39/217; P39/ |
| A59057 | 1999 | Sons Of Gwalia Ltd | Jubilee Well | 27% | Jubilee Well JV Project (formerly Sunrise Dam JV Project) Annual report for the period 24/02/98-23/02/99, E38/ |
| A59071 | 1999 | Exodus Minerals Ltd | Wilga Dam | 15% | Annual report Wilga Dam Exploration Licence 39/347 Prospecting Licences 39/2985 &39/2986 for the period 01/07/ |
| A59288 | 1999 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447,448,457,387,389,483, Annual Report for the period ending 30/06/1999. |
| A53829 | 1998 | Acacia Resources Ltd | Sunrise Dam | 99% | Sunrise Dam Project M39/347, 348, 357, 366, 373-376, M38/426 Annual Report - Period Ending: 31/12/1997 |
| A54452 | 1998 | Placer (Granny Smith) Pty Ltd | Sunset | 55% | Sunrise/Sunset Project, Mt Margaret Goldfield, W.A. 01/01/97 - 31/12/97 M39/217, P39/3076, 3090-3091, 3119, 32 |
| A54524 | 1998 | Placer (Granny Smith) Pty Ltd | Barnicoat | <1% | Barnicoat Project, [8th] Annual Report 01/01/97 - 31/12/97, P38/2380, P39/3239, 3292-3293, P38/2380, E38/437, |
| A56033 | 1998 | Exodus Minerals Ltd | Wilga Dam | 15% | Annual Report - Wilga Dam Exploration Licence:39/347, Prospecting Licence:39/2985-2986 01/07/97 - 30/06/98 |
| A56250 | 1998 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 E39/483 Fifth Annual report on Exploration period e |
| A56263 | 1998 | Sons Of Gwalia Ltd | Sunrise Dam | 50% | Sunrise Dam JV Project Annual report for the period 24/02/97-23/02/98 E38/449 E39/421. |
| A57146 | 1998 | Acacia Resources Ltd | Sunrise Dam | 99% | Sunrise Dam Project M39/347, 348, 366, 372, 374, 375, 376, M38/426 Annual Report for the period ending 31/12/9 |
| A50043 | 1997 | Sons Of Gwalia Ltd | Wilga Well | <1% | Wilga Well Joint Venture Annual report for the year ending 24th November 1996 Tenement E39/327 |
| A50186 | 1997 | Acacia Resources Ltd | Brumby Well | <1% | Jubilee Well Joint Venture E38/462 E38/523 and E38/524 Annual report for the period 21/01/96 to 20/01/97 Repor |
| A50393 | 1997 | Acacia Resources Ltd | Sunrise Dam | 99% | Sunrise Dam Project M39/347 M39/348 M39/357 M39/366 M39/373` M39/374 M39/375 M39/376 and M38/426 annual report |
| A50913 | 1997 | Placer (Granny Smith) Pty Ltd | Sunset | 55% | Annual report on Exploration Sunrise/ Sunset Project M39/217 P39/3076 P39/3090 to P39/3091 P39/3119 P39/3238 P |
| A51563 | 1997 | Sons Of Gwalia Ltd | Sunrise Dam | 50% | Sunrise Dam Joint Venture Annual report for the year ending 23rd February 1997 Tenements E38/449 E39/421. |
| A51588 | 1997 | Placer (Granny Smith) Pty Ltd | Barnicoat | <1% | Barnicoat Project P38/2380 P38/3239 P38/3291 P38/3292 P38/3293 E38/437 E38/482 E38/494 E38/502 M38/313 M38/361 |
| A52163 | 1997 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 E39/483 Mount Margaret Mineral Field Western Austra |
| A52374 | 1997 | Wmc Resources Ltd | Wilga Dam | 15% | Annual Report 01/07/96-30/06/97 Wilga Dam E39/347 P39/2985 P39/2986 P39/3396 (Edjudina SH51-6 1:250 000) |
| A53166 | 1997 | Acacia Resources Ltd | Brumby Well | <1% | Jubilee Well J.V. E38/462, 523, 524 Laverton, North-Eastern Goldfields, Yilgarn W.A. Annual Report, 21/01/97 |
| A46521 | 1996 | Gasgoyne Gold Mines Nl | Wilga Well West | 4.8% | Wilga Well West Joint Venture E39/378 Annual report for the year ending 11 October 1995 |
| A46846 | 1996 | Gasgoyne Gold Mines Nl | Sunrise Dam North | 50% | Sunrise Dam North E38/449 and Sunrise Dam West E39/421 Annual Report for the year to 23 February 1996 |
| A49079 | 1996 | Placer (Granny Smith) Pty Ltd | Lake Carey | <1% | Lake Carey Project E38/447 E38/448 E38/457 E39/387 E39/389 and E39/483 Mount Margaret Mineral Field Western A |
| A46873 | 1996 | Gasgoyne Gold Mines Nl | Wilga Well | <1% | Wilga Well E39/327 Annual report for the year to 24 November 1995 |
| A46883 | 1996 | Delta Gold Ltd | Lake Carey | 100% | Surrender Report for the period 1996 Lake Carey Project E39/400 |
| A47027 | 1996 | Placer Exploration Ltd | Barnicoat | <1% | Barnicoat Project P38/2380 P38/2396 P39/3239 P39/3291 P39/3292 P39/3293 E38/395 E38/437 E38/482 E38/494 E38/50 |
| A47061 | 1996 | Acacia Resources Ltd | Sunrise Dam | 100% | Sunrise Dam Project E39/174 E39/206 E39/263 E39/229 and P38/2587 Annual report for the period ending 31 Decemb |
| A47216 | 1996 | Aurora Gold Ltd | Brumby Well | <1% | H468 Brumby Well Project Western Australia Annual Technical Report for the period 21 January 1995 to 20 Januar |
| A47500 | 1996 | Placer Prospecting Pty Ltd | Sunrise/Sunset | 55% | Second Annual report on Exploration Sunrise/Sunset Project M39/217 P39/3076 P39/3090 P39/3091 P39/3238 P39/324 |
| A48993 | 1996 | Wmc Resources Ltd | Wilga Dam | 15% | Annual report for the period 1 July 1995 to 30 June 1996 Wilga Dam Project Exploration Licence E39/347 Prospec |
| A43353 | 1995 | Gasgoyne Gold Mines Nl | Sunrise-Wilga | 4.8% | Sunrise-Wilga projects Wilga West - E39/378 Annual report for the year to 11th October 1994 |
| A43738 | 1995 | Gasgoyne Gold Mines Nl | Sunrise Dam West | 96% | Sunrise Dam West Project E29/421 Annual Report for year to 15 December 1994 |
| A44129 | 1995 | Gasgoyne Gold Mines Nl | Sunrise Dam North | 27% | Sunrise Dam North Project E38/449 Annual Report for the year to 23 February 1995 |
| A44189 | 1995 | Aurora Gold Ltd | Brumby Well | <1% | Annual Techincal Report Brumby Well Project Western Australia Exploraton Licences 38/462,38/523 and 38/524 For |
| A44303 | 1995 | Acacia Resources Ltd | Sunrise Dam | 100% | Sunrise Dam Group, Annual Report for the period 1 January to 31st December 1994. E39/174, 206, 229, 263 and P3 |
| A45235 | 1995 | Placer Exploration Ltd | Lake Carey | 1% | The Lake Carey project E38/447, E38/448, E38/457, E39/387, E39/389, E39/400, P39/2797, P39/2798, P38/2799, P39 |
| A46533 | 1995 | Gasgoyne Gold Mines Nl | Sunrise Dam North east | 13% | Sunrise Dam North East P38/2590 to P38/2592 Annual report for the year ending 16 August 1995 |
| A43702 | 1995 | Placer Exploration Ltd | Barnicoat | <1% | Barnicoat Project E38/298, 395, 437, 482, 502, 537, 494, P38/2380, 2393-2399 INCL. 2404, 2405, 2408, 2423-2429 |
| A43703 | 1995 | Gasgoyne Gold Mines Nl | Wilga Well | <1% | Wilga Well project. Wilga Well- E39/327 Annual report for year to 24th November 1994 |
| A45239 | 1995 | Western Mining Corporation Ltd | Wilga Dam | 15% | Annual report for the period 1 July 1994 to 30 June 1995 The Wilga Dam Project Exploration Licence E39/347 Pro |
| A40299 | 1994 | Billiton Australia Pty Ltd | Sunrise Dam | 100% | Annual Report for the period 01/01/93-31/12/93 Sunrise Dam Project E39/174,206,229,263 |
| A41746 | 1994 | Placer Exploration Ltd | Barnicoat | 2.5% | Annual Report for the period 11/02/93-10/02/94 Barnicoat Project E38/494 |
| A42133 | 1994 | Placer Exploration Ltd | Lake Carey | 1% | Annual Report for the period 01/07/93-30/06/94 Lake Carey Peroject E38/447-448,457 E39/387,389,400,2797-2801 |
| A42285 | 1994 | Western Mining Corporation Ltd | Wilga Dam | 15% | Annual Report for the period 28/10/92-30/06/94 The Wilga Dam Project E39/347 P39/2985-2986 (Edjudina, SH51-6, |
| A42348 | 1994 | Placer Exploration Ltd | Sunrise | 100% | Annual report on exploration Sunrise M39/217 Mt Margaret Goldfield, WA For the year period 14/02/93 to 30/06/9 |
| A41168 | 1994 | Gasgoyne Gold Mines Nl | Sunrise Dam North | 27% | Annual Report for the Sunrise Dam North Prospect E38/449 ,for the period 01/02/1993 to 10/02/1994. |
| A41227 | 1994 | Aurora Gold Ltd | Brumby Well | <1% | Annual Technical Report Period: 21/01/93 to 21/01/94 Brumby Well Project E38/462, 38/523, 38/524 |
| A42103 | 1994 | Placer Exploration Ltd | Sunset | 30% | Annual Report for the period 06/93-06/94 Sunset Project P39/3090-91,3238-40,3076,& 3119 |
| A39256 | 1993 | Placer Exploration Ltd | Island | <1% | Annual Report for the period 09/08/92-08/08/93 The Island Project E38/447-448 E39/387 P38/2433-2439 |
| A38820 | 1993 | Billiton Australia Pty Ltd | Sunrise Dam | 100% | Annual Report for the period 01/01/92-31/12/92 Sunrise Dam Project E39/174,206,229,263 |
| A39397 | 1993 | Delta Gold Ltd | Sunrise | 100% | Annual Report for the period 14/02/92-13/02/93 Sunrise Project M39/217 |
| A40012 | 1993 | Billiton Australia Pty Ltd | Sunrise Central | 100% | Partial surrender report, Sunrise Central, E39/229. |
| A40013 | 1993 | Billiton Australia Pty Ltd | Sunrise West | 100% | Partial surrender report Sunrise West, E39/263 |
| A40536 | 1993 | Gasgoyne Gold Mines Nl | Wilga Well | <1% | Annual report for the period 25/11/92-24/11/93 Wilga Well Project E39/327 |
| A35400 | 1992 | Poseidon Exploration Ltd | Mount Weld | <1% | Mount Weld Project, Annual Report for the year ending 31/12/1991, E38/163. |
| A36331 | 1992 | Billiton Australia Pty Ltd | Soak Well | 100% | Soak Well Project,Partial Surrender Report,May 1992, E39/174 & E39/227. |
| A36624 | 1992 | Delta Gold Ltd | Sunrise Dam | 100% | Annual report (for the period 02/91-02/92) Sunrise Dam M39/217 July 1992 |
| A36820 | 1992 | Billiton Australia Pty Ltd | Sunrise Dam | 100% | Sunrise Dam Project, Partial Surrender Report July 1992, . E39/174, 206, 229; Surrender Report E39/230. |
| A37704 | 1992 | Gasgoyne Gold Mines Nl | Wilga Well | <1% | Annual report for the period ending November 1992 Wilga Well Project E39/327 |
| A35603 | 1992 | Billiton Australia Pty Ltd | Sunrise Dam | 100% | Annual report for 1 January 1991 to 31 December 1991 Sunrise Dam Project E39/174 E39/206 E39/229 E39/230 E39/2 |
| A32915 | 1991 | Poseidon Ltd | Mount Weld | <1% | Mt Weld Project, Annual Report for the year ending 31/12/1990, E38/163. |
| A33010 | 1991 | Billiton Australia Pty Ltd | Sunrise Dam | 100% | Annual report for 30 June 1989 to 31 December 1990 Sunrise Dam Project E39/174 E39/206 E39/227 E39/229 E39/230 |
| A33396 | 1991 | Poseidon Ltd | Mount Weld | <1% | Mount Weld Project,1990 Partial Surrender Report, February 1991, E38/163. |
| A35174 | 1991 | Newcrest Mining Ltd | Sunrise Dam | 100% | Final Report from Soak Well Joint Venture from February 1991 to May 1991. E39/174 and E39/227. Billeton Austr |
| A33196 | 1991 | Billiton Australia Pty Ltd | Freshwater Swamp | 100% | Freshwater Swamp Project,Partial Surrender Report, 21st March 1991, E39/174. |
| A33983 | 1991 | Delta Gold Ltd | Sunrise Dam | 100% | Sunrise Dam M39/217 Annual Report for 1990 Project No:374 |
| A30632 | 1990 | Poseidon Ltd | Mount Weld | <1% | Annual report 1989. Mt. Weld Project. E38/163. Laverton Sh51-2 |
| A30847 | 1990 | Freeport Of Australia Inc | Mount Weld | <1% | Mt Weld Project, Annual report, 1988. E38/163 |
| A28729 | 1989 | Billiton Australia Pty Ltd | Sunrise Dam | 100% | Annual report ending 30 June 1989, Sunrise Dam Project, E39/174, E39/206, E39/227, E39/229, E39/230, P39/215 |
| A9273 | 1973 | Us Steel International Inc | Ghost Rock | 13% | Ghost Rock Project, Non-statutory Report: 1972 Final Report, March 1973, MC29/1555-1560,1842, 2334-2335, 2337- |
| A3685 | 1973 | International Nickel Aust Ltd | Sunrise Dam | 12% | Sunrise Dam Project, Non-statutory Report: Brief Exploration Report for the period 2nd September 1970 to 19th |
| A6945 | 1973 | Kennecott Exp Aust Pty Ltd | Erlistoun | <1% | Aeromag- Raw Data |
| A2691 | 1972 | Australian Selection Pty Ltd | Wilga | 7.7% | Wilga Project, Annual Report for the period ending 31/12/1971, TR70/3747; MC39/62-115, 136-143, 191-219, 911-9 |
| A2584 | 1970 | Mines Administration Pty Ltd | Lake Carey - Sunrise Dam | 71% | Non-statutory Report on Lake Carey - Sunrise Dam Block of Mineral Claims MC 2159 - 2170, MC 2260-2265, MC 2440 |
| A1366 | 1970 | Australian Selection Pty Ltd | Wilga | 13% | Wilga Area, Annual Report for the year ending 31/12/1969, TR70/3747H; MC39/62-115, 136-143, 191-209, 911-939 & |
| A60588 | 1970 | Mines Administration Pty Ltd | Lake Carey / Sunrise Dam | 71% | Report on Lake Carey - Sunrise Dan Block of Mineral Claims MC39/2159 to MC39/2170, MC39/2260 to MC39/2265, MC3 |
| A1365 | 1968 | Australian Selection Pty Ltd | Wilga | 3% | Wilga Project, Non-statutory Report: Annual Report [s] 1966-1968, for the period ending 31/12/1968, TR70/3747, |
| A50044 | 1753 | Sons Of Gwalia Ltd | Wilga Well West | 4.8% | Wilga Well West Joint Venture Annual report for the year ending 11th October 1996 Tenement E39/378 Report No.0 |
| A92248 | 1753 | Saracen Gold Mines Pty Ltd | WILGA WELL | 3.3% | WILGA WELL E39/1304 SURRENDER REPORT, 11 AUGUST 2008 TO 14 OCTOBER 2011 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
All 253 report numbers over this ground
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over M 39/1116 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold M 39/1116? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.